7243 search results for Pavement

102-120

or Rigid Pavement for Roadside Safety Low Profile Barrier Portable Temporary 6 ' - 0 " O f f s, with the exception that miscellaneous asphalt pavement in accordance present, construct 2" Asphalt Pad using 2. ASPHALT PAD: Where existing pavement is not can only be used on flexible or rigid pavement. 1

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/idx/102-120.pdf?sfvrsn=616fd3ad_1

PublicHearing_FLAGLER COUNTY_Summary_2024-2028

- FLAGLER-FLAGLER CO PAVEMENT EXTENSION Type of Work: AVIATION PRESERVATION PROJECT Phase Funding, PARK STREET Type of Work: FLEXIBLE PAVEMENT RECONSTRUCT. Phase Funding Source 2024 2025 2026 2027, (VARIOUS LOCATIONS) Type of Work: FLEXIBLE PAVEMENT RECONSTRUCT. Phase Funding Source 2024 2025 2026, PARK STREET/CR-35 FROM CR-302 TO SR-100 Type of Work: FLEXIBLE PAVEMENT RECONSTRUCT. Phase Funding

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_flagler-county_summary4f0453b2f0404315ad9f23c0e730fae8.pdf?sfvrsn=9c44104f_4

E57C9-R0

REWORKING UTILITY STRIPS SY 2,000.000 E577- 71- BLADING PAVED SHOULDER, UP TO 24" BEYOND PAVEMENT LF

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2023/nov07/e57c9-r0.pdf?sfvrsn=fa58a6a5_1

SPI-700-120

Assembly FY 2024-25 2 Plan Content Requirements Identify and tabulate in the Signing and Pavement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-700-120.pdf?sfvrsn=2d9d79a1_1

TP-02-13-24BSN

and an expanded passenger car parking at the West Palm Beach Service Plaza (MP94) in Palm Beach County. Pavement, services, roadway and parking lot lighting, signing and pavement markings, drainage and stormwater, SPECIAL DETOUR- TEMPORARY PAVEMENT (44262515201) LS 1.000 0102- 2-300 SPECIAL DETOUR- TEMPORARY, 21,641.000 0327- 70- 6 MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH SY 3,024.000 0327- 70- 11 MILLING EXISTING ASPHALT PAVEMENT, 2 1/4" AVG DEPTH SY 1,252.000 0327- 70- 20 MILLING EXISTING ASPHALT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/feb13/tp-02-13-24bsn.pdf?sfvrsn=1dde5fba_1

E59B2

PAVEMENT, 1" AVG DEPTHSY1,701.000 0334- 1- 12SUPERPAVE ASPHALTIC CONC, TRAFFIC BTN403.100 0334- 1

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2024/feb06/e59b2.pdf?sfvrsn=1c624dfd_1

E21L6-R0

ditches, retention areas, ditch pavement joints, pipe end treatments, miscellaneous drainage structures

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2024/feb15/e21l6-r0.pdf?sfvrsn=b9d0683_1

E8V02BidTabs

as Lump Sum 0001 (CONCRETE REPAIR (CY SECTION: 0075 E524 1 1 CONCRETE DITCH PAVEMENT REPAIR 10.000 CY 600.01210 6,000.12 900.00000 9,000.00 500.00000 5,000.00 0080 E524 2 1 CONCRETE SLOPE PAVEMENT, CONCRETE DITCH PAVEMENT REPAIR 10.000 CY 4,000.00000 40,000.00 0080 E524 2 1 CONCRETE SLOPE PAVEMENT REPAIR 5.000 CY 4,000.00000 20,000.00 0085 E700 96 1 SIGN SUPPORT REPAIRS (ALUMINUM

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/bid-tabs/2024/jan09/e8v02bidtabs.pdf?sfvrsn=70dc4367_1

E21F9

and dispose of concrete ditch pavement, concrete sidewalk, cur cut ramps, cur and gutter, driveways

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2024/mar13/e21f9.pdf?sfvrsn=4a329480_1

E53C7

of pavement and the right of way line, including shoulders, front slopes, back slopes and ditches

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2024/apr02/e53c7.pdf?sfvrsn=e9bef725_1

448930-1_ERC_PH2_CommentsandResponses

in this Phase II submittal: **Roadway Plans **Signing and Pavement Marking Plans. The following, Chapter 8, Section 8.1, of the Flexible Pavement Design Manual, when paved shoulders are 5' wide, widths that vary from 5' to 6'. The pavement designs for the travel lanes & shoulders will not permit, with the Department on the preferred approach between using dense and open graded pavement. Chris, Smidebush 1/15/2024 1 As this project has been revised to a Pavement Only Project, we were trying

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25115/448930-1_erc_ph2_commentsandresponses.pdf?sfvrsn=5b0c8de4_1
20 of 7243 results