1272 search results for temporary steel bridge

4600000.FHWA

Bridge: Unspliced rolled sections and pedestrian bridges AISC Simple Bridge Highway Metal Components, , steel strain poles, bridge rail, stairs, walkways, grid decks, scuppers, expansion joints, bearings, by the AASHTO Guide for Highway Bridge Fabrication with HPS70W Steel. Fabricate all unpainted steel elements, Structures - required for miscellaneous components or as approved by the Engineer. 2. Simple Steel Bridge, Steel Bridges - Required for all steel bridges (including welded or bolted truss structures

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/fhwa/4600000.fhwa.pdf?sfvrsn=af6b0a90_0

E4X79

(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 730 Total Bridge Length: 0.000, structural steel on Traffic Signal Mast Arms (TSMA) using paint and metalizing systems. This contract, for this project. PLEASE READ STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION FY 2024-25, - PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY ED 300.000 0102-115- TYPE III BARRICADE ED 1,000.000 0561- 2- COATING EXISTING STRUCTURAL STEEL SF 8,448.000 Page 6 Bid Solicitation Notice - Proposal Item

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2025/apr04/e4x79.pdf?sfvrsn=ca314bd0_1

TP-03-28-25BSN

Structures 0110- 3- REMOVAL OF EXISTING STRUCTURES/BRIDGES (43721115201 BRIDGE ID 870182) LS 1.000 0110- 3- REMOVAL OF EXISTING STRUCTURES/BRIDGES (43721115201 BRIDGE ID 870395) LS 1.000 0110- 3- REMOVAL OF EXISTING STRUCTURES/BRIDGES (43721115201 BRIDGE ID 870397) LS 1.000 0110- 3- REMOVAL OF EXISTING STRUCTURES/BRIDGES (43721115201 BRIDGE ID 870546) LS 1.000 0110- 12- 1 HYDRODEMOLITION, STEEL - BRIDGE SUPERSTRUCTURE LB 91,465.000 0415- 1- 5 REINFORCING STEEL- BRIDGE SUBSTRUCTURE LB

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/mar28/tp-03-28-25bsn.pdf?sfvrsn=c887aa8c_1

D005011m.do

for ‘Slippery When Wet’, designation ‘W8-5’ shall be placed in advance of bridges with steel decks. Index, movable and non-movable steel deck bridges.”, No. 201 (Sheet 2 of 6), ‘TEMPORARY DRAINS FOR SUBGRADE AND BASE’, ‘Note:’, Second sentence –Second, ’, ‘Reinforcing Steel’, ‘kg’, ‘RCP’ & ‘CMP’ – Quantities 495 deleted and 315 substituted. Index No. 251 (Sheet 2 of 2), ‘ESTIMATED QUANTITIES’, ‘Reinforcing Steel’, ‘kg’, ‘RCP’ & ‘CMP’ – Quantities 587 deleted

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2003/january-2003/workbook/d005011m.do.pdf?sfvrsn=f5e2d4e2_0

D005011m.do

for ‘Slippery When Wet’, designation ‘W8-5’ shall be placed in advance of bridges with steel decks. Index, movable and non-movable steel deck bridges.”, No. 201 (Sheet 2 of 6), ‘TEMPORARY DRAINS FOR SUBGRADE AND BASE’, ‘Note:’, Second sentence –Second, ’, ‘Reinforcing Steel’, ‘kg’, ‘RCP’ & ‘CMP’ - Quantities 495 deleted and 315 substituted. Index No. 251 (Sheet 2 of 2), ‘ESTIMATED QUANTITIES’, ‘Reinforcing Steel’, ‘kg’, ‘RCP’ & ‘CMP’ – Quantities 587 deleted

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2004/january-2004/workbook/d005011m.do.pdf?sfvrsn=193ea896_0

SS1020000

of bridge components. Theskidresistance of open steel grid decking on the detour bridge may decrease, No. 415 or 414 as specified in the plans. Ensure that temporary concrete barrier wall for use on bridge, . Maintaintrafficwithinthelimits of the project for the duration of the construction period, including any temporary, and temporary facilities, under all weather conditions. Keep the lanes reasonably free of dust, potholes, becomes necessary to divert traffic from any existing roadway or bridge, or wherever construction

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2009/january-2009/workbook/ss1020000.pdf?sfvrsn=dd67c17f_0

SS1020000

of bridge components. Theskidresistance of open steel grid decking on the detour bridge may decrease, No. 415 or 414 as specified in the plans. Ensure that temporary concrete barrier wall for use on bridge, . Maintaintrafficwithinthelimits of the project for the duration of the construction period, including any temporary, and temporary facilities, under all weather conditions. Keep the lanes reasonably free of dust, potholes, becomes necessary to divert traffic from any existing roadway or bridge, or wherever construction

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2009/january-2009/workbook/ss1020000f4f1a13498ef4296b3fb2f5498901ec9.pdf?sfvrsn=4f3a0087_0

1020100.impl

, 415 or 414. Temporary barrier used on bridge and retaining wall sections must comply with Design, No. 414. Temporary steel barrier may be used as an alternative to Design Standards, Index No. 414. Temporary steel barrier shall meet the NCHRP Report 350 or MASH TL-3 criteria and be listed on the APL, the portable temporary lane separator with a removable anchor bolt. Use epoxy on bridge decks where, for the duration of the construction period, including any temporary suspensions of the work. Construct

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/january-2017/review/implemented/1020100.impl.pdf?sfvrsn=e7f4a52a_0

E4W47

REINFORCING STEEL- BRIDGE SUBSTRUCTURE LB 1,002.000 0425- 1-541 INLETS, DT BOT, TYPE D, , No: N/A Total Roadway Length: 4.219 Miles Contract Days: 413 Total Bridge Length: 0.000 Miles, for this project. PLEASE READ STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION FY 2023-24 (SECTION, (43999935201) LS 1.000 0102- 3- COMMERCIAL MATERIAL FOR TEMPORARY DRIVEWAY MAINTENANCE CY 86.300, - PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY ED 1,708.000 0104- 10- 3 SEDIMENT BARRIER LF

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2024/mar01/e4w47.pdf?sfvrsn=ba9d2051_1

102WZCD 2024-25

unless noted otherwise in the Standard Plans. Proprietary temporary concrete, steel, or water, the portable temporary lane separator with a removable anchor bolt. Use epoxy on bridge decks where, for initiating, installing, and maintaining all temporary traffic control devices as described, direction of all temporary traffic control on the project. 2.Is on site during all set up and take, operations ensuring proper temporary traffic control. 4.Immediately corrects all safety deficiencies

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/otherfdotlinks/developmental/files/102wzcd-2024-25.pdf?sfvrsn=128601cf_1

102WZCD 2025-26

. Proprietary temporary concrete, steel, or water filled barrier used must be listed on the APL, for initiating, installing, and maintaining all temporary traffic control devices as described, direction of all temporary traffic control on the project. 2.Is on site during all set up and take, operations ensuring proper temporary traffic control. 4.Immediately corrects all safety deficiencies, of an emergency situation and is prepared to respond to maintain temporary traffic control or to provide

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/otherfdotlinks/developmental/files/102wzcd-2025-26.pdf?sfvrsn=6140fe32_1

2025FDM215RoadsideSafety

on bridges where no drop-off is present. Transitions from Low Profile Barrier to other temporary barriers, . Anchored (bolted) temporary barriers are not permitted on bridge superstructures that contain post, or APL for the specific type of temporary barrier (i.e. temporary concrete, steel, or water, . Anchored (bolted) temporary crash cushions are not permitted on bridge superstructures that contain, . When determining minimum lateral offset for bridge piers and abutments, coordinate

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm215roadsidesafety.pdf?sfvrsn=da6d8549_3

2025FDM215RoadsideSafety

Barrier on bridges and other concrete barrier systems on the adjoining roadway. Proprietary steel, some systems. Anchored (bolted) temporary barriers are not permitted on bridge superstructures, of temporary barrier (i.e. temporary concrete, steel, or water filled); or, (3) Flaring outside, are not permitted. Anchored (bolted) temporary crash cushions are not permitted on bridge superstructures, or adjacent bridges are exempt from the bridge traffic railing setback requirements of Table

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm215roadsidesafety.pdf?sfvrsn=f3a40d5_1

DEV102-990WZCD (eff 7-1-25 thru 12-31-25)

unless noted otherwise in the Standard Plans. Proprietary temporary concrete, steel, or water, temporary lane separator with a removable anchor bolt. Use epoxy on bridge decks where anchoring, , and maintaining all temporary traffic control devices as described in this Section and the Contract, in Section 105. The WTS is to perform the following duties: 1.On site direction of all temporary, temporary traffic control. 4.Immediately corrects all safety deficiencies and corrects minor deficiencies

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/special-case/developmental/dev102-990wzcd-(eff-7-1-25-thru-12-31-25).pdf?sfvrsn=afd62e0_1

2025FDM907RFPConceptPlans

and area size Bridges and bridge culverts with begin & end stations Flood Data Summary (if applicable, and detention ponds, pond number and area size Bridges and bridge culverts with begin & end stations Flood, ) Control drawings for critical temporary walls Bridge Hydraulics Recommendation Sheet Report of core, names and R/W lines Begin & end of project stations Begin & end of bridges stations Drainage areas, and exceptions Curve data Existing R/W lines Begin & end project stations Begin & end bridge stations

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm907rfpconceptplans.pdf?sfvrsn=df1699d3_1

Structural Materials_Makeup Session 01-21-2025

Inspection Progra m 74 • Steel Bridges • Cantilever Signs • Tr u s s e s • Gantries • 75, in]) Ex. Use of Flowing and SCC Concrete I-395 Signature Bridge in Miami (District 6) Flowing, Fiber reinforced concrete bridge decks, to be used with precast deck slabs. David Cerlanek, Approach Slab Replacement UHPC – District 6 – Bridge Rehabilitation Project in Miami Mass Concrete, of the bridges. – Utilize the SMO lab facilities to test new technologies. WHAT IS CORROSION

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2024-fall-construction-academy/structural-materials_makeup-session-01-21-2025.pdf?sfvrsn=dde6207c_1

TP-06-21-24BSN

Structures 0110- 3- REMOVAL OF EXISTING STRUCTURES/BRIDGES (40614355201 BRIDGE ID 930447) LS 1.000 0110- 3- REMOVAL OF EXISTING STRUCTURES/BRIDGES (40614355201 BRIDGE ID 930565) LS 1.000 0110- 3- REMOVAL OF EXISTING STRUCTURES/BRIDGES (40614355201 BRIDGE ID 931004) LS 1.000 0110- 3- REMOVAL OF EXISTING STRUCTURES/BRIDGES (40614355201 BRIDGE ID 934971) LS 1.000 0400- 0- 11 CONCRETE, 121.200 0400-148- PLAIN NEOPRENE BEARING PADS CF 78.000 0415- 1- 4 REINFORCING STEEL - BRIDGE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/jun21/tp-06-21-24bsn.pdf?sfvrsn=df924bb0_1

Standard Plans - FY 2018-19 Errata

06/18/2018 Temporary Barrier Corrected Note 7 102-600 3,6 of 12 07/24/2019 General Information, The "1/2" Galvanized Steel Plate" callout has been changed to "1/4" Galvanized Steel Plate" to correct, and Connections for Existing Bridges Corrected Sheet Number References. 546-010 1 of 3 06/14/2018, for Bridge Construction 521-426 4 of 4 01/01/2018 Traffic Railing - (Median 36" Single-Slope) Corrected fA & fB angles in CONVENTIONAL REINFORCING STEEL BENDING DIAGRAMS

https://www.fdot.gov/design/standardplans/2019/Errata.shtm

2024FDM907RFPConceptPlans

along proposed ditches Retention and detention ponds, pond number and area size Bridges and bridge, for critical temporary walls. Bridge Hydraulics Recommendation Sheet Report of core borings. Proposed, /W lines Begin & end stations for the project Begin & end bridge stations Proposed drainage, & end stations for the project Begin & end bridge stations Highwater elevation Final profile grades, & end of project stations Begin & end of bridges stations Drainage areas and flow directions

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm907rfpconceptplans.pdf?sfvrsn=ff772dd6_1

E4X08-R0

(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000, FOR ROAD AND BRIDGE CONSTRUCTION FY2023-24 (SECTION 7-13) FOR INSURANCE LIMITS. Call Order: 003, - 14- TRAFFIC CONTROL OFFICER HR 40.000 0102- 60- WORK ZONE SIGN ED 100.000 0102- 71- 13 TEMPORARY BARRIER, F&I, LOW PROFILE, CONCRETE LF 100.000 0102- 71- 23 TEMPORARY BARRIER, RELOCATE, LOW, 100.000 0102- 76- ARROW BOARD / ADVANCE WARNING ARROW PANEL ED 25.000 0102- 89- 1 TEMPORARY CRASH

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2023/dec01/e4x08-r0.pdf?sfvrsn=7b9aa1f7_1
20 of 1272 results