7241 search results for Pavement

0050700-REVISED.FHWA

to facilitate checking of subgrade, base, and pavement elevations in crossovers, intersections, and irregular, ,establishhorizontal controlsadequatetoensurethattheasphaltmix added matches with the existing pavement, the centerline of the existing pavement. Establishby an instrument survey, and mark on the surface of the finished pavement at 25 foot intervals, the points necessary for striping of the finished roadway, the pavement with white paint. If performing striping, the Engineer may approve an alternate method

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/fhwa/0050700-revised.fhwa.pdf?sfvrsn=f5bac6cf_0

SS9900202

of the products listed on the QPL. The pavement stripes and markings shall consist of high quality, Retroreflective Pavement Markers. Temporary Retroreflective Pavement Markers (RPM’s) shall meet, reflective face shall be completely visible and above the pavement surface after installation, measured from a line even with the pavement perpendicular to the face of the marker. (c) Optical Performance, materials for bonding the markers to the pavement that meet the requirements of Section 970

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/ss9900202.pdf?sfvrsn=d906022a_0

1020700int

and the following substituted: 102-10.1 Description: Furnish and install work zone pavement markings for MOT, is deleted and the following substituted: 102-10.4 Temporary Raised Pavement Markers (RPMs): Use Class B, is deleted and the following substituted: 102-11.20 Work Zone Pavement Markings: Painted pavement, on the project. The quantity of removable tape to be paid for pavement messages, symbols, and arrows, for removing conflicting pavement markings (paint, tape, thermoplastic, raised pavement markers, etc

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/internal/1020700int.pdf?sfvrsn=39afb671_1

2026 FDM Summary of Revisions

Roundabouts Ex. 213-3 1x1 Roundabout Signing and Pavement Markings, Ex. 213-4 1x2 Roundabout with Bypass Lane, Ex. 213-5 2x2 Roundabout Signing and Pavement Markings Icon added to exhibits, crosswalks. 692 213 - Modern Roundabouts 213.10 Signing and Pavement Markings Switched guidance from, refuge islands as an additional option. 585 230 - Signing and Pavement Marking 230.6.1 Midblock, - Signing and Pavement Marking 230.2.4 External Overhead Lighting Add a clarification

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026-fdm-summary-of-revisions.pdf?sfvrsn=22255b7e_3

E8W39BidTabs

rap, aluminum handrail, concrete slope pavement and other miscellaneous concrete repair, MISCELLANEOUS ASPHALT PAVEMENT 15.000 TN 50.00000 750.00 67.50000 1,012.50 90.00000 1,350.00 0020 0350 5 CLEANING & SEALING JOINTS- CONCRETE PAVEMENT 1,100.000 LF 1.00000 1,100.00 2.85000 3,135.00, PAVEMENT,NON REINFORCED, 4" 20.000 SY 100.00000 2,000.00 80.00000 1,600.00 200.00000 4,000.00, 4,680.00 439.00000 4,390.00 275.00000 2,750.00 0015 0339 1 MISCELLANEOUS ASPHALT PAVEMENT 15.000 TN

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/bid-tabs/2025/sep09/e8w39bidtabs.pdf?sfvrsn=d1b04911_1

DEV332FDR (4-9-24)

course constructed by in-place pulverizing and blending of the existing bituminous pavement, , and other additives. Pulverize existing asphalt pavement and underlying base material by a method, samples of the asphalt pavement material, underlying base material, and virgin materials, where, specifically designed for pavement reclaiming and capable of pulverizing and mixing pavement, base, of the existing pavement to at least six inches beyond the planned new width of the base. Keep the bottom

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/special-case/developmental/dev332fdr-(4-9-24)8064388d-a508-4d8f-a243-e857905631f6.pdf?sfvrsn=87b73bda_1

522-002

of the curb or edge of pavement. minimum depth of 2 feet measured perpendicular to the curb line, " 1 1 ' - 0 " ( S h o w n ) 2 ' - 0 " Pavement) (Grass Or Utility Strip A A 1, " ( S h o w n ) 2'-0" Detectable Warnings 4'-0" Min. 4'-0" Min. Pavement) (Grass Or Utility, 4 ' - 0 " Ramp CR-H C 2'-6" 1 0 ' - 0 " ( S h o w n ) 2 ' - 0 " Pavement, SIDEWALKS E E Varies (1'-6" Max.) (See Section C-C) Pavement Relief (If Needed) 5 ' - 0 " M i

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/idx/522-002.pdf?sfvrsn=d89fa765_1

2026 FDM Summary of Revisions

Roundabouts Ex. 213-3 1x1 Roundabout Signing and Pavement Markings, Ex. 213-4 1x2 Roundabout with Bypass Lane, Ex. 213-5 2x2 Roundabout Signing and Pavement Markings Icon added to exhibits, crosswalks. 692 213 - Modern Roundabouts 213.10 Signing and Pavement Markings Switched guidance from, refuge islands as an additional option. 585 230 - Signing and Pavement Marking 230.6.1 Midblock, - Signing and Pavement Marking 230.2.4 External Overhead Lighting Add a clarification

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026-fdm-summary-of-revisions.pdf?sfvrsn=c75d0127_1

D3-02-12-26BSN

under this District Contract consist of milling and resurfacing, flexible pavement reconstruction, base work, shoulder treatment, drainage improvements, curb and gutter, ditch pavement, and signing and pavement markings on State Road 10 (US 90A) from Perdido River Bridge to W of Beulah Rd, - MAINTENANCE OF TRAFFIC (45293015201) LS 1.000 0102- 2-200 SPECIAL DETOUR- TEMPORARY PAVEMENT (45293015201, - OPTIONAL BASE, BASE GROUP 11 SY 1,796.000 0327- 70- 2 MILLING EXISTING ASPHALT PAVEMENT, 3 1/2" AVG DEPTH

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2026/feb12/d3-02-12-26bsn.pdf?sfvrsn=bcce6cea_1

RGeneralConstructionOperationse

:10 or Flatter Asphalt Pad Pavement or Flexible or Rigid Pavement/Asphalt Width Setback Distance, Distance Edge of Travel Way Edge of Travel Way Asphalt Pad Pavement or Flexible or Rigid Barrier, CONDITION Free-standing OFFSET LATERAL WIDTH ASPHALT PAVEMENT/ DISTANCE SETBACK 2' Min, for the pavement, bridge deck, or asphalt pad surface within adjacent longitudinal pavement marking. 3, match pre-emergent herbicide is not required. Miscellaneous Asphalt Pavement in accordance

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/ser/rgeneralconstructionoperationse.pdf?sfvrsn=fd4e37db_1

2023 WP Project Summary_D6_10-09-2023

the number of travel lanes from four to six. Work includes pavement widening, milling and resurfacing, noise barrier wall installation, guardrail installation, signing and pavement marking improvements, pavement rehabilitation of the access roads and parking areas, lighting enhancements, and upgrades, includes pavement widening, milling and resurfacing, electronic toll collection gantry replacement, transportation systems (ITS) upgrades, signing / pavement markings, guardrail / safety improvements

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/turnpike-work-program-summaries/2023-wp-project-summary_d6_10-09-2023.pdf?sfvrsn=d71f0ae8_1

2023 WP Project Summary_D7 10-06-23

and pavement marking improvements. Phase Fiscal Year 5 Year Total 2025 2026 2027 2028 2029 PE, , and signing and pavement marking improvements. Phase Fiscal Year 5 Year Total 2025 2026 2027 2028 2029, , and signing and pavement marking improvements. Phase Fiscal Year 5 Year Total 2025 2026 2027 2028 2029, 37.3. Work includes milling and resurfacing, guardrail installation, and signing and pavement, paintings / rehabilitations, intelligent transportation systems (ITS) upgrades, signing / pavement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/turnpike-work-program-summaries/2023-wp-project-summary_d7-10-06-23.pdf?sfvrsn=77b07914_1

E1V08BidTabs

and gutter, lighting, signing and pavement marking, sidewalks, and utility improvements on SR 64, 400,000.00000 400,000.00 0015 0102 2200 SPECIAL DETOUR- TEMPORARY PAVEMENT 19602265201 (5414.000, 6 MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH 822.000 SY 30.00000 24,660.00 31.00000, 214,664.60 233.50000 218,882.90 0205 0350 5 CLEANING & SEALING JOINTS- CONCRETE PAVEMENT 383.000 LF 42.00000 16,086.00 32.00000 12,256.00 35.00000 13,405.00 0210 0350 30 13 CONCRETE PAVEMENT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/bidtabs/2023/nov23/e1v08bidtabs.pdf?sfvrsn=c880849d_1

D3-09-12-24BSN

and resurfacing, curb and gutter, signing and pavement markings, sidewalk ADA upgrades, handrail, ASPHALT PAVEMENT, 2" AVG DEPTH SY 169,588.000 Page 9 Bid Solicitation Notice - Proposal Item, EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH SY 5,053.000 0327- 70- 7 MILLING EXISTING ASPHALT PAVEMENT, - MISCELLANEOUS ASPHALT PAVEMENT TN 3.300 0425- 5- MANHOLE, ADJUST EA 5.000 0430-830- PIPE FILLING, PERFORMANCE TURF, SOD SY 138.000 0706- 1- 3 RAISED PAVEMENT MARKER, TYPE B EA 3,041.000 0710- 11-101

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2024/sep12/d3-09-12-24bsn.pdf?sfvrsn=f46943fa_1

FDOTSubassembliesExistingFeatures

; pavement, curbs, shoulders, sidewalks, as well as at grade traffic separators, guardrails, and Back line. Traffic Separators must lie between pavement pairs. Guardrails and Shoulders cannot lie between pavement geometry. Guardrails must be on the correct side layer in direction of alignment (Ex: RT or LT). To limit the number of pavement lines searched, create a line or polyline on ‘Scratch2’ to exclude areas of pavement not required in section. Adjusting the Corridor After

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cadd/downloads/webinars/files/autodesk/fdotsubassembliesexistingfeatures_803f1c59-0dde-4104-8437-6be3d24d7b2e.pdf?sfvrsn=d8d48e3_0

Developmental Design Standards

(30 ft.) (Flexible Pavement Approach) Steve Nolan IDDS-D20900 CEL-D20900 -- Permitted Projects FPID No(s):415250-1 D20910 Certification Statement Approach Slab (30 ft.) (Rigid Pavement, Slab (20 ft.) (Flexible Pavement Approach) IDDS-D20920 -- Permitted Projects FPID No(s): 211728-1, Pavement Approach) IDDS-D20930 -- Permitted Projects FPID No(s):438174-1 FIBER REINFORCED POLYMER BAR, Certification Statement Approach Slab - GFRP Reinforced (Flexible Pavement Approach) Steve Nolan IDDS-D22900

https://www.fdot.gov/roadway/ds/dev.shtm

PublicHearing_SUMTER COUNTY_Summary_2025-2029

$24,079,190 445295-1 - SR 471 FROM CR 478A TO SR 35/US 301 Type of Work: PAVEMENT ONLY RESURFACE (FLEX, 449234-1 $1,767,190 450635-1 - SR48/SR475 FROM BELT AVENUE TO NOBLE ROAD Type of Work: PAVEMENT, OF SR-471/TARRYTOWN RD Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2025 2026 2027 2028, 50 Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2025 2026 2027 2028 2029, $522,900 $2,516,161 452656-1 - SR 44 FROM W OF I-75 TO CR 229 Type of Work: PAVEMENT ONLY RESURFACE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_sumter-county_summary_2025-2029.pdf?sfvrsn=f7dc64f1_1

E59C0

, LAKE, MARION, ORANGE, OSCEOLA, SEMINOLE, SUMTER, VOLUSIA Road Name: Pavement Markings Limits, of the replacement of pavement markings and RPMs on state- maintained roadways within the District, Section 0001 PAVEMENT STRIPING (LARGE MACHINE) (LM) 0701- 17-101 PROFILED THERMOPLASTIC,STANDARD, THERMOPLASTIC, REMOVE EXISTING THERMOPLASTIC PAVEMENT MARKINGS- SURFACE TO REMAIN SF 22,000.000, PAVEMENT MARKER(REMOVE AND REPLACE)(CLASS B) EA 4,000.000 E711- 14- 1 THERMOPLASTIC, PREFORMED

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2025/jan07/e59c0.pdf?sfvrsn=27abb9a0_1

fm1-t168

and test(s) required. 4.1 FINISHED PAVEMENT 4.1.1 Apparatus 4.1.1.1 Diamond bit core drill, concrete saw, or another suitable device. 4.1.2 Procedure 4.1.2.1 Allow the pavement to cool sufficiently, of the pavement to expedite cooling. 4.1.2.2 Obtain the sample from the pavement by cutting with a diamond, , align the core barrel perpendicular to the surface of the pavement. Mark the direction

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/administration/resources/library/publications/fstm/methods/fm1-t168.pdf?sfvrsn=f9c29565_7

E8V57-R0BidTabs

infrastructure, signing and pavement markings, ITS systems, lighting components, minor roadway, PAVEMENT, 1 1/2" AVG DEPTH 100.000 SY 0135 0327 70 11 MILLING EXISTING ASPHALT PAVEMENT, 2 1/4" AVG DEPTH 100.000 SY 0140 0327 70 19 MILLING EXISTING ASPHALT PAVEMENT, 3/4" AVG DEPTH 100.000 SY, ASPHALT PAVEMENT 60.000 TN 0190 0425 1351 INLETS, CURB, TYPE P-5,

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/bid-tabs/2025/feb19/e8v57-r0bidtabs.pdf?sfvrsn=9ffdb11b_1
20 of 7241 results