1358 search results for Permits
6760206.FHWA
and permits manual selection of the power sources connected to the cabinet. 676-2.6.2 Generator Access Panel, that disables automatic switching and permits manual selection of the power sources connected
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/fhwa/6760206.fhwa.pdf?sfvrsn=c7abb403_0SP0070104-8.resp
; it is possible that federal permits (ex: USACE) issued for projects may have project-specific, conditions from agency permits issued and the FDOT's specs: "This specification does not replace
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/comments-responses/sp0070104-8.resp.pdf?sfvrsn=286b461c_06820202.FHWA
’s electrical wiring in accordance with applicable codes and permits, and with the NEC. SubmitHave, to the building’s electrical wiring in accordance with applicable codes and permits
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/fhwa/6820202.fhwa.pdf?sfvrsn=ab191abf_01200602.FHWA
that the necessary permits, rights, or waivers for the use of such areas have been secured, ,supplytheDepartment with evidence that the necessary permits, rights, or waivers for the use
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/fhwa/1200602.fhwa.pdf?sfvrsn=4cae5ab8_00070202.FHWA
a copy of the permit is http://www.dep.state.fl.us/water/stormwater/npdes/permits_forms.htmhttp, of the permit is http://www.dep.state.fl.us/water/stormwater/npdes/permits_forms.htm Inaccordance
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/fhwa/0070202.fhwa.pdf?sfvrsn=53ffccee_0F2040ITB
shall obtain all required permits and approvals necessary to complete the work. Copies of all required plans, permits, inspections and certifications are to be delivered to the Department Project
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/fco/f2040/f2040itb.pdf?sfvrsn=99c56b85_12021 FDOT Design Manual
Changeable Message Signs Drainage and Permits 250 251 RDB24-01 Hydraulic Data and Agency Permits Stormwater Pollution
https://www.fdot.gov/roadway/fdm/2021-FDM.shtmFDOT Design Manual
Message Signs Drainage and Permits 250 Hydraulic Data and Agency Permits 251 Stormwater Runoff Control Concept (SRCC) Development
https://www.fdot.gov/roadway/fdm/default.shtmF2042 Invitation to Bid
. The contractor shall obtain all required permits and approvals necessary to complete the work. Copies of all required plans, permits, inspections and certifications are to be delivered to the Department
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/fco/f2042/f2042-invitation-to-bid.pdf?sfvrsn=56966d63_119-10-Valido-D6DesignLessonsLearned
Existing Utilities Utility Permits ITS Infrastructure Lesson Learned # 6 • Subsurface Utility, Existing Utilities Utility Permits ITS Infrastructure 37 38 6/30/2025 20 Lesson Learned # 7
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2025-june/19-10-valido-d6designlessonslearned.pdf?sfvrsn=5063fb40_1schedule_dictionary - Copy
PLANS The preparation of PH I Plans consist of identifying all R/W needs, wetland permits (needed, submitted to R/W 145 PERMITS 146 TITLE SEARCH WORK 14201 - Submit Preliminary R/W, 187 NO R/W REQRD CERTIFICATION 22201 - ALL PERMITS CLEAR 90402-Submit Final Plans 38001, CERTIFICATION 26601 - UTILITIES CERTIFIED 25501 - R/W CERTIFIED 22201 - ALL PERMITS CLEAR 19908 - Review, 404 (FEDERAL) PERMIT 27201 - SUBMIT PERMIT APPLICATIONS 22201 - ALL PERMITS CLEAR 38001
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/test2/d2test/schedule_dictionary---copy.htm?sfvrsn=2f6ef41e_1&download=trueSched 2 Test
PLANS The preparation of PH I Plans consist of identifying all R/W needs, wetland permits (needed, have been submitted to R/W 145 PERMITS 146 TITLE SEARCH WORK 14201 - Submit, CERTIFICATION 22201 - ALL PERMITS CLEAR 90402-Submit Final Plans 38001 - PRODUCTION READY A date, - UTILITIES CERTIFIED 25501 - R/W CERTIFIED 22201 - ALL PERMITS CLEAR 19908 - Review Trnsport Unit Prices, 22201 - ALL PERMITS CLEAR 38001 - PRODUCTION READY 218 USCG PERMIT PROCESSING USCG (FEDERAL
https://www.fdot.gov/test/sched-2-testFDOT_1050.2A Assurance_2025 Signed
with the land, in any future deeds, leases, licenses, permits, or similar instruments entered, will be included in deeds, licenses, leases, permits, or similar instruments entered, of said facilities. B. With respect to licenses, leases, permits, etc., in the event of breach of any, , permits, or similar instruments/ agreements entered into by ___________________ pursuant, , permits, etc.), in the event of breach of any of the above Non-discrimination covenants
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/equalopporunity/titlevi/fdot_1050-2a-assurance_2025-signed.pdf?sfvrsn=8ddb7f16_1Design Build 1-21
, State, and Local laws, bylaws, ordinances, rules, regulations, orders, permits, or decrees including environmental laws, rules, regulations, and permits. Highway, Street, or Road. A general term
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/design-build/design-build-1-21.docx?sfvrsn=c32e042f_6Design Build Boilerplate
, State, and Local laws, bylaws, ordinances, rules, regulations, orders, permits, or decrees including environmental laws, rules, regulations, and permits. Highway, Street, or Road. A general term
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/design-build/db-boilerplate-7-20.docx?sfvrsn=3bca4656_2Pt1Ch6_073124_clean
......................................................................... 6-3 6.2.1.4.1 Anticipated Permits, be discussed. 6.2.1.4.1 Anticipated Permits The Environmental Analysis section should include a subsection on anticipated permits identified during the PD&E Study. This list should include the name, , Environmental Permits for more information on documenting permits in the EA. 6.2.1.5 C omments, Bicycles and Pedestrians 2 3 Navigation 1 16 Anticipated Permits 1 12 Topic No. 650-000-001 Project
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/pdeman/2024/pt1ch6_073124_clean.pdf?sfvrsn=cc1f80c4_10070101.origind
All Jobs TheContractor shall comply with all environmental permits, including measures identified, conditions are necessary, these measures and conditions will be addressed in the Plans or in permits, or permits are necessary, coordinate with the appropriate resource agencies for clearance, obtain permits and perform mitigation measures as necessary. Immediately notify the Engineer in writing, District, or the United States Department of Agriculture (USDA) office for the proper permits
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/internal/0070101.origind.pdf?sfvrsn=61ab4bae_0DesignBuildSpecificationsjan05
but not limited to any or all utilities, subsoil conditions, permits, etc. of any nature or kind, unless
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2005/january-2005/design-build/designbuildspecificationsjan05.pdf?sfvrsn=9d0e17de_0DesignBuildSpecificationsjul05
or all utilities, subsoil conditions, permits, etc. of any nature or kind, unless otherwise stated
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2005/july-2005/design-build/designbuildspecificationsjul05.pdf?sfvrsn=2c955363_0DesignBuildSpecifications.JulDec
conditions, permits, etc. of any nature or kind, unless otherwise stated in the Contract. In the event
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2006/july-2006/design-build/designbuildspecifications.juldec.pdf?sfvrsn=8d6ff7e1_0