4650 search results for pavement design

6110203.FHWA

copy reproductions, such as PDF files or as a separate level/layer within project design files, text to ensure legibility. Signing and pavement marking plan sheets may be used instead, and the approximate detection area for detection systems that are not embedded in or under pavement, location of all signal heads with respect to the pavement markings on the as-built plans. Each, plans is preferred, such as PDF files or as a separate level/layer within project design files

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/fhwa/6110203.fhwa.pdf?sfvrsn=d96b96e0_0

PublicHearing_SUMTER COUNTY_Summary

525E Type of Work: ADD LANES & RECONSTRUCT Phase Funding Source 2026 2027 2028 2029 2030 Design, for Project 438562-2 $24,228,173 445295-1 - SR 471 FROM CR 478A TO SR 35/US 301 Type of Work: PAVEMENT, Phase Funding Source 2026 2027 2028 2029 2030 Design Build Federal $24,842,035 Total for Project 448377-1 $24,842,035 450635-1 - SR48/SR475 FROM BELT AVENUE TO NOBLE AVENUE Type of Work: PAVEMENT, OF SR-471/TARRYTOWN RD Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2026 2027 2028 2029

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_sumter-county_summary911e678a-cf59-400c-a881-8217ab3aa689.pdf?sfvrsn=fa2b2ef8_2

Design Standards eBook FY2012-2013

Design Standards eBook FY2012-2013, Design Standards FY2012-2013 Design Standards eBook Index Title Revision Design Information Index No Total Sheets Instructions for Design Stds (IDS) Data Table Cell Library Borderless DGNs (PDF) (PDF) (ZIP) (ZIP) Terms of Use Complete eBook (263mb) 934 Fiscal Year 2012/2013 Design Standards eBook Effective, Pavement and Sodding 282 3 Back of Sidewalk Drainage 283 1 Median Opening Flume

https://www.fdot.gov/roadway/ds/12/stds.shtm

Design Standards eBook 2014

Design Standards eBook 2014, Design Standards 2014 Index Number Design Standards Revision (DSR) Index Title Design Information Instructions for Design Stds (IDS, eBook (264mb) 2014 Design Standards eBook Effective Jan 1 - December 31 Combined Available, Miscellaneous Drainage Details 281 Ditch Pavement and Sodding 282 Back of Sidewalk Drainage, Drain 286 Underdrain 287 Concrete Pavement Subdrainage 288 Deep Well Injection

https://www.fdot.gov/roadway/ds/14/stds.shtm

Design Standards eBook 2015

Design Standards eBook 2015, Design Standards 2015 Index Number Design Standards Revision (DSR) Index Title Design Information Instructions for Design Stds (IDS, eBook (252mb) 2015 Design Standards eBook Effective Jan 1 - December 31 Combined Available, Ditch Pavement and Sodding 282 Back of Sidewalk Drainage 283 Median Opening Flume, 287 Concrete Pavement Subdrainage 288 Deep Well Injection Box 289 Concrete Box

https://www.fdot.gov/roadway/ds/15/stds.shtm

441700-1.Cove Rd from SR-76_Kanner Hwy to SR-5_US-1 GeoReport

7.5 Pavement Design Considerations, groundwater impacts on construction procedures. 7.5 Pavement Design Considerations We anticipate, Geotechnical (i.e., soils and groundwater) input to the design team to assist in the evaluation, Description AASHTO Classification FDOT Soil Designation 1 Topsoil A-8 Unsuitable 2 Asphalt - - 3, classification in accordance with Section 1.3 of FDOT Structures Design Guidelines. Tests were performed

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cove-road-study/441700-1-cove-rd-from-sr-76_kanner-hwy-to-sr-5_us-1-georeport.pdf?sfvrsn=42e3d65b_1

9850000.origind

in response to industry requests to move geosynthetics from the Design Standards Indexes to the APLQPL, , Construction, Product Evaluation Are changes needed to the PPM, Design Standards, SDG, CPAM or other manual? Yes. Design Standards Index 199 & 501 will be deleted, References to Index 199 & 501, )? Is a Design Bulletin, Construction Memo, or Estimates Bulletin needed? No. Contact the State, change. This change was proposed by Larry Jones of the State Structures Design Office to update

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/internal/9850000.origind.pdf?sfvrsn=c783c33d_0

FDOT_MPOGuidebook_20181005

capacity, VMT (vehicle miles travelled), land-use, roadway design, future investment demands, of likely ACES impacts to employment, land use, facility design, capacity, a u t o o w n e r s h i, in their LRTPs. However, no uniform policy or design guidance previously existed to help MPOs anticipate, plan, is partnering with Uber and Lyft on an experimental program to designate TNC pick-up and loading zones

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/policy/metrosupport/resources/fdot_mpoguidebook_20181005_4721ea94-0de9-4184-8f1c-dac90e824e18.pdf?sfvrsn=7d194ed6_2

6300300-724FHWA

backfilling trenches in existing pavement, use a flowable fill meeting the requirements of Section 121, that is designed for this specific application. 630-3.1.1 Fiber Optic Cable Conduit: Install, in existing pavement, use a flowable fill meeting the requirements of Section 121. Provide a standard, the ends of conduit after wiring is complete with a moisture resistant sealant that is designed

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/fhwa/6300300-724fhwa.pdf?sfvrsn=22320645_2

D4-01-05-24BSN

OF INTEREST A contractor who performs a constructability review on a design contract or who, PAVEMENT MARKERS 45358017201(*) DIST/ST-WIDE 17 E4X23-R0 TREASURE COAST HERBICIDE - ROUTINE, , driveways, bus boarding pad), pavement markings (detectable, raised, painted, thermoplastic), pavers, patterned pavement, green bike lanes, signing (single-post, object marker, panel, internally, PAVEMENT, 2" AVG DEPTH SY 57,664.000 0327- 70- 6 MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH SY

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2024/jan05/d4-01-05-24bsn.pdf?sfvrsn=119106e0_2

1200503-724origind

FDOT Design Manual ConstructionProject Administration Manual Basis of Estimate/Pay Items Structures Design Guidelines Approved Product List Materials Manual Synopsis: Summarize the changes, .) Maintenance Specs Will this revision necessitate any of the following: Design Bulletin Construction (DCE, . The SMO or an AASHTO accredited laboratory designated by the SMO will perform the Resolution testing, pavement or base construction in order to provide support for the edges. Maintain all earthwork

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/internal/1200503-724origind.pdf?sfvrsn=30cb7f12_1

1-MPOAC-Staff-Directors-Power-Point-November-01-2018

Performance • Designed to Simplify and Support PM3 Reporting Requirements for FDOT and MPOs, Nov 14: MPO Sets Bridge, Pavement and System Perfo r m a n c e Ta rgets • Feb 27: MPO Sets Safe ty Ta rget • May 20, 2019: Any S/TIP Amendments After May 20th Address Bridge, Pavement, . Documenting Performance 5. Design Guidelines 6. Project Prioritization and Funding 7. Innovative

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2018/1-mpoac-staff-directors-power-point-november-01-2018.pdf?sfvrsn=94451b48_1

2-MPOAC-Governing-Board-Power-Point-November-01-2018

Ta rgets • Help Determine Performance • Designed to Simplify and Support PM3 Reporting, /guidance/ On the Horizon • Nov 16 Nov 14: MPO Sets Bridge, Pavement and System Perfo r m a n c e Ta, Address Bridge, Pavement and System Performance Ta rgets For Additional Information • Cathy Kendall, Planning 4. Documenting Performance 5. Design Guidelines 6. Project Prioritization and Funding 7

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2018/2-mpoac-governing-board-power-point-november-01-2018.pdf?sfvrsn=98fa2d95_1

2025FDM916DrainStruct

 Topic #625-000-002 FDOT Design Manual 916 - Drainage Sheets 916 Drainage Sheets 916.1, is included for providing acceptable options for pipe materials and sizes that will satisfy the Design, the design intent of special, non- standard drainage features. The Drainage Sheets are produced as contract, , 2025 1 Topic #625-000-002 FDOT Design Manual 916 - Drainage Sheets 916.2 Drainage Network Plan, ticks. Include a north arrow and scale. (2) Display proposed limits of pavement, curbs, traffic

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm916drainstruct.pdf?sfvrsn=1761266d_3

2026FDM916DrainStruct

 Topic #625-000-002 FDOT Design Manual January 1, 2026 916 - Drainage Sheets 1 916 Drainage, the Design Service Life. The sheet format is available in the FDOT CADD Software. See Exhibit 916-4, shows the design intent of special, non- standard drainage features. The Drainage Sheets are produced, ’ Topic #625-000-002 FDOT Design Manual January 1, 2026 916 - Drainage Sheets 2 916.2 Drainage, to station ticks. Include a north arrow and scale. (2) Display proposed limits of pavement, curbs, traffic

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm916drainstruct.pdf?sfvrsn=e57cdf3b_8

BDV31-977-141-UF_Final_AOI_Tool

data sources; and (3) pilot test the tool with user groups. The design of the Resilience Report, on designing a framework for storing, analyzing, and displaying results with the flexibility, planning, design, and construction process. The goal of this project was to build a tool to mainstream, for the impacts of climate change. Specifically, the project had three objectives: 1. Design, . Hence, the research team focused on designing and developing a framework for storing, analyzing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/policy/resilience/bdv31-977-141-uf_final_aoi_tool.pdf?sfvrsn=7bb27a25_1

9910000-722origind

Index Traffic Engineering Manual FDOT Design Manual Construction Project Administration Manual Basis of Estimate/Pay Items Structures Design Guidelines Approved Product List Materials Manual Will this revision necessitate any of the following: Design Bulletin Construction Bulletin Estimates, the pavement surface shall be 36 inches. 991-1.3 Color: Tubular Marker color must be uniform, . Impact tests shall be performed only on tubular markers measuring 36 inches above the pavement surface

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/9910000-722origind.pdf?sfvrsn=13b8c83b_2

9910100-723origind

FDOT Design Manual Construction Project Administration Manual Basis of Estimate/Pay Items Structures Design Guidelines Approved Product List Materials Manual Synopsis: Summarize the changes, .) Maintenance Specs Will this revision necessitate any of the following: Design Bulletin Construction Bulletin, diameter, width, or length of 8 inches. The height of the tubular marker above the pavement surface shall, on tubular markers measuring 36 inches above the pavement surface. Products listed on the IPL for Managed

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/internal/9910100-723origind.pdf?sfvrsn=9335a67d_1

ACEC-FL Liaison Meeting Minutes 2024-09-10

District Design Engineer Judy Solaun-Gonzalez Florida Department of Transportation District Consultant, program, IIJA/Stimulus projects, Moving Florida Forward. a. The pavement quality in District 6, to the high pavement quality, District 6’s lane mile targets have been lowered in comparison, is addressing this statewide through QA/QC Task Force: a. PD&E & Design i) Metrics on quality, PD&E team is working closely with Design to align on criteria and options presented to avoid

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd6/acec-fl-meeting-minutes/acec-fl-liaison-meeting-minutes-2024-09-10.pdf?sfvrsn=2352b9bf_1

Richard_Nasrawy_CV_2025

contract payments. Supported QA/QC efforts and assisted with design-phase reviews and change order, . Served as liaison between field staff, design teams, and departmental leadership for efficient, ) featuring bridge construction, pavement widening, drainage improvements, lighting, ITS, , coordinated contractor activities, and ensured adherence to FDOT design- build standards. I-95 at St, 5 | Contract Amount: $27.8M Award: FTBA 2020 Best in Construction – Design-Build Description

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/constadm/drb/resume/richard_nasrawy_cv_2025.pdf?sfvrsn=f43c28aa_1
20 of 4650 results