707 search results for bridge maintenance
D5-08-04-26BSN
AND MAINTENANCE PROGRAMS Procurement Services, MS 4-524 719 S. Woodland Blvd, DeLand, FL 32720 Deland, $250,000.00 as established by the Department’s budget. Maintenance contracts do not require, and specifications. If deemed necessary by the Department, certain maintenance contracts will contain specific requirements for maintenance contractor eligibility. Bid Solicitation Notice Page 2, consideration in accordance with Article 3-1 of the Standard Specifications for Road and Bridge
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2026/aug04/d5-08-04-26bsn.pdf?sfvrsn=a864f0bf_11050404MM92V2int
volume limits are exceeded. These updates are proposed for pavement and bridge mixtures, No Approved Product List No Construction Office No Maintenance Office No Materials Manual No Traffic, of pavement and bridge decks mixes Does the change shift risk and to who? N/A Provide summary
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2027-28/review/industry/1050404mm92v2int.pdf?sfvrsn=d871b5e4_1Historical Item Averages Market Area 01
$415.70 $3,398,728.07 8,176.000 DA N MAINTENANCE OF TRAFFIC 0102 2200 6 $28.53 $2,448,645.72, DETOUR- TEMPORARY BRIDGE 0102 3 5 $57.08 $58,317.12 1,021.600 CY N COMMERCIAL MATERIAL FOR TEMPORARY DRIVEWAY MAINTENANCE 0102 4 1 2 $59.63 $152,300.00 2,554.000 SY N PEDESTRIAN OR BICYCLE SPECIAL DETOUR, SIGNALIZATION AND MAINTENANCE, INTERSECTION 0102107 1 5 $11.05 $237,211.00 21,460.000 ED N TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION 0102112 1 $121.05 $181,575.00 1,500.000 DA N EXISTING ITS
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/market-area/pdf/historical-item-averages-market-area-01.pdf?sfvrsn=d3643e0d_14E4Y57 Scope of Services
3.22 Moveable Bridge Maintenance (Not Included) .............................................................. 40 3.23 Non-Moveable Bridge Maintenance (Not Included, Asset Maintenance contract that consists of: Maintenance of US-1 (SR 5), A1A, and select connecting, .............................................................. 26 3. ASSET MAINTENANCE PERFORMANCE MEASURES, ..................................................................................... 30 3.2 Maintenance Rating Program
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/asset-maintenance/e4y57/e4y57-scope-of-services.pdf?sfvrsn=6acab662_1RAM 2026 Redline to post
Standard Plans FDOT Standard Specifications for Road and Bridge Construction Procedure 350-020-305
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/finalest/review-and-admin/ramhistory/ram-2026-redline-to-post.pdf?sfvrsn=91959cab_1Staff Directory
Operations Vacant (850) - State Bridge Maintenance and Repair Engineer Structures Operations Beitelman, Maintenance Engineer Administrative Hutchison, Deanna (850) 410-5634 State Admin for Maintenance, Maintenance Information Manager Performance Management Fairchild, David (850) 410-5643 Maintenance, Tadlock, Kristin (850) 410-5694 Roadway Maintenance Engineer Roadway Operations Oliver, James (850, Agent Roadway Operations Wagner, David (850) 410-5690 State Structures Maintenance Engineer
https://www.fdot.gov/maintenance/staffdirectory.shtmE1W98
Days: 125 Total Bridge Length: 0.000 Miles Letting Date: 07/16/26 Total Proposal Length: 6.320, 1.000 0102- 1- MAINTENANCE OF TRAFFIC (45088315201) LS 1.000 0102- 14- TRAFFIC CONTROL OFFICER HR, 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 500.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 500.000 0102-909- TEMPORARY RAISED RUMBLE STRIPS
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2026/jul16/e1w98.pdf?sfvrsn=ae56549c_1E3Z24
Florida Department of Transportation Bid Solicitation Notice and Approximate Quantities Letting: 03260611 Call Order: 002 Proposal: E3Z24 District:03 Counties: GADSDEN Road Name: GADSDEN COUNTY REST AREAS EB/WB CAPITAL IMPROVEMENTS Limits: 50001000 Project(s): 44589825201(*) Federal Aid No: N/A Total Roadway Length: Contract Days: 360 Total Bridge Length: Letting Date: 06/11/26 Total, - MOBILIZATION (44589825201) LS 1.000 0102- 1- MAINTENANCE OF TRAFFIC (44589825201) LS 1.000 0102- 60- WORK
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2026/jun11/e3z24.pdf?sfvrsn=bbeaa8dd_1District 5 Statewide Maintenance Contacts
District 5 Statewide Maintenance Contacts, District 5 Statewide Maintenance Contacts, ) 943-5000 (Traffic Operations/Construction/Maintenance)FAX: (386) 943-5652 (Traffic Operations), (386) 943-5716 (Construction/Maintenance) DeLand District Office Contacts Name Title/Responsibilities Phone, Matthews Director Transportation Support (386) 943-5480 Ron Meade District Maintenance Engineer (386, Deputy District Maintenance Engineer (386) 943-5273 (386) 279-5504 Blake Baker Deputy District
https://www.fdot.gov/maintenance/statewide-contacts/district5mapcontacts.shtmE8W73
No: N/A Total Roadway Length: 0.510 Miles Contract Days: 331 Total Bridge Length: 0.000 Miles, 0102- 1- MAINTENANCE OF TRAFFIC (44622425201) LS 1.000 0102- 4- 1 PEDESTRIAN OR BICYCLE SPECIAL, MESSAGE SIGN, TEMPORARY ED 1,404.000 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 1,324.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 1,324.000 0102-112- EXISTING ITS MAINTENANCE DA 331.000 0102-115- TYPE III BARRICADE ED 210.000 0104- 10- 3
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2026/may12/e8w73.pdf?sfvrsn=5562ce5c_12024 Macroeconomic Evaluation Executive Summary
functions such as planning, operations, maintenance, and administration. This analysis considers long, the best available Florida models and data on traffic forecasts, pavement and bridge condition, congestion, and maintenance benefits, and other benefits from changes in travel and congestion relief. Economic
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/fto/macroeconomics/2024-macroeconomic-evaluation-executive-summary.pdf?sfvrsn=857b88d6_21050404MM92V2int
volume limits are exceeded. These updates are proposed for pavement and bridge mixtures, No Approved Product List No Construction Office No Maintenance Office No Materials Manual No Traffic, of pavement and bridge decks mixes Does the change shift risk and to who? N/A Provide summary
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2027-28/review/internal/1050404mm92v2intd807efcf-bccf-4614-bdef-517de1de4d96.pdf?sfvrsn=96b27488_1715-001IndReviewPkg
Buck Yes Maintenance Office No Implementation 9 / 2 9 / 2 0 2 5 8 : 1 8 : 4 0, to provide tension on the from the transformer base, pole base, or pullbox for maintenance. 2. Provide, and Bridge Mounted Poles: Place wiring system 1. NOTES: 7 / 2 1 / 2 0 2 6 4 : 2 9 : 3 3 P, to provide tension on the from the transformer base, pole base, or pullbox for maintenance. 2, and Bridge Mounted Poles: Place wiring system 1. NOTES:
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2028/715-001indreviewpkg.pdf?sfvrsn=f922206f_1District Structures Maintenance Engineers (DSME) Memorandums
District Structures Maintenance Engineers (DSME) Memorandums, Search District Structures Maintenance Engineers (DSME) Year-Number Title 25-02 Inspection of Department Owned Railroad Bridges 25-01 Inspection of Overhead Signs and Traffic Signal Mast Arms 24-01 Modifications to the Bridge and Other Structures Inspection and Reporting Procedure 22-01 Sonovoid Slab Guidelines Memo Helpful InfoSome documents within
https://www.fdot.gov/maintenance/dme/district-structures-maintenance-engineers-(dsme)-memorandumsE22D5-R0
AUGUSTINE MAINT CONTRACTS PRIMARY - ROUTINE MAINTENANCE Limits: Midpoint Project(s): 41021477282(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000, ASSEM (REPLACE) (BRIDGE) EA 1.000 E536- 6-414 END ANCHORAGE ASSEM (REPLACE) (TYPE SRT-350/8) EA, MAINTENANCE LF 294.000 E536- 21-501 END ANCHORAGE ASSEMBLY FLEAT SP, FURNISH & INSTALL, FIRST POST, END ANCHOR ASSEM BRIDGE (REPL SPECIAL END SHOE) EA 1.000 E536-308-501 END ANCHOR ASSEM SRT-350 (REPL
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2026/sep16/e22d5-r0.pdf?sfvrsn=6296ee01_1E22A0
: 225 Total Bridge Length: 0.000 Miles Letting Date: 05/27/26 Total Proposal Length: 0.000 Miles, Document Driven Contract consists of furnishing all labor, equipment, materials, maintenance
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2026/may27/e22a0.pdf?sfvrsn=fc59f985_1E21Z0BidTabs
BRIDGE DECK EXPANSION JOINT, REHABILITATION, POURED JOINT WITH BACKER ROD 732.000 LF 77.95000 57,059.40 69.00000 50,508.00 69.32000 50,742.24 0010 0458 2 POLYMER NOSING FOR BRIDGE DECK EXPANSION, 52,541.54000 52,541.54 0025 0102 1 MAINTENANCE OF TRAFFIC 20820335201 (200.000) DA (LS) 66,252.16000, Roadway SECTION: 0030 0102 1 MAINTENANCE OF TRAFFIC 42448235201 (200.000) DA (LS) 66,252.16000, , INC. Units ( ) indicates item is bid as Lump Sum 0001 Structures SECTION: 0005 0458 1 21 BRIDGE
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/bid-tabs/2026/sep16/e21z0bidtabs.pdf?sfvrsn=7c8c38bb_1E22D5-R0BidTabs
MAINT CONTRACTS PRIMARY - ROUTINE MAINTENANCE 41021477282 (*) N/A Page 1 of 1 09/24/2026 Florida, (*) Fed Aid No: ST AUGUSTINE MAINT CONTRACTS PRIMARY - ROUTINE MAINTENANCE N/A Contract Descr, 0.01 0.01000 0.01 1.00000 1.00 0070 E536 6 46 END ANCHORAGE ASSEM (REPLACE) (BRIDGE) 1.000 EA, 200.00000 1,000.00 250.00000 1,250.00 0130 E536 15 MISCELLANEOUS GUARDRAIL MAINTENANCE 294.000 LF, 0.01 0.01000 0.01 0.01000 0.01 0175 E536306501 END ANCHOR ASSEM BRIDGE (REPL SPECIAL END SHOE
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/bid-tabs/2026/sep16/e22d5-r0bidtabs.pdf?sfvrsn=20aaa6e5_1E52G8
Florida Department of Transportation Bid Solicitation Notice and Approximate Quantities Letting: 05261006 Call Order: 004 Proposal: E52G8 District:05 Counties: VOLUSIA Road Name: SR 46 FROM BREVARD CO LINE TO SEMINOLE COUNTY LINE - PAVEMENT ONLY RESURFACE (FLEX) Limits: 79140000 Project(s): 45264815201(*) Federal Aid No: N/A Total Roadway Length: Contract Days: 80 Total Bridge Length, - MAINTENANCE OF TRAFFIC (45264815201) LS 1.000 0102- 60- WORK ZONE SIGN ED 2,400.000 0102- 74- 1
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2026/oct06/e52g8.pdf?sfvrsn=33b71fe1_1E52G7
Florida Department of Transportation Bid Solicitation Notice and Approximate Quantities Letting: 05261006 Call Order: 003 Proposal: E52G7 District:05 Counties: SUMTER Road Name: SR 471 Limits: 18110000 Project(s): 45263315201(*) Federal Aid No: N/A Total Roadway Length: Contract Days: 160 Total Bridge Length: Letting Date: 10/06/26 Total Proposal Length: 2.4 0 7 Miles 0.0 40, - MOBILIZATION (45263315201) LS 1.000 0102- 1- MAINTENANCE OF TRAFFIC (45263315201) LS 1.000 0102- 14- TRAFFIC
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2026/oct06/e52g7.pdf?sfvrsn=c293a8aa_1