9191 search results for test

6600000.FHWA

as tested for viscosity using ASTM D562 at 77°F. Ensure loop sealant is tack free within a maximum of 2 hours from time of application and when cured as tested for tack free time using ASTM C679, by 3 inch saw cut, cured for 2 weeks at 77°F as tested for adhesion using visual inspection. Ensure, saw cut, cured for 2 weeks at 77°F as tested for shrinkage using a dimensional measurement. Ensure loop sealant resists weather, oils, gasoline, antifreeze, and brake fluid as tested

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul13/files/6600000.fhwa.pdf?sfvrsn=d4f9bbf2_0

9940000.impl

test reports from an independent laboratory showing the product meets the requirements, : Sheeting, process inks and film overlay materials shall be tested in accordance with, and meet all, be tested in accordance with, and meet the performance requirements of ASTM D-4956 Type VIII, except, in the QPL application must be tested and meet the requirements identified in ASTM D-4956, sheeting in accordance with Section 994-4 for testing. Fungal resistance testing is required

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul10/files/9940000.impl.pdf?sfvrsn=4f7a3d7a_0

453000fhwa

to testing. For slow-set epoxy, an additional test specimen shall be made and tested to failure, if a slant cylinder test specimen, prepared and tested in accordance with the conditions below, sustains, strength of at least 4,500 psi [31 MPa] at 28 days when tested to ASTM C39. The slant-cylinder test, -set epoxy, an additional test specimen shall be made and tested to failure at 24 hours, ) will be deemed acceptable if a slant cylinder test specimen, prepared and tested in accordance

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul03/files/453000fhwa.pdf?sfvrsn=694bb040_0

D3 WP 2025 HPH FAR Ad Confirmation

of the proceeding is made, which record includes the testimony and evidence from which the appeal, that a verbatim record of the proceeding is made, which record includes the testimony and evidence from

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d3_documents/d3-wp-2025-hph-far-ad.pdf?sfvrsn=17189481_4

1050101.impl

technicians performing sampling, testing and inspection for both field and laboratory tests. Submit, Test Results: Submit certifications prior to placement of materials. Report test results at completion of the test and meet the requirements of the applicable Specifications. ARTICLE 105-2, Guide Schedule in the same format as the current Sampling, Testing, and Reporting Guide 21, activities that require testing until the Job Guide Schedule has been reviewed and accepted

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/implemented/1050101.impl.pdf?sfvrsn=b359373_0

6490200.impl

28-day concrete strength and verifying test results have been provided to the Engineer. Determine concrete strength from tests on a minimum of two test cylinders prepared and tested in accordance

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul13/files/6490200.impl.pdf?sfvrsn=4bbec5b1_0

6490500.impl

and verifying test results have been provided to the Engineer. Determine concrete strength from tests on a minimum of two test cylinders prepared and tested in accordance with ASTM C 31 and ASTM C 39

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul09/files/6490500.impl.pdf?sfvrsn=87de5c75_0

9460100-724origind

Test Report for all culvert pipe stating that the inspection and all of the specified tests have been, the Engineer with a Mill Test Report for all soil pipe stating that samples representing each lot have been tested and inspected as indicated in this specification and the requirements have been met

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/internal/9460100-724origind.pdf?sfvrsn=3ccf5294_2

6490401.impl

achieved 70% of the specified 28-day concrete strength and verifying test results have been submitted to the Engineer. Determine concrete strength from tests on a minimum of two test cylinders prepared and tested in accordance with ASTM C31 and ASTM C39. Before erecting the pole, clean the top

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/implemented/6490401.impl.pdf?sfvrsn=2b2f169_0

19-14-Ayithi-FoundationEngineeringInnovations

(REC) and poor rock quality designation (RQD) are common leading to insufficient test samples (data, Penetration Test (SPT) and/or Cone Penetration Test (CPT) data • SPT is typically performed 2.5 feet, been used to assess specific energy on planned instrumented load- tested piles • The correlation, using existing database of full-scale static load tests and analysis using all LRFD methods, was MWD monitored and validated during installation • 5% of piles were proof tested using Drop

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2025-june/19-14-ayithi-foundationengineeringinnovations.pdf?sfvrsn=249355cf_1

D4SR5NoiseOrdinance

of the pond excavation. 5. The soil in the pond was subsequently sampled and tested. The test reports, . There is no indication that County code enforcement personnel visited the site. However, there was testimony, 23 West. 2. After excavation had begun, testing of samples take from the pond indicated

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/constadm/drb/decision/d4/2007/d4sr5noiseordinance.pdf?sfvrsn=e7ba10fd_0

44787815201-Geotech Report_Mast Arms

Hendry County, Florida Page 2 jars for further classification and laboratory testing. Test Location, to Medium Fine SILT CLAY SOIL BORING, SAMPLING AND TESTING METHODS STANDARD PENETRATION TEST The Standard Penetration Test (SPT) is a widely accepted method of in-situ testing of foundation soils (ASTM, ) The tests are usually performed at 5 ft (1.5 m) intervals. However, more frequent or continuous testing, or jars and returned to the laboratory for classification and testing, if necessary. LABORATORY TEST

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26111/44787815201-geotech-report_mast-arms.pdf?sfvrsn=6aa9b575_1

44787815201-Geotech Report_Mast Arms

Hendry County, Florida Page 2 jars for further classification and laboratory testing. Test Location, to Medium Fine SILT CLAY SOIL BORING, SAMPLING AND TESTING METHODS STANDARD PENETRATION TEST The Standard Penetration Test (SPT) is a widely accepted method of in-situ testing of foundation soils (ASTM, ) The tests are usually performed at 5 ft (1.5 m) intervals. However, more frequent or continuous testing, or jars and returned to the laboratory for classification and testing, if necessary. LABORATORY TEST

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26111/44787815201-geotech-report_mast-arms819fd6b5-f1c7-4d35-90b0-0b8fa4821dfe.pdf?sfvrsn=2d79167a_1

9260100.origind

systems. *Accepted by APL **Accepted by certified test report ***Accepted by certification SUBARTICLE, and tType PSE epoxiesof their products shall submit product data sheets, performance test reports, test data from an independent laboratory showing that the product meets the requirements, Performance Tests: Meet the requirements of ASTM C881 Type IV, Grade 3. 1. Epoxy Bonding Compounds: Epoxy Bonding Compounds shall be prepared and tested in accordance with FM 3-C882. The ratio

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/internal/9260100.origind.pdf?sfvrsn=2a72e7a9_0

3470000.FHWA

of QualitySampling and Testing. 347-4.1 Concrete Mix Design: Before producing any concrete, submit the proposed mix design with compressive strength test results, tested in accordance with ASTM C39, Sampling and Testing: The Engineer may sample and test the concrete at their discretion to verify, Sampling and Testing. The Engineer may sample and test the concrete at their discretion to verify its, , when unsatisfactory test results are obtained from the use of the substituted material(s). 347-2.4

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/fhwa/3470000.fhwa.pdf?sfvrsn=8f58004_0

SS3470000

information may be used. Also submit three compressive strength test results tested in accordance with ASTM C 39 demonstrating the mix meets the minimum 28 day compressive strength requirement. The test, requirements. 347-4.2 Sampling and Testing: The Engineer may sample and test the concrete, and proportions, when unsatisfactory test results are obtained from the use of the substituted material(s, placements expected to exceed three hours, perform an additional moisture test approximately half

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2013/files/ss3470000.pdf?sfvrsn=e0f0ad16_0

SS3470000

information may be used. Also submit three compressive strength test results tested in accordance with ASTM C 39 demonstrating the mix meets the minimum 28 day compressive strength requirement. The test, requirements. 347-4.2 Sampling and Testing: The Engineer may sample and test the concrete, and proportions, when unsatisfactory test results are obtained from the use of the substituted material(s, placements expected to exceed three hours, perform an additional moisture test approximately half

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan13/files/ss3470000.pdf?sfvrsn=7ed0e92e_4

D3300000

in the Contract bid prices for the asphalt items. 330-12.3.2 Test Method: Perform acceptance testing, testing at other locations within the lane being tested. 330-12.3.3 Acceptance Criteria for Last Layer, . ControlCharts:Plot and keep charts updated daily for all Quality Control Sampling and Testing, will be increased until the proper conditions have been restored. 330-2.2 Minimum Process Control Testing Requirements: Include as a minimum, the following testing frequencies in the Quality Control Plan: Asphalt

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2002/files/d33000001d41c6be9c6d41e48149d94fd65f2cea.pdf?sfvrsn=b3714864_0

D3300000

in the Contract bid prices for the asphalt items. 330-12.3.2 Test Method: Perform acceptance testing, testing at other locations within the lane being tested. 330-12.3.3 Acceptance Criteria for Last Layer, . ControlCharts:Plot and keep charts updated daily for all Quality Control Sampling and Testing, will be increased until the proper conditions have been restored. 330-2.2 Minimum Process Control Testing Requirements: Include as a minimum, the following testing frequencies in the Quality Control Plan: Asphalt

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2002/files/d3300000.pdf?sfvrsn=c7ea1847_0

Chapter5s8Redline

will ensure that Resolution sampling and testing is performed, that the Resolution samples and test, and Certification system (MAC), indicates who samples and tests each of these materials and at what frequency, methods of material acceptance: 1) certification; 2) visual inspection; and 3) sampling and testing, submitted for testing. (a) Product Certification Certification per product, per project is required, on Department lists when documentation (certification and periodic test results) is received

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newhistory/chapter5s8redline.pdf?sfvrsn=b76cc5c0_9
20 of 9191 results