666 search results for item average unit cost

7-11DBBoilerplate-6-20-11

item number being changed and the respective unit price change. The correct revised total per item, on the State Construction Website. Controlling Work Items. The activity or work item on the critical path having the least amount of total float. The controlling item of work will also be referred, , which extends the Contractor’s time of performance of any controlling work item under the Contract, Contingency Pay Item or a Contingency Supplemental Agreement. Working Day. Any calendar day on which

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/july-2011/design-build/7-11dbboilerplate-6-20-11.pdf?sfvrsn=374a086d_0

Chapter9

average unit prices for the standard pay items are provided in the publication Item Average Report, costs for pond sites in the cost estimates. Figure 9.1-1: Size and Location for Initial, that are similar, estimating construction cost differences rather than total construction costs may, and their different design features usually will result in different costs and impacts. As a result, amount of evaluation to show that the site selected results in the lowest total cost. The evaluation

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/drainage/files/drainagedesignguide/chapter9.pdf?sfvrsn=c244a11_7

1-11DBBoilerplate-2-7-11

bids, or irregularities of any kind; or if the unit prices are obviously unbalanced, or if the cost is in excess of or below the reasonable cost analysis values. WhentheDepartment provides, of total float. The controlling item of work will also be referred to as a Critical Activity. Culverts, controlling work item under the Contract. The term “delay” is intended to cover all such events, for this agreement are drawn against the Initial Contingency Pay Item or a Contingency Supplemental Agreement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/design-build/1-11dbboilerplate-2-7-11.pdf?sfvrsn=deab8fa8_0

1200000.FHWA-REVISED

. Adjustments to quantities or to Contract unit prices will be made according to work additions, excavation as separate items of payment, include such excavation under the item of regular excavation. If the proposal shows lateral ditch excavation as a separate item of payment, but does not show channel excavation as a separate item of payment, include such excavation under the item of lateral ditch excavation. Otherwise, include channel excavation under the item of regular excavation

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/fhwa/1200000.fhwa-revised.pdf?sfvrsn=6f8b56a5_0

2025 TDP Handbook - Final

as they offer more flexibility to the interview participants and are less time-consuming and costly, platforms are recommended due to lower cost and they tend to be more attractive for participants, will facilitate the sharing of data, information, and resources, thereby helping save staff labor and cost, descriptions, maps indicating areas to be served, a project timeline, associated costs, and the type

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/transit/transit-planning-resources/2025-tdp-handbook---final.pdf?sfvrsn=4742bca2_1

Governing-Board-Final-Packet-01-27-22

to mark.reichert@dot.state.fl.us. Item Number 1 Call to Order & Pledge of Allegiance DISCUSSION: The Chair will open, . REQUESTED ACTION: None requested. ATTACHMENT: None. Item Number 2 Remarks from Secretary Kevin Thibault, building, etc. REQUESTED ACTION: None requested. ATTACHMENT: None. Item Number 3 Approval, REPORT Item 4A, UPWP Report, was deferred to the MPOAC budget discussion under item 6B. • LEGISLATIVE, approval. Mr. Don Scott, MPOAC Staff Directors’ Advisory Committee Chair, presented this agenda item

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2022/governing-board-final-packet-01-27-22.pdf?sfvrsn=df5957ec_1

1-08DesignBuildBoilerplate

. The controlling item of work will also be referred to as a Critical Activity. Culverts, ,forceorfactor,whichextendstheContractor’stime of performance of any controlling work item under, or unauthorized alternate bids, or irregularities of any kind; or if the unit prices are obviously unbalanced, or if the cost is in excess of or below the reasonable cost analysis values, number being changed and the respective unit price change. The c o r r e c t r e v i s e d t o t a l p

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2008/january-2008/design-build/1-08designbuildboilerplate.pdf?sfvrsn=8ec9f9db_0

fdot-be725-rpt

REPORT | WJE No. 2019.0352.0 | MAY 20, 2022 Page 3 Figure 46. Average statewide costs for CP Systems, Figure 47. Average statewide costs for CP Systems with Zinc Aluminum Spray – Galvanic, . ....................................................................... 103 Figure 48. Average statewide costs for CP, Figure 49. Average statewide costs for CP, Lauderdale, Florida 33301 10. Work Unit No. (TRAIS) 11. Contract or Grant No. BE725 12. Sponsoring

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-be725-rpt.pdf?sfvrsn=cd3f8bb3_11

4550501-122impl

through embankment/fill material down to the natural ground surface at no additional cost, under the item for piling, for both the original pile and replacement pile. Redriving of an extracted and undamaged pile will be paid for at 30% of the Contract unit price for piling. The Contractor, -bonded dowel splice. Include all costs associated with dynamically testing production piles with epoxy-bonded dowel splices under Pay Item No. 455-34. No payment will be made for dynamic load tests

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/implemented/4550501-122impl.pdf?sfvrsn=e3fb61d3_2

4550501-122origind

at no additional cost to the Department. When using low displacement steel piling such as structural, Work. If a replacement pile is required, compensation will be made under the item for piling, will be paid for at 30% of the Contract unit price for piling. The Contractor may substitute a longer pile, -bonded dowel splice. Include all costs associated with dynamically testing production piles with epoxy- bonded dowel splices under Pay Item No. 455-34. No payment will be made for dynamic load tests

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/internal/4550501-122origind.pdf?sfvrsn=f852bbef_2

7-10DesignBuildBoilerplate

. Theactivityorworkitemonthecriticalpathhavingtheleastamount of total float. The controlling item of work will also be referred to as a Critical Activity, work item under the Contract. The term “delay” is intended to cover all such events, actions, or unauthorized alternate bids, or irregularities of any kind; or if the unit prices are obviously unbalanced, or if the cost is in excess of or below the reasonable cost analysis values, number being changed and the respective unit price change. The c o r r e c t r e v i s e d t o t a l

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2010/july-2010/design-build/7-10designbuildboilerplate.pdf?sfvrsn=dc2ec8fc_0

Redline eBook compressed

described in 2-2. Any pay item that will be provided free or at no cost to the Department shall, , or irregularities of any kind; or if the unit prices are obviously unbalanced, or if the cost is in excess, bid item number for which the price is being changed and the respective unit price change. c, of the permanent structure as part of a redesign or Cost Savings Initiative Proposal, or for repair, Website. Department-approved Specialty Engineers will not be authorized to perform redesigns or Cost

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/ebook/redline-ebook-compressed.pdf?sfvrsn=167b63fb_1

1-09DesignBuildBoilerplate

, or irregularities of any kind; or if the unit prices are obviously unbalanced, or if the cost is in excess of or below the reasonable cost analysis values. WhentheDepartment provides for alternate bids, . Theactivityorworkitemonthecriticalpathhavingtheleastamount of total float. The controlling item of work will also be referred to as a Critical, of any controlling work item under the Contract. The term “delay” is intended to cover all such events, r e c t P r o p o s a l I D . Thecorrectbiditem number being changed and the respective unit price

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2009/january-2009/design-build/1-09designbuildboilerplate.pdf?sfvrsn=bd81f631_0

7-08DesignBuildBoilerplate

, or irregularities of any kind; or if the unit prices are obviously unbalanced, or if the cost is in excess of or below the reasonable cost analysis values. WhentheDepartment provides for alternate bids, . Theactivityorworkitemonthecriticalpathhavingtheleastamount of total float. The controlling item of work will also be referred to as a Critical, of any controlling work item under the Contract. The term “delay” is intended to cover all such events, r e c t P r o p o s a l I D . Thecorrectbiditem number being changed and the respective unit price

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2008/july-2008/design-build/7-08designbuildboilerplate.pdf?sfvrsn=6cfaad75_0

7-09DesignBuildBoilerplate

. Theactivityorworkitemonthecriticalpathhavingtheleastamount of total float. The controlling item of work will also be referred to as a Critical, of any controlling work item under the Contract. The term “delay” is intended to cover all such events, or unauthorized alternate bids, or irregularities of any kind; or if the unit prices are obviously unbalanced, or if the cost is in excess of or below the reasonable cost analysis values, number being changed and the respective unit price change. The c o r r e c t r e v i s e d t o t a l p

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2009/july-2009/design-build/7-09designbuildboilerplate.pdf?sfvrsn=ebc50ea4_0

2000Book

of any controlling work item under the Contract. The term Αdelay≅ is intended to cover all, by the Contractor. Laboratory. The official testing laboratory used by the Department. Major Item of Work. Any item of work having an original Contract value in excess of 5% of the original Contract amount, . Proposal Form. The official form or the CEB program generated bid item sheets on which the Department, , and proposal form. The CEB program produces a bid item sheet containing items identical to those

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2000/ebook/2000book.pdf?sfvrsn=c74aa82d_0

7-07DesignBuildBoilerplate

. The controlling item of work will also be referred to as a Critical Activity. Culverts, ,forceorfactor,whichextendstheContractor’stime of performance of any controlling work item under, alternate bids, or irregularities of any kind; or if the unit prices are obviously unbalanced, or if the cost is in excess of or below the reasonable cost analysis values. WhentheDepartment, changed and the respective unit price change. The c o r r e c t r e v i s e d t o t a l p e r i t e m

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2007/july-2007/design-build/7-07designbuildboilerplate.pdf?sfvrsn=56a003de_0

PMG PDF V12

to determine how well the proposed costs represent what the contract should cost, assuming reasonable, of the FDOT. It is the role of the PM to meet the contract objectives. Cost: Keeping cost within the budget is a primary responsibility of the PM. It is important to ensure that the invoiced costs, schedule.  Stay within the budget.  Be concerned about total costs including design, right of way, and cost-effectively, and ensure compliance with all laws, rules, policies, and procedures related

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/designsupport/pmresources/pmg-pdf-v12.pdf?sfvrsn=3714fda7_1

PMG PDF V13

to determine how well the proposed costs represent what the contract should cost, assuming reasonable, of the FDOT. It is the role of the PM to meet the contract objectives. Cost: Keeping cost within the budget is a primary responsibility of the PM. It is important to ensure that the invoiced costs, schedule.  Stay within the budget.  Be concerned about total costs including design, right of way, and cost-effectively, and ensure compliance with all laws, rules, policies, and procedures related

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/designsupport/pmresources/pmg-pdf-v13.pdf?sfvrsn=b366d24f_1

PMG PDF V13

to determine how well the proposed costs represent what the contract should cost, assuming reasonable, of the FDOT. It is the role of the PM to meet the contract objectives. Cost: Keeping cost within the budget is a primary responsibility of the PM. It is important to ensure that the invoiced costs, schedule.  Stay within the budget.  Be concerned about total costs including design, right of way, and cost-effectively, and ensure compliance with all laws, rules, policies, and procedures related

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/designsupport/pmresources/pmg-pdf-v13c1ce6837-74ab-4893-be97-4a2888e2a96a.pdf?sfvrsn=5179e289_1
20 of 666 results