1272 search results for temporary steel bridge

1020900-723FHWA

of Section 521 unless noted otherwise in the Standard Plans. Proprietary temporary concrete, steel, performance requirements for temporary traffic detection and to include requirements for Contractor, and the following substituted: 102-9 Temporary Traffic Control Devices. 102-9.1 General: Use only devices, by the Engineer, any existing or temporary devices that do not apply to current conditions. The use, installation of temporary traffic control devices. Assign an employee the responsibility of maintaining

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/fhwa/1020900-723fhwa.pdf?sfvrsn=1ab97097_1

D005011e.do

be placed in advance of bridges with steel decks. (Sheet 2 of 2), ‘GENERAL NOTES’, Note 3, Line 3, text, , Slippery when wet signs shall be placed in advance of all movable and non-movable steel deck bridges, along each side to prevent rotation can be used with standard steel guardrail posts”. Index No. 400, 20 of 32), ‘GUARDRAIL POSTS’, ‘SPECIAL STEEL GUARDRAIL POSTS’, ‘FOR MOUNTING GUARDRAIL ON EXISTING APPROACH SLABS AND BRIDGE SIDEWALKS’, ‘TOP VIEW’ – Additional 1” Ø holes to be located front, back

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2003/january-2003/workbook/d005011e.do.pdf?sfvrsn=91157942_0

E8U30

Structures 0110- 3- REMOVAL OF EXISTING STRUCTURES/BRIDGES (43366315201 BRIDGE ID 750962) LS 1.000 0110- 3- REMOVAL OF EXISTING STRUCTURES/BRIDGES (43366315201 BRIDGE ID 750963) LS 1.000 0400- 2- 4, LB 83,753.000 0415- 1- 4 REINFORCING STEEL - BRIDGE SUPERSTRUCTURE LB 477,166.000 0415- 1- 5 REINFORCING STEEL- BRIDGE SUBSTRUCTURE LB 169,931.000 Page 2 Bid Solicitation Notice - Proposal Item, /A Total Roadway Length: 16.107 Miles Contract Days: 1143 Total Bridge Length: 0.092 Miles Letting Date

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/mar12/e8u30.pdf?sfvrsn=ebf44284_1

Standard Plans - FY 2019-20

Construction Operations  Maintenance of Traffic 102-200  Temporary Detour Bridge General Notes and Details 21600 SPI  102-210  Temporary Detour Bridge - Timber Pile Foundations 21610  102-220  Temporary Detour Bridge - Steel H Pile Foundations 21620  102-230  Temporary Detour Bridge - Steel Pile Pipe Foundations 21630  102-240  Temporary Detour Bridge Thrie - Beam Guardrail

https://www.fdot.gov/design/standardplans/2020/default.shtm

Standard Plans - FY 2020-21

Temporary Detour Bridge General Notes and Details 21600 SPI 102-210 Temporary Detour Bridge - Timber Pile Foundations 21610 102-220 Temporary Detour Bridge - Steel H Pile Foundations 21620 102-230 Temporary Detour Bridge - Steel Pile Pipe Foundations 21630 102-240 Temporary Detour Bridge Thrie - Beam Guardrail, Railing Details 822 SPI 515-051 Bridge Pedestrian/Bicycle Railing (Steel

https://www.fdot.gov/design/standardplans/2021/default.shtm

Standard Plans - FY 2024-25

of Traffic 102-200 Temporary Acrow 300 Series Detour Bridge General Notes and Details 21600 SPI 102-201 Temporary Acrow 700XS Series Detour Bridge General Notes and Details NEW SPI 102-210 Temporary Detour Bridge - Timber Pile Foundations 21610 SPI 102-220 Temporary Detour Bridge - Steel H Pile Foundations 21620 102-230 Temporary Detour Bridge - Steel Pile Pipe Foundations 21630 102-240 Temporary

https://www.fdot.gov/design/standardplans/2025/standard-plans---fy-2024-25

Standard Plans - FY 2025-26

102-200 Temporary Acrow 300 Series Detour Bridge General Notes and Details 21600 SPI 102-201 Temporary Acrow 700XS Series Detour Bridge General Notes and Details NEW SPI 102-210 Temporary Detour Bridge - Timber Pile Foundations 21610 SPI 102-220 Temporary Detour Bridge - Steel H Pile Foundations 21620 102-230 Temporary Detour Bridge - Steel Pile Pipe Foundations 21630 102-240 Temporary Detour Bridge

https://www.fdot.gov/design/standardplans/current/26

0050000.FHWA

Temporary Works, the AASHTO Construction Handbook for Bridge Temporary Works, and Chapter 11, not included in the SDG or LRFD, refer to the AASHTO Guide Design Specifications for Bridge Temporary Works and the AASHTO Construction Handbook for Bridge Temporary Works. For C o n s t r u c t i o n A f f e, for Shop Drawings for Bridges: 5-1.4.7.1ShopDrawings for Structural Steel and Miscellaneous Metals, permanent and temporary works as appropriate to the project. (b)Permanent Works: All the permanent

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/fhwa/0050000.fhwa.pdf?sfvrsn=c1a7fa85_0

E20W2BidTabs

Bridge No. 740089) The Improvements under this Contract consist of milling and resurfacing, bridges, 2.40000 83,222.40 0045 0415 1 4 REINFORCING STEEL - BRIDGE SUPERSTRUCTURE 1,198.000 LB 10.00000, : 0045 0415 1 4 REINFORCING STEEL - BRIDGE SUPERSTRUCTURE 1,198.000 LB 6.00000 7,188.00 20.00000, -Winning Bid 4 SOUTHERN ROAD & BRIDGE, LLC $7,572,042.28 127.38% Responsive Non-Winning Bid 5, (SR9) NB/ST MARYS RIVER BRIDGE NO. 740089 21346325201 (*) N/A Page 1 of 1 08/24/2023 Florida

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/bid-tabs/2023/aug16/e20w2bidtabs.pdf?sfvrsn=a902db0b_1

1020900-723impl

unless noted otherwise in the Standard Plans. Proprietary temporary concrete, steel, or water filled, is deleted and the following substituted: 102-9 Temporary Traffic Control Devices. 102-9.1 General: Use, approved by the Engineer, any existing or temporary devices that do not apply to current conditions, for the proposed installation of temporary traffic control devices. Assign an employee the responsibility of maintaining the position and condition of all temporary traffic control devices throughout

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/implemented/1020900-723impl.pdf?sfvrsn=112d67c6_2

Standard Plans - FY 2022-23

Temporary Acrow 300 Series Detour Bridge General Notes and Details 21600 SPI 102-201 Temporary Acrow 700XS Series Detour Bridge General Notes and Details NEW SPI 102-210 Temporary Detour Bridge - Timber Pile Foundations 21610 SPI 102-220 Temporary Detour Bridge - Steel H Pile Foundations 21620 102-230 Temporary Detour Bridge - Steel Pile Pipe Foundations 21630 102-240 Temporary Detour Bridge Thrie

https://www.fdot.gov/design/standardplans/2023/default.shtm

2024FDM110InitialEngineering

on projects that involve existing bridges as described below. 110.5.2.1 Projects Involving Steel Bridges For all projects that involve the repair, repainting or replacement of a steel bridge, the Design, on the National Steel Bridge Alliance (NSBA) website. (2) Standard concrete reinforcing steel sizes, . There are three basic types of projects: (1) New Construction - A highway or bridge project along a new, project along an existing facility to add lanes, widen or replace bridges, or improve intersections

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm110initialengineering.pdf?sfvrsn=dfae0cbc_1

2024FDM110InitialEngineering

bridges as described below. 110.5.2.1 Projects Involving Steel Bridges For all projects that involve the repair, repainting or replacement of a steel bridge, the Design Project Manager must contact, steel beams and shapes of standard grades as shown on the National Steel Bridge Alliance (NSBA, . There are three basic types of projects: (1) New Construction - A highway or bridge project along a new, project along an existing facility to add lanes, widen or replace bridges, or improve intersections

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm110initialengineering.pdf?sfvrsn=1a571bca_1

2025FDM110InitialEngineering

as described below. 110.5.2.1 Projects Involving Steel Bridges For all projects that involve the repair, repainting or replacement of a steel bridge, the Design Project Manager must contact the State, on the National Steel Bridge Alliance (NSBA) website. (2) Standard concrete reinforcing steel sizes, . There are three basic types of projects: (1) New Construction - A highway or bridge project along, - A highway project along an existing facility to add lanes, widen or replace bridges, or improve

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm110initialengineering.pdf?sfvrsn=64bc56dd_2

2025FDM110InitialEngineering

Involving Steel Bridges For all projects that involve the repair, repainting or replacement of a steel bridge, the Design Project Manager must contact the State Corrosion Engineer in the State, and shapes of standard grades as shown on the National Steel Bridge Alliance (NSBA) website. (2, . There are three basic types of projects: (1) New Construction - A highway or bridge project along, - A highway project along an existing facility to add lanes, widen or replace bridges, or improve

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm110initialengineering.pdf?sfvrsn=413345b4_2

2026FDM110InitialEngineering

that involve existing bridges as described below. 110.5.2.1 Projects Involving Steel Bridges For all projects that involve the repair, repainting or replacement of a steel bridge, the Design Project, ) Standard domestic steel beams and shapes of standard grades as shown on the National Steel Bridge, or bridge project along a new corridor on new horizontal and vertical alignments. (2) Add Lanes and Reconstruction - A highway project along an existing facility to add lanes, widen or replace bridges

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm110initialengineering.pdf?sfvrsn=8e44dc8_11

1020900-723origind

noted otherwise in the Standard Plans. Proprietary temporary concrete, steel, or water filled, : 102-9 Temporary Traffic Control Devices. 102-9.1 General: Use only devices that are listed, or temporary devices that do not apply to current conditions. The use of NCHRP Report 350, of commencing such operation to permit review of the plan for the proposed installation of temporary, and condition of all temporary traffic control devices throughout the duration of the Contract. Keep

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/internal/1020900-723origind.pdf?sfvrsn=5fcc291d_1

E6P16

, Bridge #900106, and over Bahia Honda Channel, Bridges 900016 & 900045 in Monroe County, SEALER OR METHACRYLATES SF 19,272.000 0415- 1- 5 REINFORCING STEEL- BRIDGE SUBSTRUCTURE LB 1,342.000, Letting: 06250227 Call Order: 002 Proposal: E6P16 District:06 Counties: MONROE Road Name: BRIDGE-REPAIR, /A Total Roadway Length: 2.017 Miles Contract Days: 1800 Total Bridge Length: 3.293 Miles Letting Date, advertisement Description: The improvements under this Contract consist of Bridge Repair/Rehabilitation

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/lettings/2025/feb27/e6p16.pdf?sfvrsn=3926e8d_1

RTOC

Construction Operations 353-001 Concrete Slab Replacement Maintenance of Traffic 370-001 Bridge Approach Expansion Joint - Concrete Pavement with Special Select Soil Base 102-100 Temporary Barrier Structures 102-110 Type K Temporary Concrete Barrier System Concrete Structures 102-120 Low Profile Barrier, 102-606 Two-Lane Roadway, Lane Closure Using Temporary Traffic Signals 425-020 Curb Inlet Tops, -Lane, Two-Way, Temporary Diversion Connection 425-022 Curb Inlet - Type 7 102-613 Multilane Roadway

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/rtoc.pdf?sfvrsn=c8fe4ca3_2

RTOC

Construction Operations 353-001 Concrete Slab Replacement Maintenance of Traffic 370-001 Bridge Approach Expansion Joint - Concrete Pavement with Special Select Soil Base 102-100 Temporary Barrier Structures 102-110 Type K Temporary Concrete Barrier System Concrete Structures 102-120 Low Profile Barrier, 102-606 Two-Lane Roadway, Lane Closure Using Temporary Traffic Signals 425-020 Curb Inlet Tops, -Lane, Two-Way, Temporary Diversion Connection 425-022 Curb Inlet - Type 7 102-613 Multilane Roadway

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/rtoc.pdf?sfvrsn=84dd2ec1_2
20 of 1272 results