5764 search results for Standard Specifications
9900301.origind
ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance, No Office Staff Contacted Standard Plans Index Traffic Engineering Manual FDOT Design Manual, Distribution List FROM: Dan Hurtado, P.E., State Specifications Engineer SUBJECT: Proposed, for portable traffic signals and be listed on the APL. The standard includes but is not limited
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/internal/9900301.origind.pdf?sfvrsn=2573b123_06820000.comm
they call out ONVIF Core, Streaming, and Media Service specifications, I don't believe Sunguide, ) This SMTPE standard provides a guaranty of color rendering, resolution, frame rate and aspect ratio. By complying to this standard a camera manufacturer can guaranty that the red car is in fact red, on industry standard video streaming like vehicle counting, classification, Automated Incident reporting, separating the communications specifications for analog and digital in order to avoid confusion
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/comments-responses/6820000.comm.pdf?sfvrsn=19a21402_09900301.origind
ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information ‐ incomplete forms will be returned) Contact the State Specifications Office for assistance, posed revision involve Design Standard Index changes? Yes No Roadway Design staff contacted (name, , State Specifications Engineer SUBJECT: Proposed Specification: 9900301 Temporary Traffic Control, (NTCIP) 1101 base standard, including all amendments as published at the time of contract letting
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/internal/9900301.origind.pdf?sfvrsn=5dfc6d39_0Special Provisions
the Standard Specifications, setting forth conditions varying from or additional to the Standard, to the Standard Specifications. Mandatory Revisions - Critical modifications implemented and added, in the Standard Specifications.*Contracts Office must approve. SP0030201BDI AWARD AND EXECUTION, Special Provisions -Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project
https://www.fdot.gov/specifications/special-provisions2024FDM230SPavtMarkings
and pavement markings not included in the MUTCD or in the Standard Plans are to be detailed in the plans. Sign and pavement marking design must comply with Standard Specifications , Standard Plans, Manual on Uniform Traffic Control Devices (MUTCD) contains detailed information of all standard, are included in FDM 230.6 . 230.1.1 Structural Supports AASHTO’s LRFD Specifications, be justified by an engineering study. Standard Plans , Index 700-120 provides details relating
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm230spavtmarkings.pdf?sfvrsn=a24d4472_15560102.resp
in these specifications other than in item 2 which is specific to leak detectors. If an actual standard, 430 where it requires storm and cross drains to meet water-tight minimum standard, and defined, . No change made. 6. The testing methods in 556-4.3.2: Standard 24 hour pressure test with a recording chart or, - Things to consider..Standard Pressure Test is very vague. Is this a hydrostatic pressure, to define what the Department expectation is for this test such as ANSI/AWWA C600-05 Standard. 24
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/comments-responses/5560102.resp.pdf?sfvrsn=af40c257_0536-002IntReviewPkg
536-001. Other Affected Documents/Offices Person Contacted Affected (Yes/No) Other Standard Plans No FDOT Design Manual No Standard Specifications No Basis of Estimates Manual No Approved Product List No Construction Office No Maintenance Office No Implementation FY-Standard Plans (Next, Origination Form Proposed Revisions to a Standard Plans Index Originator: Stepp, Richard, : REVISION LAST of STANDARD PLANS FY 2025-26 SHEET INDEX 28 2 536-002 GUARDRAIL TRANSITIONS
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/536-002intreviewpkg.pdf?sfvrsn=1b86041a_1536-002IndReviewPkg
536-001. Other Affected Documents/Offices Person Contacted Affected (Yes/No) Other Standard Plans No FDOT Design Manual No Standard Specifications No Basis of Estimates Manual No Approved Product List No Construction Office No Maintenance Office No Implementation FY-Standard Plans (Next, Origination Form Proposed Revisions to a Standard Plans Index Originator: Stepp, Richard, : REVISION LAST of STANDARD PLANS FY 2025-26 SHEET INDEX 28 2 536-002 GUARDRAIL TRANSITIONS
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/536-002indreviewpkg.pdf?sfvrsn=df0de1ac_1536-002FHWAReviewPkg
536-001. Other Affected Documents/Offices Person Contacted Affected (Yes/No) Other Standard Plans No FDOT Design Manual No Standard Specifications No Basis of Estimates Manual No Approved Product List No Construction Office No Maintenance Office No Implementation FY-Standard Plans (Next, Origination Form Proposed Revisions to a Standard Plans Index Originator: Stepp, Richard, : REVISION LAST of STANDARD PLANS FY 2025-26 SHEET INDEX 28 2 536-002 GUARDRAIL TRANSITIONS
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/536-002fhwareviewpkg.pdf?sfvrsn=fc2d4a48_1536-002FHWAApproved
536-001. Other Affected Documents/Offices Person Contacted Affected (Yes/No) Other Standard Plans No FDOT Design Manual No Standard Specifications No Basis of Estimates Manual No Approved Product List No Construction Office No Maintenance Office No Implementation FY-Standard Plans (Next, Origination Form Proposed Revisions to a Standard Plans Index Originator: Stepp, Richard, : REVISION LAST of STANDARD PLANS FY 2025-26 SHEET INDEX 28 2 536-002 GUARDRAIL TRANSITIONS
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/536-002fhwaapproved.pdf?sfvrsn=393a96a6_1SectionMM92V2
for Testing and Materials (ASTM) Standard Test Methods and Specifications, Philadelphia, of the Technical Committees 211, 214, 301 and 318. Florida Department of Transportation Standard Specifications for Road and Bridge Construction. Florida Department of Transportation Approved Products List, with FDOT Specifications Section 105 . The Department will maintain a list of Plants, Specifications Section 346 and this guide will be accepted based on the proper certification
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/materials-manual/sectionmm92v2.pdf?sfvrsn=1905e3_2CHAPTER 21
into the FDOT MAC system. Division II and III of the FDOT Standard Specifications for Road and Bridge, in place of the Division 1 Specifications found in the FDOT Standard Specifications for Road, in 23 CFR 635. FHWA’s CACCM and FDOT Standard Specifications for Road and Bridge Construction list, by Section 105-1.2.3 Notification of Placing Order of FDOT Standard Specifications. Class D, and 20, the application of the appropriate design criteria and construction specifications
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/lap/manual/final_ch-21_2017-06-23.pdf?sfvrsn=642930bd_9TP-06-10-25BSN-30Day
in accordance with Article 3-1 of the Standard Specifications for Road and Bridge Construction, or as amended by the project Specifications Package or any Supplemental Specifications Packages, if it, Standard Specifications for Road and Bridge Construction. Insurance companies must be authorized, , unless stipulated in the project description and specifications. If deemed necessary, with the Plans, Specifications, and Special Provisions of State of Florida Department
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/jun10/tp-06-10-25bsn-30day.pdf?sfvrsn=bc20275e_12024FDM152ShopDrawings
stated, definitions shown referencing the Standard Specifications are the same for the Design-Build Division I Specifications: (1) Shop Drawings: See Specifications. (2) Engineer: See Specifications. (3) Engineer of Record (EOR): See Specifications. Modification for Non-Conventional, Submittals 152.1 Introduction While the Contract Plans and Specifications (including Supplemental, bridge components (e.g., steel girders, non-standard precast/prestressed beams) typically include
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm152shopdrawings.pdf?sfvrsn=c22259df_12024FDM152ShopDrawings
stated, definitions shown referencing the Standard Specifications are the same for the Design-Build Division I Specifications: (1) Shop Drawings: See Specifications. (2) Engineer: See, of the minimum requirements listed in Standard Specifications, Section 5-1 must be returned for resubmittal, Submittals 152.1 Introduction While the Contract Plans and Specifications (including Supplemental, bridge components (e.g., steel girders, non-standard precast/prestressed beams) typically include
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm152shopdrawings.pdf?sfvrsn=64803fb_22025FDM152ShopDrawings
explicitly stated, definitions shown referencing the Standard Specifications are the same for the Design-Build Division I Specifications: (1) Shop Drawings: See Specifications. (2) Engineer: See, in Standard Specifications, Section 5-1 must be returned for resubmittal. Modification for Non, Submittals 152.1 Introduction While the Contract Plans and Specifications (including Supplemental, for structural bridge components (e.g., steel girders, non-standard precast/prestressed beams) typically
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm152shopdrawings.pdf?sfvrsn=41ccee65_22025FDM152ShopDrawings
explicitly stated, definitions shown referencing the Standard Specifications are the same for the Design-Build Division I Specifications: (1) Shop Drawings: See Specifications. (2) Engineer: See, any of the minimum requirements listed in Standard Specifications, Section 5-1 must be returned, Submittals 152.1 Introduction While the Contract Plans and Specifications (including Supplemental, for structural bridge components (e.g., steel girders, non-standard precast/prestressed beams) typically
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm152shopdrawings.pdf?sfvrsn=be9eaa0a_12026FDM152ShopDrawings
in the structure. Unless explicitly stated, definitions shown r eferencing the Standard Specifications are the same for the Design-Build Division I Specifications: (1) Shop Drawings: See Specifications. (2, listed in Standard Specifications, Section 5-1 must be returned for resubmittal. Modification, Shop Drawing Submittals 152.1 Introduction While the Contract Plans and Specifications (including, submittal for structural bridge components (e.g., steel girders, non-standard precast/prestressed beams
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm152shopdrawings.pdf?sfvrsn=7d055215_22026FDM152ShopDrawings
in the structure. Unless explicitly stated, definitions shown r eferencing the Standard Specifications are the same for the Design-Build Division I Specifications: (1) Shop Drawings: See Specifications. (2, listed in Standard Specifications, Section 5-1 must be returned for resubmittal. Modification, Shop Drawing Submittals 152.1 Introduction While the Contract Plans and Specifications (including, submittal for structural bridge components (e.g., steel girders, non-standard precast/prestressed beams
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm152shopdrawings.pdf?sfvrsn=dbde73d8_1TP-12-09-25BSN
of the Standard Specifications for Road and Bridge Construction, or as amended by the project Specifications Package or any Supplemental Specifications Packages, if it is determined that multiple responsive, specified in the most current edition of the Department’s Standard Specifications for Road, and 3-7 of the Standard Specifications, the successful bidder shall execute the necessary contract, description and specifications. If deemed necessary by the Department, certain maintenance contracts
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/dec09/tp-12-09-25bsn.pdf?sfvrsn=1d165a0_1