5764 search results for Standard Specifications

9900301.origind

 ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance, No Office Staff Contacted Standard Plans Index Traffic Engineering Manual FDOT Design Manual, Distribution List FROM: Dan Hurtado, P.E., State Specifications Engineer SUBJECT: Proposed, for portable traffic signals and be listed on the APL. The standard includes but is not limited

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/internal/9900301.origind.pdf?sfvrsn=2573b123_0

6820000.comm

they call out ONVIF Core, Streaming, and Media Service specifications, I don't believe Sunguide, ) This SMTPE standard provides a guaranty of color rendering, resolution, frame rate and aspect ratio. By complying to this standard a camera manufacturer can guaranty that the red car is in fact red, on industry standard video streaming like vehicle counting, classification, Automated Incident reporting, separating the communications specifications for analog and digital in order to avoid confusion

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/comments-responses/6820000.comm.pdf?sfvrsn=19a21402_0

9900301.origind

 ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information ‐ incomplete forms will be returned) Contact the State Specifications Office for assistance, posed revision involve Design Standard Index changes? Yes No Roadway Design staff contacted (name, , State Specifications Engineer SUBJECT: Proposed Specification: 9900301 Temporary Traffic Control, (NTCIP) 1101 base standard, including all amendments as published at the time of contract letting

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/internal/9900301.origind.pdf?sfvrsn=5dfc6d39_0

Special Provisions

the Standard Specifications, setting forth conditions varying from or additional to the Standard, to the Standard Specifications. Mandatory Revisions - Critical modifications implemented and added, in the Standard Specifications.*Contracts Office must approve. SP0030201BDI AWARD AND EXECUTION, Special Provisions -Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project

https://www.fdot.gov/specifications/special-provisions

2024FDM230SPavtMarkings

and pavement markings not included in the MUTCD or in the Standard Plans are to be detailed in the plans. Sign and pavement marking design must comply with Standard Specifications , Standard Plans, Manual on Uniform Traffic Control Devices (MUTCD) contains detailed information of all standard, are included in FDM 230.6 . 230.1.1 Structural Supports AASHTO’s LRFD Specifications, be justified by an engineering study. Standard Plans , Index 700-120 provides details relating

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm230spavtmarkings.pdf?sfvrsn=a24d4472_1

5560102.resp

in these specifications other than in item 2 which is specific to leak detectors. If an actual standard, 430 where it requires storm and cross drains to meet water-tight minimum standard, and defined, . No change made. 6. The testing methods in 556-4.3.2: Standard 24 hour pressure test with a recording chart or, - Things to consider..Standard Pressure Test is very vague. Is this a hydrostatic pressure, to define what the Department expectation is for this test such as ANSI/AWWA C600-05 Standard. 24

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/comments-responses/5560102.resp.pdf?sfvrsn=af40c257_0

536-002IntReviewPkg

536-001. Other Affected Documents/Offices Person Contacted Affected (Yes/No) Other Standard Plans No FDOT Design Manual No Standard Specifications No Basis of Estimates Manual No Approved Product List No Construction Office No Maintenance Office No Implementation FY-Standard Plans (Next,  Origination Form Proposed Revisions to a Standard Plans Index Originator: Stepp, Richard, : REVISION LAST of STANDARD PLANS FY 2025-26 SHEET INDEX 28 2 536-002 GUARDRAIL TRANSITIONS

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/536-002intreviewpkg.pdf?sfvrsn=1b86041a_1

536-002IndReviewPkg

536-001. Other Affected Documents/Offices Person Contacted Affected (Yes/No) Other Standard Plans No FDOT Design Manual No Standard Specifications No Basis of Estimates Manual No Approved Product List No Construction Office No Maintenance Office No Implementation FY-Standard Plans (Next,  Origination Form Proposed Revisions to a Standard Plans Index Originator: Stepp, Richard, : REVISION LAST of STANDARD PLANS FY 2025-26 SHEET INDEX 28 2 536-002 GUARDRAIL TRANSITIONS

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/536-002indreviewpkg.pdf?sfvrsn=df0de1ac_1

536-002FHWAReviewPkg

536-001. Other Affected Documents/Offices Person Contacted Affected (Yes/No) Other Standard Plans No FDOT Design Manual No Standard Specifications No Basis of Estimates Manual No Approved Product List No Construction Office No Maintenance Office No Implementation FY-Standard Plans (Next,  Origination Form Proposed Revisions to a Standard Plans Index Originator: Stepp, Richard, : REVISION LAST of STANDARD PLANS FY 2025-26 SHEET INDEX 28 2 536-002 GUARDRAIL TRANSITIONS

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/536-002fhwareviewpkg.pdf?sfvrsn=fc2d4a48_1

536-002FHWAApproved

536-001. Other Affected Documents/Offices Person Contacted Affected (Yes/No) Other Standard Plans No FDOT Design Manual No Standard Specifications No Basis of Estimates Manual No Approved Product List No Construction Office No Maintenance Office No Implementation FY-Standard Plans (Next,  Origination Form Proposed Revisions to a Standard Plans Index Originator: Stepp, Richard, : REVISION LAST of STANDARD PLANS FY 2025-26 SHEET INDEX 28 2 536-002 GUARDRAIL TRANSITIONS

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/536-002fhwaapproved.pdf?sfvrsn=393a96a6_1

SectionMM92V2

for Testing and Materials (ASTM) Standard Test Methods and Specifications, Philadelphia, of the Technical Committees 211, 214, 301 and 318. Florida Department of Transportation Standard Specifications for Road and Bridge Construction. Florida Department of Transportation Approved Products List, with FDOT Specifications Section 105 . The Department will maintain a list of Plants, Specifications Section 346 and this guide will be accepted based on the proper certification

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/materials-manual/sectionmm92v2.pdf?sfvrsn=1905e3_2

CHAPTER 21

into the FDOT MAC system. Division II and III of the FDOT Standard Specifications for Road and Bridge, in place of the Division 1 Specifications found in the FDOT Standard Specifications for Road, in 23 CFR 635. FHWA’s CACCM and FDOT Standard Specifications for Road and Bridge Construction list, by Section 105-1.2.3 Notification of Placing Order of FDOT Standard Specifications. Class D, and 20, the application of the appropriate design criteria and construction specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/lap/manual/final_ch-21_2017-06-23.pdf?sfvrsn=642930bd_9

TP-06-10-25BSN-30Day

in accordance with Article 3-1 of the Standard Specifications for Road and Bridge Construction, or as amended by the project Specifications Package or any Supplemental Specifications Packages, if it, Standard Specifications for Road and Bridge Construction. Insurance companies must be authorized, , unless stipulated in the project description and specifications. If deemed necessary, with the Plans, Specifications, and Special Provisions of State of Florida Department

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/jun10/tp-06-10-25bsn-30day.pdf?sfvrsn=bc20275e_1

2024FDM152ShopDrawings

stated, definitions shown referencing the Standard Specifications are the same for the Design-Build Division I Specifications: (1) Shop Drawings: See Specifications. (2) Engineer: See Specifications. (3) Engineer of Record (EOR): See Specifications. Modification for Non-Conventional, Submittals 152.1 Introduction While the Contract Plans and Specifications (including Supplemental, bridge components (e.g., steel girders, non-standard precast/prestressed beams) typically include

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm152shopdrawings.pdf?sfvrsn=c22259df_1

2024FDM152ShopDrawings

stated, definitions shown referencing the Standard Specifications are the same for the Design-Build Division I Specifications: (1) Shop Drawings: See Specifications. (2) Engineer: See, of the minimum requirements listed in Standard Specifications, Section 5-1 must be returned for resubmittal, Submittals 152.1 Introduction While the Contract Plans and Specifications (including Supplemental, bridge components (e.g., steel girders, non-standard precast/prestressed beams) typically include

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm152shopdrawings.pdf?sfvrsn=64803fb_2

2025FDM152ShopDrawings

explicitly stated, definitions shown referencing the Standard Specifications are the same for the Design-Build Division I Specifications: (1) Shop Drawings: See Specifications. (2) Engineer: See, in Standard Specifications, Section 5-1 must be returned for resubmittal. Modification for Non, Submittals 152.1 Introduction While the Contract Plans and Specifications (including Supplemental, for structural bridge components (e.g., steel girders, non-standard precast/prestressed beams) typically

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm152shopdrawings.pdf?sfvrsn=41ccee65_2

2025FDM152ShopDrawings

explicitly stated, definitions shown referencing the Standard Specifications are the same for the Design-Build Division I Specifications: (1) Shop Drawings: See Specifications. (2) Engineer: See, any of the minimum requirements listed in Standard Specifications, Section 5-1 must be returned, Submittals 152.1 Introduction While the Contract Plans and Specifications (including Supplemental, for structural bridge components (e.g., steel girders, non-standard precast/prestressed beams) typically

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm152shopdrawings.pdf?sfvrsn=be9eaa0a_1

2026FDM152ShopDrawings

in the structure. Unless explicitly stated, definitions shown r eferencing the Standard Specifications are the same for the Design-Build Division I Specifications: (1) Shop Drawings: See Specifications. (2, listed in Standard Specifications, Section 5-1 must be returned for resubmittal. Modification, Shop Drawing Submittals 152.1 Introduction While the Contract Plans and Specifications (including, submittal for structural bridge components (e.g., steel girders, non-standard precast/prestressed beams

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm152shopdrawings.pdf?sfvrsn=7d055215_2

2026FDM152ShopDrawings

in the structure. Unless explicitly stated, definitions shown r eferencing the Standard Specifications are the same for the Design-Build Division I Specifications: (1) Shop Drawings: See Specifications. (2, listed in Standard Specifications, Section 5-1 must be returned for resubmittal. Modification, Shop Drawing Submittals 152.1 Introduction While the Contract Plans and Specifications (including, submittal for structural bridge components (e.g., steel girders, non-standard precast/prestressed beams

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm152shopdrawings.pdf?sfvrsn=dbde73d8_1

TP-12-09-25BSN

of the Standard Specifications for Road and Bridge Construction, or as amended by the project Specifications Package or any Supplemental Specifications Packages, if it is determined that multiple responsive, specified in the most current edition of the Department’s Standard Specifications for Road, and 3-7 of the Standard Specifications, the successful bidder shall execute the necessary contract, description and specifications. If deemed necessary by the Department, certain maintenance contracts

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/dec09/tp-12-09-25bsn.pdf?sfvrsn=1d165a0_1
20 of 5764 results