3165 search results for intersection

PublicHearing_ORANGE COUNTY_Summary_2027_2031

444980-2 $18,007,581 445696-1 - SR 438 INTERSECTION IMPROVEMENTS AT KINGSLAND AVE Type of Work: SAFETY, ) AT JETPORT DR Type of Work: INTERSECTION IMPROVEMENT Phase Funding Source 2027 2028 2029 2030 2031

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_orange-county_summary_2027_2031.pdf?sfvrsn=2874c3ea_1

446296_I-75_DDI_Drainage_Report_PHIIR_JUL2024

that represent the four quadrants of the intersection: Basin 1, Basin 2, Basin 3, and Basin 4. All four, from the in-field areas of the intersection. The southern two quadrants (Basin 1 and 2) of the intersection outfall to the south; and the northern two quadrants (Basin 3 and 4) outfall to the north, ponds to the northeast of the I-75 and Daniel’s Parkway intersection outfall to the I-75 northeast, quadrant of the intersection. This basin includes the area that directly outfalls to the in-field

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25118/446296_i-75_ddi_drainage_report_phiir_jul2024.pdf?sfvrsn=9a06db12_1

FDOT_FLFAC_Sept5

• Flyovers at major intersections • Full-service truck shops • Incentives for a switch to alternative

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/multimodal/flfac/fdot_flfac_sept5.pdf?sfvrsn=46281def_3

Design Standards 2008 Interim

and changed location of rumble strip. 546 1&6 of 6 546.pdf SIGHT DISTANCE AT INTERSECTIONS – Dated

https://www.fdot.gov/roadway/ds/08/istds.shtm

Chapter_10

Apparel. 10.9.6 Flag use is limited to immediate emergencies, intersections and when working

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/safety/industrialsafety/chapter_10.pdf?sfvrsn=358bc67f_1

pcshistory

to reflect pavement improvements without complete overlay (Intersections overlays). 5) System coded

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/performance/pcs/pcshistory.pdf?sfvrsn=f9ff9f5_1

43498615201 Plans Rigid Pavt MP13.988-14.472_PhaseIV

MEDIAN DETAILS CURB RAMP DETAILS INTERSECTION DETAILS ROADWAY PLAN-PROFILE GENERAL NOTES PROJECT, DETAILS CURB RAMP DETAILS INTERSECTION DETAILS ROADWAY PLAN-PROFILE GENERAL NOTES PROJECT CONTROL, 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 422.000 422.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 422.000 422.000 0104- 10- 3 SEDIMENT BARRIER, PAVEMENT. CONSTRUCTION OF CURB AND GUTTER, CURB RAMPS, AND MODIFICATIONS TO THE US 27 INTERSECTION

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/25122/43498615201-plans-rigid-pavt-mp13-988-14-472_phaseiv.pdf?sfvrsn=196639c_1

521-611

of the intersection of the retaining wall at approach slabs: See Wall Company Drawings for number and spacing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/idx/521-611.pdf?sfvrsn=b5c8ad52_1

521-610

Pavement Approaches) 11. The following Indexes contain details of the intersection of the retaining

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/idx/521-610.pdf?sfvrsn=55cf9714_1
20 of 3165 results