2746 search results for improvements

P3 Summary_8-7-2023

, FM 251688- 1, 423126-2, 429300-2, Contract Number E6J53) – This project includes improvements, provides the I-4 Ultimate Improvements for approximately 21 miles from Kirkman Road in Orange, , 2014. The capital cost was $667 million. I-595 Improvements (DBFOM, FM#420809-3-5A/52/82 and 420809-8-52, Contract Number E4J69) – This project included operational improvements to the I-595, work included new pavement, drainage system improvements, bridge widenings, bridge replacements, noise

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/comptroller/pfo/p3-summary_8-7-2023.pdf?sfvrsn=4c15de43_4

P3 Summary_(1-25-2024)

, 423126-2, 429300-2, Contract Number E6J53) – This project includes improvements for about 1.4 miles, Ultimate Improvements for approximately 21 miles from Kirkman Road in Orange County to SR 434 in Seminole, cost was $667 million. I-595 Improvements (DBFOM, FM#420809-3-5A/52/82 and 420809-8-52, Contract Number E4J69) – This project included operational improvements to the I-595 corridor and the addition, improvements, bridge widenings, bridge replacements, noise and retaining wall construction, Intelligent

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/comptroller/pfo/p3-summary_(1-25-2024).pdf?sfvrsn=4e5ba03c_1

449681-1 Coconut Rd RAB Imp_SCOPE CONCEPT LRE_FINAL_2024-0124 LT

Technical Scope and Long-Range Estimate (LRE) for FPID No. 449681-1 Improvements to the Via Coconut, January 24, 2024 To: Lavenia Toole, PE From: Felicia Pannell, PE RE: Improvements to the Via, . Project Location Map: Intent and Nature of Project: Construct pedestrian and bicycle improvements, pedestrian and bicycle safety improvements are needed since the RABs’ original construction in 2006-2007. Improvements to the ramps and crosswalks will increase the visibility of pedestrians

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25112/449681-1-coconut-rd-rab-imp_scope-concept-lre_final_2024-0124-lt.pdf?sfvrsn=1eb19e82_1

FDOT Releases Construction Timelines for Moving Florida Forward Projects

interchanges along I-75 in Collier County. Improvements include the reconstruction of the I-75 interchange to a diverging diamond interchange. Proposed improvements are located within the right-of-way, : This project will provide capacity improvements to over 18 miles of I-75 from Golden Gate Parkway, shared-use paths on both sides. The project also includes drainage improvements along the entire, side of the roadway. Intersection improvements are proposed for the intersection of S.R. 29 at New

https://www.fdot.gov/info/co/news/2023/09252023

2024nov-thu02-RailSafety

) program On Site Signal Safety Improvements FDOT was awarded $12.9 million FDOT match: $5.59 million, Florida Rail Corridor Rail Grants Consolidated Rail Infrastructure and Safety Improvements (CRISI) Grant Central Florida Rail Corridor Crossings and Tr e s p a s s ing Safety Improvements project, for improvements at 110 highway-rail grade crossings • Pavement markings • Signage • Surface replacement • Traffic signal equipment • Complete trespassing prevention improvements at select

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2024-november/2024nov-thu02-railsafety.pdf?sfvrsn=294ebe07_1

2024nov-thu02-RailSafety

) program On Site Signal Safety Improvements FDOT was awarded $12.9 million FDOT match: $5.59 million, Florida Rail Corridor Rail Grants Consolidated Rail Infrastructure and Safety Improvements (CRISI) Grant Central Florida Rail Corridor Crossings and Tr e s p a s s ing Safety Improvements project, for improvements at 110 highway-rail grade crossings • Pavement markings • Signage • Surface replacement • Traffic signal equipment • Complete trespassing prevention improvements at select

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2024-june/2024nov-thu02-railsafety.pdf?sfvrsn=ff9619e1_1

447880-1_MedianSafety_ MP 3.268_MP 4.136_(2024)

Road Safety Improvements Lee County, Florida 1 Candidate Project 4P Scope April 21, 2021, within the roadway corridor needing improvements, requested by the District One Traffic Safety, improvements to this roadway shall adhere to the standards set forth in the 2020 FDOT Design Manual, improvements along SR 865 consist of converting the continuous two-way left turn lane into a 14-foot, continuous raised median. Project Abstract Safety improvements at center median on SR 865 from Linda

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26112/447880-1_mediansafety_-mp-3-268_mp-4-136_(2024).pdf?sfvrsn=5b59d9fc_1

I95Newsletter2025_LetterENG-4pages_WEB

improvements to the Hallandale Beach Boulevard, Pembroke Road, and Hollywood Boulevard interchanges, with the potential improvements. This study is being coordinated with the following four adjacent, improvements. A PD&E Study is required to satisfy the National Environmental Policy Act (NEPA, the proposed improvements. Noise specialists used the approved federal and state procedure, corridor improvements. The public hearing is held following the completion of the draft

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/i95-858-820-docs/april2025publicmtg/i95newsletter2025_lettereng-4pages_web.pdf?sfvrsn=b18c95d8_3

441699-1 CR 713 PDE Public Hearing_Handout_v6

, conceptual design, and social, economic, and environmental effects of the proposed improvements, to four travel lanes, a pedestrian and bicyclist shared-use path and intersection improvements, include: • Capacity: Based on traffic projections, if no improvements are proposed, the congestion, lanes in each direction, including improvements at the SW Baneberry Drive, SW Golden Bear Way, SW, . Intersection improvements at the CR 713/SW High Meadow Avenue and CR 714/SW Martin Highway include

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cr713pdedocs/441699-1-cr-713-pde-public-hearing_handout_v6.pdf?sfvrsn=7b7ba20a_1

Public Notices

of this meeting is to learn about the proposed improvements for the above-referenced projects. The public, Brevard County PD&E Study in Indian River and Brevard County, Florida. The proposed improvements, 12-foot travel lanes Two 8-foot shoulders Two 12-foot shared use paths South of the bridge, improvements, crossing SR A1A at the State Park’s south entrance North of the bridge, the improvements include, ) Access Road All bridge improvements are located within existing FDOT Right of Way and avoided where

https://www.fdot.gov/projects/sebastian-inlet-bridge/public-notices

2023 Homestead Freight Improvement Plan

........................................................................................ 4-6 4.3 Future Transportation Improvements, ............................................................................................................... 4-49 Figure 4-30 Phase 1 (2020-2025) Improvements, Phase 2 (2026-2030) Improvements .................................................................................................... 4-52 Figure 4-32 Phase 3 (2032-2035) Improvements, 4-33 Phase 4 (2036-2045) Improvements

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/rail/publications/d6/2023-homestead-freight-improvement-plan.pdf?sfvrsn=3756ccff_1

E1V08

Please read the full advertisement Description: The improvements under this Contract consist of multi-lane roundabout construction, milling and resurfacing, drainage improvements, curb and gutter, lighting, signing and pavement marking, sidewalks, and utility improvements on SR 64 at Lorraine Road

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2023/nov02/e1v08.pdf?sfvrsn=c0fe1376_1

WP FEATURED PROJECTS 2023

) and includes access roads to Gilbert’s Resort in Monroe County. Some of the improvements, improvements. * PD&E Study in 2024 * RFP development in 2026 * Construction in 2030 * Cost $659, segments at the north and south termini. Improvements will also consist of a boardwalk trail, gravity, several sections of the trail. The project improvements will close significant gaps in the Trail, drainage infrastructure, signalization, lighting, signing, pavement markings, and landscape improvements

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d6_documents/wp-featured-projects-2023.pdf?sfvrsn=f4151df9_1

E3W67BidTab

: District 3 District: The Improvements under this District Contract consist of milling and resurfacing, improvements include replacing existing guardrail at box culvert locations, cross slope correction, minor drainage improvements and upgrading existing signage and roadway striping. PRE-QUALIFICATION

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/bidtabs/2023/nov09/e3w67bidtab.pdf?sfvrsn=fab6cac3_1

D240

services improvements Signal timing/ coordination improvements Speed limits reduction, services Intersection improvements Temp. barrier Aerial surveillance Ridesharing/ carpooling

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/d240.pdf?sfvrsn=5aa53496_1

ICYMI Governor DeSantis Announces over $122 Million for Rural Infrastructure

drainage improvements, and the construction, reconstruction, resurfacing, and capacity and safety improvements of county roads, and constructing capacity and safety improvements. $292.3 million – Small

https://www.fdot.gov/info/co/news/2024/09102024

2025FDM113RWRequirements

improvements. Fee simple is the strongest interest available to the Department and is sought for most permanent highway facilities. When improvements are designed which will fall outside of the existing R/W, , under or through the property of another. They are used when permanent structures or improvements, such as construction of improvements requisite of the project, construction of temporary detours, #625-000-002 FDOT Design Manual 113 - Right of Way Requirements the highway improvements

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm113rwrequirements.pdf?sfvrsn=53e4a500_1

4416362 - Fact Sheet ENG - Monterey Road

the Monterey Road/FEC railroad crossing intersection. Therefore, improvements to this intersection would, Management & Operations (TSM&O) improvements. The analysis encompasses various build alternatives, operations and safety, particularly focusing on Level of Service (LOS) improvements at signalized

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/montereyrd-fec-study-documents/4416362---fact-sheet-eng---monterey-road.pdf?sfvrsn=e340f3dd_1

E56F1

advertisement Description: The Improvements under this Contract consist of modifying traffic signalization, , curb ramp improvements, APS pushbutton installations, cabinet modifications, and other ADA improvements as needed The intent of this Contract is to provide means for the DEPARTMENT to quickly

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2025/may06/e56f1.pdf?sfvrsn=986222a_1

ICYMI - Governor Ron DeSantis Announces Major Infrastructure Investments for Tampa Bay

is delivering major improvements years ahead of schedule, reducing delays for families and businesses, projects statewide, delivering improvements years ahead of schedule. Florida has committed more than $68 billion to transportation improvements over the next five years, ensuring that the state’s

https://www.fdot.gov/info/co/news/2025/08272025
20 of 2746 results