2746 search results for improvements
P3 Summary_8-7-2023
, FM 251688- 1, 423126-2, 429300-2, Contract Number E6J53) – This project includes improvements, provides the I-4 Ultimate Improvements for approximately 21 miles from Kirkman Road in Orange, , 2014. The capital cost was $667 million. I-595 Improvements (DBFOM, FM#420809-3-5A/52/82 and 420809-8-52, Contract Number E4J69) – This project included operational improvements to the I-595, work included new pavement, drainage system improvements, bridge widenings, bridge replacements, noise
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/comptroller/pfo/p3-summary_8-7-2023.pdf?sfvrsn=4c15de43_4P3 Summary_(1-25-2024)
, 423126-2, 429300-2, Contract Number E6J53) – This project includes improvements for about 1.4 miles, Ultimate Improvements for approximately 21 miles from Kirkman Road in Orange County to SR 434 in Seminole, cost was $667 million. I-595 Improvements (DBFOM, FM#420809-3-5A/52/82 and 420809-8-52, Contract Number E4J69) – This project included operational improvements to the I-595 corridor and the addition, improvements, bridge widenings, bridge replacements, noise and retaining wall construction, Intelligent
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/comptroller/pfo/p3-summary_(1-25-2024).pdf?sfvrsn=4e5ba03c_1449681-1 Coconut Rd RAB Imp_SCOPE CONCEPT LRE_FINAL_2024-0124 LT
Technical Scope and Long-Range Estimate (LRE) for FPID No. 449681-1 Improvements to the Via Coconut, January 24, 2024 To: Lavenia Toole, PE From: Felicia Pannell, PE RE: Improvements to the Via, . Project Location Map: Intent and Nature of Project: Construct pedestrian and bicycle improvements, pedestrian and bicycle safety improvements are needed since the RABs’ original construction in 2006-2007. Improvements to the ramps and crosswalks will increase the visibility of pedestrians
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25112/449681-1-coconut-rd-rab-imp_scope-concept-lre_final_2024-0124-lt.pdf?sfvrsn=1eb19e82_1FDOT Releases Construction Timelines for Moving Florida Forward Projects
interchanges along I-75 in Collier County. Improvements include the reconstruction of the I-75 interchange to a diverging diamond interchange. Proposed improvements are located within the right-of-way, : This project will provide capacity improvements to over 18 miles of I-75 from Golden Gate Parkway, shared-use paths on both sides. The project also includes drainage improvements along the entire, side of the roadway. Intersection improvements are proposed for the intersection of S.R. 29 at New
https://www.fdot.gov/info/co/news/2023/092520232024nov-thu02-RailSafety
) program On Site Signal Safety Improvements FDOT was awarded $12.9 million FDOT match: $5.59 million, Florida Rail Corridor Rail Grants Consolidated Rail Infrastructure and Safety Improvements (CRISI) Grant Central Florida Rail Corridor Crossings and Tr e s p a s s ing Safety Improvements project, for improvements at 110 highway-rail grade crossings • Pavement markings • Signage • Surface replacement • Traffic signal equipment • Complete trespassing prevention improvements at select
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2024-november/2024nov-thu02-railsafety.pdf?sfvrsn=294ebe07_12024nov-thu02-RailSafety
) program On Site Signal Safety Improvements FDOT was awarded $12.9 million FDOT match: $5.59 million, Florida Rail Corridor Rail Grants Consolidated Rail Infrastructure and Safety Improvements (CRISI) Grant Central Florida Rail Corridor Crossings and Tr e s p a s s ing Safety Improvements project, for improvements at 110 highway-rail grade crossings • Pavement markings • Signage • Surface replacement • Traffic signal equipment • Complete trespassing prevention improvements at select
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2024-june/2024nov-thu02-railsafety.pdf?sfvrsn=ff9619e1_1447880-1_MedianSafety_ MP 3.268_MP 4.136_(2024)
Road Safety Improvements Lee County, Florida 1 Candidate Project 4P Scope April 21, 2021, within the roadway corridor needing improvements, requested by the District One Traffic Safety, improvements to this roadway shall adhere to the standards set forth in the 2020 FDOT Design Manual, improvements along SR 865 consist of converting the continuous two-way left turn lane into a 14-foot, continuous raised median. Project Abstract Safety improvements at center median on SR 865 from Linda
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26112/447880-1_mediansafety_-mp-3-268_mp-4-136_(2024).pdf?sfvrsn=5b59d9fc_1I95Newsletter2025_LetterENG-4pages_WEB
improvements to the Hallandale Beach Boulevard, Pembroke Road, and Hollywood Boulevard interchanges, with the potential improvements. This study is being coordinated with the following four adjacent, improvements. A PD&E Study is required to satisfy the National Environmental Policy Act (NEPA, the proposed improvements. Noise specialists used the approved federal and state procedure, corridor improvements. The public hearing is held following the completion of the draft
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/i95-858-820-docs/april2025publicmtg/i95newsletter2025_lettereng-4pages_web.pdf?sfvrsn=b18c95d8_3441699-1 CR 713 PDE Public Hearing_Handout_v6
, conceptual design, and social, economic, and environmental effects of the proposed improvements, to four travel lanes, a pedestrian and bicyclist shared-use path and intersection improvements, include: • Capacity: Based on traffic projections, if no improvements are proposed, the congestion, lanes in each direction, including improvements at the SW Baneberry Drive, SW Golden Bear Way, SW, . Intersection improvements at the CR 713/SW High Meadow Avenue and CR 714/SW Martin Highway include
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cr713pdedocs/441699-1-cr-713-pde-public-hearing_handout_v6.pdf?sfvrsn=7b7ba20a_1Public Notices
of this meeting is to learn about the proposed improvements for the above-referenced projects. The public, Brevard County PD&E Study in Indian River and Brevard County, Florida. The proposed improvements, 12-foot travel lanes Two 8-foot shoulders Two 12-foot shared use paths South of the bridge, improvements, crossing SR A1A at the State Park’s south entrance North of the bridge, the improvements include, ) Access Road All bridge improvements are located within existing FDOT Right of Way and avoided where
https://www.fdot.gov/projects/sebastian-inlet-bridge/public-notices2023 Homestead Freight Improvement Plan
........................................................................................ 4-6 4.3 Future Transportation Improvements, ............................................................................................................... 4-49 Figure 4-30 Phase 1 (2020-2025) Improvements, Phase 2 (2026-2030) Improvements .................................................................................................... 4-52 Figure 4-32 Phase 3 (2032-2035) Improvements, 4-33 Phase 4 (2036-2045) Improvements
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/rail/publications/d6/2023-homestead-freight-improvement-plan.pdf?sfvrsn=3756ccff_1E1V08
Please read the full advertisement Description: The improvements under this Contract consist of multi-lane roundabout construction, milling and resurfacing, drainage improvements, curb and gutter, lighting, signing and pavement marking, sidewalks, and utility improvements on SR 64 at Lorraine Road
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2023/nov02/e1v08.pdf?sfvrsn=c0fe1376_1WP FEATURED PROJECTS 2023
) and includes access roads to Gilbert’s Resort in Monroe County. Some of the improvements, improvements. * PD&E Study in 2024 * RFP development in 2026 * Construction in 2030 * Cost $659, segments at the north and south termini. Improvements will also consist of a boardwalk trail, gravity, several sections of the trail. The project improvements will close significant gaps in the Trail, drainage infrastructure, signalization, lighting, signing, pavement markings, and landscape improvements
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d6_documents/wp-featured-projects-2023.pdf?sfvrsn=f4151df9_1E3W67BidTab
: District 3 District: The Improvements under this District Contract consist of milling and resurfacing, improvements include replacing existing guardrail at box culvert locations, cross slope correction, minor drainage improvements and upgrading existing signage and roadway striping. PRE-QUALIFICATION
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/bidtabs/2023/nov09/e3w67bidtab.pdf?sfvrsn=fab6cac3_1D240
services improvements Signal timing/ coordination improvements Speed limits reduction, services Intersection improvements Temp. barrier Aerial surveillance Ridesharing/ carpooling
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/d240.pdf?sfvrsn=5aa53496_1ICYMI Governor DeSantis Announces over $122 Million for Rural Infrastructure
drainage improvements, and the construction, reconstruction, resurfacing, and capacity and safety improvements of county roads, and constructing capacity and safety improvements. $292.3 million – Small
https://www.fdot.gov/info/co/news/2024/091020242025FDM113RWRequirements
improvements. Fee simple is the strongest interest available to the Department and is sought for most permanent highway facilities. When improvements are designed which will fall outside of the existing R/W, , under or through the property of another. They are used when permanent structures or improvements, such as construction of improvements requisite of the project, construction of temporary detours, #625-000-002 FDOT Design Manual 113 - Right of Way Requirements the highway improvements
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm113rwrequirements.pdf?sfvrsn=53e4a500_14416362 - Fact Sheet ENG - Monterey Road
the Monterey Road/FEC railroad crossing intersection. Therefore, improvements to this intersection would, Management & Operations (TSM&O) improvements. The analysis encompasses various build alternatives, operations and safety, particularly focusing on Level of Service (LOS) improvements at signalized
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/montereyrd-fec-study-documents/4416362---fact-sheet-eng---monterey-road.pdf?sfvrsn=e340f3dd_1E56F1
advertisement Description: The Improvements under this Contract consist of modifying traffic signalization, , curb ramp improvements, APS pushbutton installations, cabinet modifications, and other ADA improvements as needed The intent of this Contract is to provide means for the DEPARTMENT to quickly
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2025/may06/e56f1.pdf?sfvrsn=986222a_1ICYMI - Governor Ron DeSantis Announces Major Infrastructure Investments for Tampa Bay
is delivering major improvements years ahead of schedule, reducing delays for families and businesses, projects statewide, delivering improvements years ahead of schedule. Florida has committed more than $68 billion to transportation improvements over the next five years, ensuring that the state’s
https://www.fdot.gov/info/co/news/2025/08272025