5200 search results for Standard Specifications
7110200-724FHWA
Tallahassee, Florida 32312 Re: State Specifications Office Section: 711 Proposed Specification, Strickland, P.E. State Specifications Engineer DS/jb Attachment cc: Florida Transportation Builders, -Applied Standard and Refurbishment Thermoplastic, with the manufacturer’s recommendations. 711-4.2 Thickness: 711-4.2.1 Hot-Applied Standard Thermoplastic Markings: Apply or recap standard thermoplastic pavement markings for longitudinal lines
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/fhwa/7110200-724fhwa.pdf?sfvrsn=803c3245_1D4-02-07-25BSN
After consideration in accordance with Article 3-1 of the Standard Specifications for Road, edition of the Department’s Standard Specifications for Road and Bridge Construction. Insurance companies, of the Standard Specifications, the successful bidder shall execute the necessary contract documents, /contracts/cpp-online- ordering/bidder-assist.shtm Standard Specifications for Road and Bridge Construction, STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION FY 2024-25 (SECTION 7-13) FOR INSURANCE LIMITS
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2025/feb07/d4-02-07-25bsn.pdf?sfvrsn=9fd7fccd_1FY 2025-26 eBook and Workbook History
and Workbook eBook refers to the Standard Specifications. Workbook refers to Special Provisions. Review, Standard Specifications Title Internal Comments Responses Industry Comments Responses FHWA Approval, Department of Transportation List of Revisions to the FY 2025-26 Specifications eBook and Workbook
https://www.fdot.gov/programmanagement/implemented/workbooks/history/fy25-26/fy-2025-26-ebook-and-workbook-historySP7150000redline
for submittal of shop drawings in the Standard Specifications is waived to expedite the submittal of said, on this project will comply with Section 100 of the Standard Specifications unless otherwise amended, of Transportation Standard Specifications for Road and Bridge Construction and is consistent, and repair items of work for maintaining the highway lighting system, including conventional/standard, ,wherenoplansarefurnishedforworkandwheretheterm “shown in the plans” is used in these specifications, to mean, “as shown
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/maintenance/review-package/sp7150000redline.pdf?sfvrsn=8238999f_0SS0060103-722
the following documentation: 1.Supporting documentation as required by the Specifications, Standard, with the specifications. 2.A photograph displaying the product as shipped with packaging. 3.Alist, by the Specifications. 6.Construction material percentages and country source of materials. 7.Last two manufacturing, , or Standard Plans requirements. A product sample and additional product testing and documentation may
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/workbook/ss0060103-722.pdf?sfvrsn=238b321_4SP7150000
as follows: The time frame outlined for submittal of shop drawings in the Standard Specifications, on this project will comply with Section 100 of the Standard Specifications unless otherwise amended, the National Electrical Code, Florida Department of Transportation Standard Specifications for Road, and repair items of work for maintaining the highway lighting system, including conventional/standard, are furnished for work and where the term “shown in the plans” is used in these specifications
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/maintenance/implemented/sp7150000.pdf?sfvrsn=3086539f_12000702-722origind
ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance, : Will the proposed revision require changes to: Publication Yes No Office Staff Contacted Standard Plans, , State Specifications Engineer SUBJECT: Proposed Specification: 2000702 Rock Base. In accordance, with the standard maintenance of traffic requirements of the Contract. The thickness is considered deficient
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/2000702-722origind.pdf?sfvrsn=b4311e90_21200101-122origind
ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance, : Will the proposed revision require changes to: Publication Yes No Office Staff Contacted Standard Plans, : Daniel Strickland, P.E., State Specifications Engineer SUBJECT: Proposed Specification: 1200101, to prepare subgrades and foundations. Construct embankments in accordance with Standard Plans, Index
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/internal/1200101-122origind.pdf?sfvrsn=7ea5b2dc_29480205-122origind
ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance, : Will the proposed revision require changes to: Publication Yes No Office Staff Contacted Standard Plans, Specifications Engineer SUBJECT: Proposed Specification: 9480205 OPTIONAL DRAINAGE PRODUCTS, polyethylene corrugated pipe into the Standard Specification. Please share this proposal with others
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/internal/9480205-122origind.pdf?sfvrsn=23d3d146_23000201-122origind
ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance, : Will the proposed revision require changes to: Publication Yes No Office Staff Contacted Standard Plans, Specifications Engineer SUBJECT: Proposed Specification: 3000201 PRIME AND TACK COATS, to the Standard Specification. Please share this proposal with others within your responsibility. Review
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/internal/3000201-122origind.pdf?sfvrsn=a4ce36b3_26760206.origind
ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance, No Office Staff Contacted Standard Plans Index Traffic Engineering Manual FDOT Design Manual, Distribution List FROM: Dan Hurtado, P.E., State Specifications Engineer SUBJECT: Proposed, , 600V UL rated cable, fabricated with an L5-30R on one end and standard 120 V duplex plug
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/internal/6760206.origind.pdf?sfvrsn=1853fbe8_06530202origind
ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance, No Office Staff Contacted Standard Plans Index Traffic Engineering Manual FDOT Design Manual, Distribution List FROM: Dan Hurtado, P.E., State Specifications Engineer SUBJECT: Proposed, painted black in accordance with Military Standard MIL-PRF-24712A or AAMA-2603-02 with a reflectance
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/internal/6530202origind.pdf?sfvrsn=293f7c34_49900100.origind
ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information ‐ incomplete forms will be returned) Contact the State Specifications Office for assistance, /Subarticles: Telephone: email: Will the proposed revision involve Design Standard Index changes? Yes, Specifications Engineer SUBJECT: Proposed Specification: 9900100 Temporary Traffic Control Device, and include detailed vendor drawings showing typical application of the device in accordance with Standard
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/internal/9900100.origind.pdf?sfvrsn=44c97cd6_09550000.origind
ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information ‐ incomplete forms will be returned) Contact the State Specifications Office for assistance, /Subarticles: Telephone: email: Will the proposed revision involve Design Standard Index changes? Yes, Specifications Engineer SUBJECT: Proposed Specification: 9550000 Timber Treatment (including, , CCA, CA, MCA and ACZA shall be in accordance with the appropriate AWPA P Standard. MCQ and MCA
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/internal/9550000.origind.pdf?sfvrsn=848ba048_01020200.origind
ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information ‐ incomplete forms will be returned) Contact the State Specifications Office for assistance, /Subarticles: Telephone: email: Will the proposed revision involve Design Standard Index changes? Yes, Specifications Engineer SUBJECT: Proposed Specification: 1020200 Maintenance of Traffic, will be withheld until all deficiencies are corrected. Removable tape may be substituted for standard
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/internal/1020200.origind.pdf?sfvrsn=374ccc41_09300503.origind
ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information ‐ incomplete forms will be returned) Contact the State Specifications Office for assistance, /Subarticles: Telephone: email: Will the proposed revision involve Design Standard Index changes? Yes, Specifications Engineer SUBJECT: Proposed Specification: 9300503 Materials for Concrete Repair, the physical properties stated in Table 4 as determined by the specified standard test methods
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/internal/9300503.origind.pdf?sfvrsn=222227c5_0D9240000.do
as may be allowed or required elsewhere in the specifications for specific concrete applications. Admixtures shall comply with applicable AASHTO and ASTM specifications as modified in 924-2.3 through, the requirements of 346-2.6.3 and comply with the applicable AASHTO specifications as modified, in accordance with Standard Methods for the Examination of Water and Waste Water, 18th Edition. Avolume, of at least three standard 6 inch by 12 inch [150 mm by 300 mm] cylinders of each class of concrete
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2003/january-2003/workbook/d9240000.do.pdf?sfvrsn=79e980b6_06460000.origind
. 6.Breakaway: Meets the requirements in the latest revision of the AASHTO Standard Specifications, ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Date: Specification Section: Originator: Articles/Subarticles: Telephone: email: Will the proposed revision involve Design Standard Index changes? Yes No Roadway, the State Specifications Office for assistance in completing this form. Daniel Scheer 850-414-4130
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/internal/6460000.origind.pdf?sfvrsn=260be6f_09960103InternalCommentResponse
AND RESPONSES (Please note all comments and responses are verbatim as received. The Specifications Office does not alter typos or grammar.) BLACK = Comment BLUE = Specifications Response GREEN, be allowed to provide the HDMI 2.0 interface as necessary and if needed. For instance, standard, TAKEN: No change needed. COMMENT: 996-2.3.4 – Recommend adding 240 VAC as this is the standard, for clarity is probably warranted. Moving forward, the TERL generally plans to update any specifications
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/internal/comments-responses/9960103internalcommentresponse.pdf?sfvrsn=331b3d62_1SP7150100
as follows: The time frame outlined for submittal of shop drawings in the Standard Specifications is waived, will comply with Section 100 of the Standard Specifications unless otherwise amended, Standard Specifications for Road and Bridge Construction and is consistent with the existing, and repair items of work for maintaining the highway lighting system, including conventional/standard, are furnished for work and where the term “shown in the plans” is used in these specifications
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/maintenance/finalized/sp7150100.pdf?sfvrsn=6c3d31f7_1