796 search results for roundabout

E4X67-R0

AND ROUNDABOUT, 12" LF 50.000 0710- 11-125 PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID, , STANDARD, WHITE, SOLID, 12" FOR CROSSWALK AND ROUNDABOUT LF 50.000 0711- 11-124 THERMOPLASTIC

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2025/apr04/e4x67-r0.pdf?sfvrsn=1cb94792_1

E53D8

- 11-123 THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR CROSSWALK AND ROUNDABOUT LF 6,284.000 0711, THERMOPLASTIC, REFURBISHMENT, WHITE, SOLID, 12" FOR CROSS WALK OR ROUNDABOUT LF 20,457.000 0711- 12-124

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2025/aug05/e53d8.pdf?sfvrsn=9afee1cc_1

2026FDM231Lighting

and Roundabout Lighting New or Reconstruction 3.0 Std. 1.5 Min. 1.5 Std. 1.2 Min. 4:1 or Less 10:1, in the IESNA Design Guide for Roundabout Lighting (DG-19-08). When performing this calculation, the driver, 231 – Lighting 20 231.3.3 Roundabouts Provide lighting for roundabouts as required per FDM 213. The roundabout lighting criteria for new or reconstruction in Table 231.2.1 applies where, Use conventional corridor lighting criteria for roundabouts where pedestrian traffic

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm231lighting.pdf?sfvrsn=5a51e36f_5

ICE in PDE Training_July 2025

to a roundabout WHEN IS ICE APPLIED? 14 ICE required: • New intersection signalization • Major, • Minor Road Stop Control • All-Way Stop Control • Roundabout • Unsignalized RCUT • Unsignalized Thru-Cut Unsignalized Multi-Lane Roundabout – Manatee County, FL Minor Road Stop Control, Partial Cloverleaf B • Roundabout Unsignalized One-Lane Roundabout – Apopka, FL 21 Is ICE, Limit 40 Minor Street Speed Limit 30 Mini Roundabout Entry & Exit Speed Limit 20 1-Lane

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/module-2_3_v4_with-poll-questions.pdf?sfvrsn=aae14af6_3

E1W52-R0

GM2.000 0711- 11-123THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR CROSSWALK AND ROUNDABOUT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2023/nov02/e1w52-r0.pdf?sfvrsn=617526fe_1

E1W14-05-16

ROUNDABOUT Limits: 01030000 Project(s): 44195015201(*) Federal Aid No: N/A Total Roadway Length: 0.641, Description: The improvements under this Contract consist of roundabout construction, milling, - CONCRETE PAVEMENT LF 1,954.000 0350- 30- 13 CONCRETE PAVEMENT FOR ROUNDABOUT APRON, 12" DEPTH SY, EXTENSION LINE, 12" FOR ROUNDABOUT GM 0.035 0711- 11-160 THERMOPLASTIC, STANDARD, WHITE, MESSAGE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2024/may16/e1w14-05-16.pdf?sfvrsn=22b63c62_1

E1X40-R0

, 12" FOR CROSSWALK AND ROUNDABOUT LF 10,000.000 0711- 11-124 THERMOPLASTIC, STANDARD, WHITE, SOLID

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2024/sep19/e1x40-r0.pdf?sfvrsn=11d21730_1

Traffic Studies Scope of Services

- Future Conditions Analysis Task 4c - Roundabout Subtask 4c1 - Inventory Subtask 4c2, - Roundabout Inventory Task 27b - SIDRA Intersection Analysis Task 27c – Roundabout Benefit/Cost Analysis Task 27d - Roundabout Concept Development Task 28a - ICE Stage 1 Screening Task 28b, and/or roundabout studies, arterial coordination analysis, conceptual drawings of recommended, : ROUNDABOUT Subtask 4c1: INVENTORY The CONSULTANT shall be responsible for determining all input

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26136/traffic-studies-scope-of-services.docx?sfvrsn=de3b35e_1

Gov-Bd-Mtg-Minutes-11_01_2018-Meeting

, Sarasota/Manatee MPO, thanked FDOT for the roundabouts on State Road 64 and State Road 70 In her region. Mr. Nguyen added that roundabouts are a long-term cost saving and Mrs. Monroy added that roundabouts work even when there is no power. 9 E. TSM&O ON THE I -4 COR RIDOR Commissioner Vanessa

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2018/gov-bd-mtg-minutes-11_01_2018-meeting.pdf?sfvrsn=1b9ad098_1

2025FDM212Intersections

intersections include: (1) Converting to a roundabout. (2) Converting one or more legs to a one-way, and interchanges, and all approaches to roundabouts are often yield controlled. Refer to the Manual, signal or roundabout is warranted, but the installation is delayed. 212.2.4 Signal Control, for intersections, including mid-block crossings and roundabout approaches. For additional

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm212intersections.pdf?sfvrsn=5eeca16b_3

2026FDM212Intersections

intersections include: (1) Converting to a roundabout. (2) Converting one or more legs to a one-way, and interchanges and all approaches to roundabouts are often yield controlled. Refer to the Manual on Uniform, or roundabout is warranted, but the installation is delayed. 212.2.4 Signal Control Signalization, restrictions for intersections, including mid-block crossings and roundabout approaches. For additional

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm212intersections.pdf?sfvrsn=c405816a_3

Bulletin/Memorandum - 2015 to Present

Developmental Standard Plans, Index D102-690 (Temporary Traffic Control for Roundabouts) 5/14/21, 02-15Evaluation of Intersections for Roundabouts (FHWA Approved: 4/13/2015) 4/15/15 RDB15-06

https://www.fdot.gov/roadway/bulletin/default.shtm

2018FDM201DesignControls

affects:  Horizontal and vertical alignments  Lane widths and lane assignments  Roundabout, , roundabouts, multi-lane turns, directional median openings, ramps) the geometric design elements should

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2018/2018fdm201designcontrols.pdf?sfvrsn=a766b375_4

103014FinalStaffDirMtgMinutes

Plan. In addition, a modern roundabout must be considered for intersections. He stated, , than other speed control mechanisms such as roundabouts and road diets may be necessary

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2014/103014finalstaffdirmtgminutes.pdf?sfvrsn=859b5f7a_1

441693-1-SR5_Alternatives-Public-Workshop_Presentation

 Alternative 8 – Median U-Turn with Roundabout Coordination Meetings  Property Owners  IRC, -turn with Roundabout Alternatives Identified for Further Study SR 5 / US 1 at Aviation Boulevard, with Roundabout SR 5/US-1 Increased border width at R/W Provides canal maintenance area Northbound, at the roundabout 22 SR 5 / US 1 at Aviation Boulevard PD&E Study | FPID No: 441693-1-22-02 23 ALT E RNAT IVE 8 – Median U-Tu rn with Roundabout Aviation Blvd Lanes EB: 1- RT, 2-Thru Wide

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/sr5aviationblvdpde/441693-1-sr5_alternatives-public-workshop_presentation.pdf?sfvrsn=72078506_1

E56C3-R0

, SOLID FOR CROSSWALK AND ROUNDABOUT, 12" LF 100.000 0710- 11-124 PAINTED PAVEMENT MARKINGS, THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR CROSSWALK AND ROUNDABOUT LF 350.000 0711- 11-124, , REFURBISHMENT, WHITE, SOLID, 12" FOR CROSS WALK OR ROUNDABOUT- MAINTENANCE USE ONLY LF 500.000 Page 14 Bid

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2023/nov07/e56c3-r0.pdf?sfvrsn=e89505f4_1

E53D9-R0

FOR CROSSWALK AND ROUNDABOUT, 12" LF 100.000 0710- 11-124 PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR CROSSWALK AND ROUNDABOUT LF 2,000.000 0711- 11-124, , REFURBISHMENT, WHITE, SOLID, 12" FOR CROSS WALK OR ROUNDABOUT LF 6,192.000 0711- 12-124

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2025/jul01/e53d9-r0.pdf?sfvrsn=bbe9b528_1

County Road 510 Design Projects

How to Use a Roundabout – Click Here Design Project Segments At-a-Glance

https://www.fdot.gov/projects/cr510/county-road-510-design-projects
20 of 796 results