Environmental Resource Permit (erp) Case Studies

In 2025, the Florida Department of Transportation (FDOT) Office of Environmental Management’s Environmental Review & Analysis Section and Roadway Design Office’s Drainage Design Section conducted a joint pilot study to evaluate impacts of the ratified 2024 Environmental Resource Permit (ERP) water quality performance standards to evaluate its potential impacts to the work program.

Nine grandfathered Project Development & Environment (PD&E) Studies throughout the state, and in most Water Management Districts, were chosen to provide a comparison to the previous water quality performance standards (i.e. first flush criteria) to the new 2024 water quality performance standards (i.e. nutrient loading criteria). The analysis herein was scoped to provide a sufficient level of detail that is expected before the permit application phase (e.g. Phase 1 or 45% Submittal), noting the same level of detail may not be appropriate for all PD&E projects. The level of detail needed during PD&E Phase is dependent upon project-specific needs (e.g. PD&E Phase straight to Phased Design-Build vs. Traditional project phasing).

The opinions and conclusions expressed or implied within these reports are those of the consultants who conducted the pilot study and are not necessarily those of FDOT. These technical memorandums are provided for informational purposes only and should not be considered authoritative for establishment of FDOT criteria or standards, project scoping, staff hour estimates, or reasonable assurances for applicable ERP criteria.

Summary Memo:

 Summary of Findings - New Stormwater Rule Evaluation of Nine (9) Project Development and Environment (PD&E) Studies.

Project 1

Project located on Cove Road from State Road (SR) 76 (Kanner Highway) to SR 5 (US 1, Federal Highway) in Martin County.

Project 2

Project located on SR 8 (I-10) from SR 281 (Avalon Blvd.) to the Okaloosa County Line in Santa Rosa County and from the Santa Rosa County Line to Log Lake Rd. in Okaloosa County.

Project 3

Project located on I-95/SR 9 from south of SR 860/Miami Gardens Drive to north of the Broward County Line in Miami-Dade County.

Project 4

Project located on the existing SR 16 roadway corridor, between International Golf Parkway and I-95 in St. Johns County.

Project 5

Project located on State Road (S.R.) 20 (Blountstown Highway)/S.R. 366 (Pensacola Street) in Tallahassee, Leon County./p>

Project 6

Project located on SR 45 (US 41) from Kracker Avenue to south of SR 676 (Causeway Boulevard) in Hillsborough County.

Project 7

This project is located at the intersection of US Highway 41/State Road 45 (US 41/SR 45) and State Road 54 (SR 54) in Pasco County.

Project 8

Project located on SR 544 (Lucerne Park Road) from Martin Luther King Boulevard to SR 17 in Polk County.

Project 9

This project is located on State Road (SR) 30 (US 98) from County Road (CR) 30A to West of Phillips Inlet Bridge in Walton County.