Design Build Specifications - January - June 2019


Design-Build Boiler-Plate

January - June 2019


Design-Build Boilerplate* is the Division I Master Document to be used in the Request for Proposal (RFP) for Design-Build projects.


Design Build Pick-List

NOTE: The files below contain optional text which may be incorporated into
the Design-Build Boilerplate to create specific Contract language.

FileTitleUsage Notes
To Change Award and Execution Time
SP0030200Award and Execution of ContractWhen necessary to change standard "Award and Execution"
Design Build Finance
SP0030600DBFExecution of Contract and BondUse on Design Build Finance projects
Award and Execution of Contract - Public Records
SP0030900D1-119Public RecordsAll Projects in District 1
SP0030900D2-119Public RecordsAll Projects in District 2
SP0030900D3-119Public RecordsAll Projects in District 3
SP0030900D4-119Public RecordsAll Projects in District 4
SP0030900D5-119Public RecordsAll Projects in District 5
SP0030900D6-119Public RecordsAll Projects in District 6
SP0030900D7-119Public RecordsAll Projects in District 7
SP0070201TP-119Public RecordsAll Turnpike Enterprise Projects
Structures Over 1500 Feet in Length (over water)
SP0050901 InspectionLong bridge jobs (1500 feet or longer); modify to suit
Legal Requirements and Responsibility to the Public-Laws to be observed-Compliance with Federal Endangered Species Act and other Wildlife Regulations
SP0070104-1BearUse when called for by the District Enviromental Permit Office
SP0070104-2EagleUse when called for by the District Enviromental Permit Office
SP0070104-3GopherUse when called for by the District Enviromental Permit Office
SP0070104-4ManateesUse when called for by the District Enviromental Permit Office
SP0070104-5SawfishUse when called for by the District Enviromental Permit Office
SP0070104-6 Sea TurtleUse when called for by the District Enviromental Permit Office
SP0070104-7Indigo SnakeUse when called for by the District Enviromental Permit Office
SP0070104-8SturgeonUse when called for by the District Enviromental Permit Office
Toll Facility
SP0070201TP-119 Permits and Licenses (No free passes will be issued to the Contractor for use on the Toll Facility)All Jobs with Toll Facilities.
Toll Facility
SP0071101-tollsPreservation of Property for Toll Facilities.Use with approval of the District Traffic Operations Engineer.
Operations Within Railroad Right-of-Way
SP0071104RROperations within Railroad Right-of-WayUse on Projects involving CSX Transportation, FEC, South Florida Rail Corridor and the Central Florida Rail Corridor.
Utilities - Florida Gas Transmission Company
SP0071105FGTProjects Involving Florida Gas Transmission CompanyUse on Projects involving Florida Gas Transmission Company (FGT).
SP0071201FGTDBProjects Involving Florida Gas Transmission Company with Encroachment AgreementsUse on Projects involving Florida Gas Transmission Company (FGT) with Encroachment Agreements. Must be used with SP0071105FGT.
Legal Requirements and Responsibility to the Public
SP0072700 Equal Employment Opportunity RequirementsAll Non-Federal Aid Projects
SP0072800 Preference to State ResidentsAll Non-Federal Aid Projects
SP0072900 Legal Requirements and Responsibility to the Public - E-VerifyAll Projects
SP0073000 Legal Requirements and Responsibility to the Public - Scrutinized CompaniesAll Projects
SP0073100 Legal Requirements and Responsibility to the Public - Title VI Assurance - DOT 1050.2A, Appendix A and Appendix EAll Federal Aid Projects
Liquidated Damages for Tolls
SP0081000Prosecution and Progress - Amount of Liquidated DamagesUse on revenue producing projects.
Partnering
SP0080306Prosecution of Work - Partnering999-16
Disputes Review Board
SP0080307RDRBRegional Disputes Review BoardJobs without Pay Item No. 999-20
Jobs with Lighting
SP0080409Contaminated Material - Mercury-Containing Devices and LampsJobs with lighting.
Damage Recovery
SP0081200Prosecution and Progress-Damage RecoveryUse when requested by the District Construction Engineer.
Alternative Bidding
SP0081300AProsecution and ProgressAll Jobs with Alternative Bidding. Use with the approval of the District Construction Engineer.
SP0081300B"Bonus" Payment and Waiver of Contractor Claims - Date SpecificBonus (Date Specific) Use with the approval of the District Construction Engineer.
SP0081300BCD"Bonus" Payment and Waiver of Contractor Claims - Calendar DayBonus (Calendar Days) Use with the approval of the District Construction Engineer.
SP0081300IDIncentive - Disincentive Incentive - Disincentive. Use with the approval of the District Construction Engineer.
SP0081300LQSLiquidated Savings for Early CompletionLiquidated Savings. Use with the approval of the District Construction Engineer.
SP0081300MB"Bonus" Payment and Waiver of Contractor Claims - MilestoneMilestone Bonus. Use with the approval of the District Construction Engineer. Do not use with SP00813000B or SP0081300BCD.
SP0081300MIDIncentive - Disincentive - MilestoneMilestone Incentive - Disincentive. Use with the approval of the District Construction Engineer.. Do not use with SP0081300ID)

 

 

Design Build Attachments to the RFP

 

DIVISION II CHANGES
SP1010000DBMobilizationUse on all Design Build Projects.
SP1050813DBContractor Quality Control General RequirementsUse when Geotechnical Services are required for the project.
SP4550000DBStructures FoundationsUse when Geotechnical Services are required for the project.
VALUE ADDED DEVELOPMENTAL SPECS
Dev475-115Value Added Bridge ComponentsUse when requested and approved by the District Construction Engineer.