1 | Local Agency Program (LAP) Agreement (6-23-14) Local Agency Program (LAP) Agreement (6-23-14) – This is an agreement between FIU and FDOT that
is prepared in advance of requesting Federal-Aid Authorization for the LAP project. | 1.38 MB |
2 | TIGER Agreement (6-5-14) TIGER Agreement (6-5-14) – This is the agreement between US DOT (FHWA) and FDOT that outlines the terms and conditions
for the federal TIGER grant “University City Prosperity Project.” | 1.01 MB |
3 | TIGER Agreement Addendum 1 (1-12-16) TIGER Agreement Addendum 1 (1-12-16) – This amendment to the TIGER agreement between US DOT,
FHWA, FIU and FDOT modified the scope, schedule and budget for the University City Prosperity Project. | 709 KB |
4 | TIGER Agreement Addendum 2 (12-11-17) TIGER Agreement Addendum 2 (12-11-17) – This amendment to the TIGER agreement between US
DOT, FHWA, FIU and FDOT modified the scope and schedule for the University City Prosperity Project. | 621 KB |
5 | Perpetual Easement (4-10-17) Perpetual Easement (4-10-17) – This document provides an easement from FDOT to FIU for inspection and maintenance
of the public pedestrian bridge. | 509 KB |
6 | MCM+FIGG Proposal for FIU Pedestrian Bridge (9-30-15) MCM+FIGG Proposal for FIU Pedestrian Bridge (9-30-15)
– This is the technical proposal by MCM and FIGG to the FIU Selection Committee to design and build the pedestrian bridge project (BT-904). | 64.8 MB |
7 | General Use Permit for Bridge Movement (12-12-17) General Use Permit for Bridge Movement (12-12-17) – This permit (2017-K-690-095),
issued by FDOT, authorizes Dwight Dempsey of FIGG to move the precast concrete bridge main span to the final position over SW 8th Street. It includes the bridge movement plan. | 4.42 MB |
8 | FIU Pre-Proposal Meeting (9-16-14) FIU Pre-Proposal Meeting (9-16-14) – This is the PowerPoint presentation for a FIU Pre-Proposal
meeting that provided an overview of the University City Prosperity Project. | 7.7 MB |
9 | LAP Certification LAP Certification (1-5-18) – This is a checklist that FIU certified to FDOT for conditions for Right of Way. | 83 KB |
10 | FIU-University City Prosperity Project — Pedestrian Bridge Design Criteria FIU-University City Prosperity
Project – Pedestrian Bridge Design Criteria (April 2015 Revision) – Prepared by TYLIN International, this document outlines requirements and criteria to be used by the FIU pedestrian bridge selection committee to evaluate
proposals. | 5.82 MB |
11 | FIU Pylon Location Meeting Meeting regarding an additional through lane needed on the north side of SW 8th Street for a future
bus lane for MDT. | 202 KB |
12 | MCM blanket request for two lane road closure approval on SW 8th Request by MCM for blanket two-lane
closure approval on SW 8th Street as needed from January through April – This document reflects FDOT providing the FIU design build team the ability to close two lanes of SW 8th Street as needed for construction activities. | 635 KB |
13 | 100% plans for FIU Pedestrian Bridge signed and sealed by Engineer of Record. 100% plans for FIU Pedestrian
Bridge signed and sealed by Engineer of Record. | 19.5 MB |
----------------------------------- *Updated on May 6, 2019 -----------------------------------
|
14 | Meeting Minutes dated March 15, 2018 | 2.70 MB |
15 | CSW Pre-Construction Conference Minutes dated December 12, 2017 | 254 KB |
16 | Exhibit "A" Scope of Service (FDOT's contractor from AECOM job description for the In-House Project Management Support Services for LAP Agreement
Projects) | 67 KB |
17 | Any documentation with the words “cracks,” and/or “cracking,” and “FIU,” or “Florida International University,” and “bridge,” or “pedestrian.” *This
is an Outlook data file (.PST) and can only be added and accessed in Outlook as a data file. | 114 MB |
*NOTE The following list contains public records requests submitted to the FDOT. FDOT searched for the requested records and did not find anything responsive. a. Any documentation expressing concern from any related party and the design of the bridge or cracks. b. Copies of any and all inspections done by the FDOT and/or any other reporting entity. c. Any documentation of violations during this project. |