District 1 SB Contracts
| Contract Number: | |
| Financial Project ID: | 451360-1 |
| Type: | Construction |
| Estimate: | $1,212,661 |
| Letting Date/Response Date: | 7/29/2026 |
| Funding Source: | Federal |
| Description/Work Detail: | MEDIAN MODIFICATION |
| Location: | SR 776 AT OCEANSPRAY BLVD |
| Major Type (if available): | |
| Minor Type (if available): | |
| Project Manager (if available): | Sam St Hilaire 863-519-2554 |
| Contract Number: | |
| Financial Project ID: | 448030-1 |
| Type: | Construction |
| Estimate: | $1,123,040 |
| Letting Date/Response Date: | Letting 10/28/2026 |
| Funding Source: | Federal |
| Description/Work Detail: | SIDEWALK |
| Location: | CENTRAL ELEMENTARY - SRTS |
| Major Type (if available): | |
| Minor Type (if available): | |
| Project Manager (if available): | Jeff Jones (239) 225-1920 |
| Contract Number: | |
| Financial Project ID: | 425843-3 |
| Type: | Construction |
| Estimate: | $1,234,800 |
| Letting Date/Response Date: | Letting 11/5/2026 |
| Funding Source: | State |
| Description/Work Detail: | LANDSCAPING |
| Location: | I-75 (SR 93) AT SR 951 (COLLIER BLVD INTERCHANGE) |
| Major Type (if available): | |
| Minor Type (if available): | |
| Project Manager (if available): | Darryl Richard 239-240-7090 |
| Contract Number: | |
| Financial Project ID: | 449681-1 and Goes-With project 449683-1 |
| Type: | Construction |
| Estimate: | $1,713,191 + Goes-With $736,320 |
| Letting Date/Response Date: | Letting 1/27/2027 |
| Funding Source: | Federal |
| Description/Work Detail: | Sidewalk |
| Location: | VIA COCONUT POINT ROUNDABOUT FROM COCONUT RD TO CORKSCREW RD Goes-With COCONUT RD SIDEWALK FROM OAKWILD TO VIA COCONUT POINT |
| Major Type (if available): | |
| Minor Type (if available): | |
| Project Manager (if available): | Jeff Jones (239) 225-1920 |
| Contract Number: | |
| Financial Project ID: | 445296-4 |
| Type: | Construction |
| Estimate: | $1,440,600 |
| Letting Date/Response Date: | Letting 2/18/2027 |
| Funding Source: | State |
| Description/Work Detail: | Landscape |
| Location: | SR93 AT PINE RIDGE RD INTERCHANGE |
| Major Type (if available): | |
| Minor Type (if available): | |
| Project Manager (if available): | Darryl Richard 239-240-7090 |
Expand all
Collapse all
District 2 SB Contracts
Contract Number: E21R6-R0
Financial Project ID: 44422537201
Type: Maintenance
Estimate: $185,194
Letting/Response Date: 06/10/2026
Funding Source: State
Description/Work Detail: Concrete Repair
Location: St. John's County
Project Manager: Ian Middlemas
Expand all
Collapse all
District 3 SB Contracts
| Contract Number: | 27361 |
| Financial Project ID: | 45315116201, 45315116202 |
| Type (Const/Maintenance/Prof Serv) | Professional Services |
| Estimate: | $983,695 |
| Letting Date/Response Date: | 7/6/2026 |
| Funding Source (State/Federal): | State/Federal |
| Description/Work Detail: | CEI SR 10 (US 90) from End of 4 Lane in Grandridge to Apalachicola River Bridge |
| Location: | Calhoun County |
| Major Type (if available): | 10.1 |
| Minor Type (if available): | |
| Project Manager (if available): | Lucas Corbin |
| Contract Number: | |
| Financial Project ID: | 45699115201 |
| Type: | Construction |
| Estimate: | $308,700 |
| Letting Date/Response Date: | 7/9/2026 |
| Funding Source: | State |
| Description/Work Detail: | Walton County Park and Ride |
| Location: | Walton County |
| Major Type (if available): | Landscaping |
| Project Manager (if available): | Eric McCormick |
| Contract Number: | 27322a |
| Financial Project ID: | 45659013201 |
| Type: | Professional Services |
| Estimate: | $1,033,000 |
| Letting Date/Response Date: | 7/20/2026 |
| Funding Source: | Federal |
| Description/Work Detail: | Design SR 77 from SR 30 (US 98B) to Bay Line Railroad |
| Location: | Bay County |
| Major Type (if available): | 3.1 |
| Minor Type (if available): | 4.1.2, 5.4, 7.1, 7.2, 7.3, 8.1, 8.2, 8.3, 9.1 |
| Project Manager (if available): | Blake Angerbrandt |
| Contract Number: | 27322b |
| Financial Project ID: | 45704713201 |
| Type (Const/Maintenance/Prof Serv) | Professional Services |
| Estimate: | $1,073,000 |
| Letting Date/Response Date: | 7/20/2026 |
| Funding Source (State/Federal) | Federal |
| Description/Work Detail | Design SR 77 from 4th Street to North of Liberty Avenue |
| Location | Bay County |
| Major Type (if available) | 3.1 |
| Minor Type (if available) | 4.1.2, 5.4, 7.1, 7.2, 7.3, 8.1, 8.2, 8.3, 9.1 |
| Project Manager (if available) | Blake Angerbrandt |
| Contract Number: | 27352 |
| Financial Project ID: | 45293316201, 45294316201 |
| Type (Const/Maintenance/Prof Serv) | Professional Services |
| Estimate: | $638,822 |
| Letting Date/Response Date: | 8/24/2026 |
| Funding Source (State/Federal) | State/Federal |
| Description/Work Detail | CEI Group 27-G – SR 75 (US 231) from South of SR 10 (US 90) to End of Curb and Gutter and SR 2 from Spring Branch to East of Cowart’s Creek |
| Location | Jackson County |
| Major Type (if available) | 10.1 |
| Minor Type (if available) | |
| Project Manager (if available) | Eric Wells |
| Contract Number: | |
| Financial Project ID: | 42378147214 |
| Type (Const/Maintenance/Prof Serv) | Maintenance |
| Estimate: | $200,000 |
| Letting Date/Response Date: | 9/10/2026 |
| Funding Source (State/Federal) | State |
| Description/Work Detail | Roadway Debris Removal on SR 8 (I-10) and SR 83 (US 331) |
| Location | Holmes and Walton Counties |
| Major Type (if available) | Debris Removal |
| Project Manager (if available) | Eric Rosnick |
| Contract Number: | |
| Financial Project ID: | 45698515201 |
| Type (Const/Maintenance/Prof Serv) | Construction |
| Estimate: | $308,700 |
| Letting Date/Response Date: | 11/12/2026 |
| Funding Source (State/Federal) | State |
| Description/Work Detail | Holmes County Park and Ride |
| Location | Holmes County |
| Major Type (if available) | Landscaping |
| Project Manager (if available) | Eric McCormick |
| Contract Number: | |
| Financial Project ID: | 45775715201 |
| Type: | Construction |
| Estimate: | $360,150 |
| Letting Date/Response Date: | 11/12/2026 |
| Funding Source: | State |
| Description/Work Detail: | SR 77 from CR 77A State Park Rd to S of Nearing Hills Rd |
| Location: | Washington County |
| Major Type (if available): | Landscaping |
| Project Manager (if available): | Eric McCormick |
| Contract Number: | 27310a |
| Financial Project ID: | 44759023201 |
| Type (Const/Maintenance/Prof Serv) | Professional Services |
| Estimate: | $1,024,600 |
| Letting Date/Response Date: | 11/23/2026 |
| Funding Source (State/Federal) | State |
| Description/Work Detail | Design SR 87 from Technology Avenue to SR 10 (US 90) |
| Location | Santa Rosa County |
| Major Type (if available) | 3.1 |
| Minor Type (if available) | 4.1.2, 5.4, 7.1, 7.2, 7.3, 8.1, 8.2, 8.3, 9.1 |
| Project Manager (if available) | Travis Miller |
| Contract Number: | 27310b |
| Financial Project ID: | 45659213201 |
| Type (Const/Maintenance/Prof Serv) | Professional Services |
| Estimate: | $1,012,500 |
| Letting Date/Response Date: | 11/23/2026 |
| Funding Source (State/Federal) | State |
| Description/Work Detail | Design SR 30 (US 98) from SR 295 (Navy Boulevard) to SR 292 (Pace Boulevard) |
| Location | Escambia County |
| Major Type (if available) | 3.1 |
| Minor Type (if available) | 4.1.2, 5.4, 7.1, 7.2, 7.3, 8.1, 8.2, 8.3, 9.1 |
| Project Manager (if available) | Adam Bass |
| Contract Number: | 27354 |
| Financial Project ID: | 45293516201, 45294416201 |
| Type (Const/Maintenance/Prof Serv): | Professional Services |
| Estimate: | $1,181,128 |
| Letting Date/Response Date: | 11/30/2026 |
| Funding Source (State/Federal): | State |
| Description/Work Detail: | CEI Group 27-M – SR 89 from SR 4 to Alabama State Line and SR 89 from CR 178 to SR 4 |
| Location: | Santa Rosa County |
| Major Type (if available): | 10.1 |
| Minor Type (if available): | |
| Project Manager (if available): | David Carbajal |
| Contract Number: | |
| Financial Project ID: | 45523515201 |
| Type (Const/Maintenance/Prof Serv): | Construction |
| Estimate: | $555,594 |
| Letting Date/Response Date: | 12/2/2026 |
| Funding Source (State/Federal): | State |
| Description/Work Detail: | Veteran’s Park Sidewalk from the Bristol Library to Veteran’s Park Gate |
| Location: | Liberty County |
| Major Type (if available): | Sidewalk |
| Minor Type (if available): | |
| Project Manager (if available): |
| Contract Number: | |
| Financial Project ID: | 45775815201 |
| Type (Const/Maintenance/Prof Serv): | Construction |
| Estimate: | $308,700 |
| Letting Date/Response Date: | 1/14/2027 |
| Funding Source (State/Federal): | State |
| Description/Work Detail: | Bay County Park and Ride |
| Location: | Bay County |
| Major Type (if available): | Landscaping |
| Project Manager (if available): | Jenny Hammond |
| Contract Number: | |
| Financial Project ID: | 45775325201 |
| Type (Const/Maintenance/Prof Serv): | Construction |
| Estimate: | $771,750 |
| Letting Date/Response Date: | 01/14/2027 |
| Funding Source (State/Federal): | State |
| Description/Work Detail: | SR 10 (US 90) West of Woodsview Drive to SR 71 North |
| Location: | Jackson County |
| Major Type (if available): | Landscaping |
| Project Manager (if available): | Jenny Hammond |
| Contract Number: | |
| Financial Project ID: | 45695815201 |
| Type (Const/Maintenance/Prof Serv): | Construction |
| Estimate: | $771,750 |
| Letting Date/Response Date: | 2/11/2027 |
| Funding Source (State/Federal): | State |
| Description/Work Detail: | SR 8 (I-10) Interchange at CR 286 (Blueberry Drive) |
| Location: | Jackson |
| Major Type (if available): | Landscaping |
| Project Manager (if available): | Jenny Hammond |
| Contract Number: | |
| Financial Project ID: | 42378147215 |
| Type (Const/Maintenance/Prof Serv) | Maintenance |
| Estimate: | $600,000 |
| Letting Date/Response Date: | 4/8/2027 |
| Funding Source (State/Federal) | State |
| Description/Work Detail | WDD Miscellaneous Concrete Repair |
| Location | Gadsden and Leon Counties |
| Major Type (if available) | Concrete Repair |
| Project Manager (if available) | Jeff Kerwin |
| Contract Number: | 27366 |
| Financial Project ID: | 45258233201 |
| Type (Const/Maintenance/Prof Serv) | Professional Services |
| Estimate: | $1,500,000 |
| Letting Date/Response Date: | 4/13/2027 |
| Funding Source (State/Federal) | State |
| Description/Work Detail | Districtwide Traffic Operations Studies Consultant |
| Location | Districtwide |
| Major Type (if available) | 6.1 |
| Minor Type (if available) | 3.1 |
| Project Manager (if available) | Tammy Melchi |
| Contract Number: | |
| Financial Project ID: | 45387025201 |
| Type (Const/Maintenance/Prof Serv): | Construction |
| Estimate: | $261,000 |
| Letting Date/Response Date: | 5/13/2027 |
| Funding Source (State/Federal): | State |
| Description/Work Detail: | SR 75 (US 231) Jackson County Welcome Center Recreational Area |
| Location: | Jackson County |
| Major Type (if available): | Other - Rest Area Themes and Playgrounds |
| Minor Type (if available): | |
| Project Manager (if available): | Lucas Corbin |
Expand all
Collapse all
District 4 SB Contracts
Ad #: 27419
FM Number: 448043.4.32
Project Manager: Evans Bain
Project Description: Continuing Services for Surveying, Mapping & SUE
Estimate: $3,000,000
Response Date: June 22, 2026
FM Number: 449832-1-52-01
Project Manager: Joe Marzi
Project Description: SR-5/S FEDERAL HWY Resurfacing FROM SR-5/US-1/N DIXIE HWY TO 10TH AVENUE S
County: Palm Beach
Fund Type: ACNT/DDR
Estimate: $1,099,238
Letting Date: July 29, 2026
Description: Broward Tree Trimming
County: Broward
Project Manager: Chanel
Renewal/Letting Date: July 30, 2026
Budget Amt (PDC): $300,000
Fund Type: D
Vendor Name/Contract Number: E4Y09 - Smiley Interior Renovations Co
| FM #: 424266-9-72-01 |
| Description: Broward Shoulder Repair |
| County: Broward |
| Project Manager: Chanel |
| Renewal/Letting Date: August 7, 2026 |
| Budget Amt (PDC): $125,000 |
| Fund Type: D |
| Vendor Name/Contract Number: TBD |
Ad #: 27427
FM Number: 447546.1.62 & 447675.1.62
Project Manager: Hyacinth Williams
Project Description: SR-816/Oakland Park Blvd. at NW 31st Avenue & SR-816/Oakland Park Blvd. from Rock Island Road to East of NW 31st Avenue
Estimate: $1,366,650
Response Date: August 24, 2026
Description: Treasure Coast Shoulder Repair\Redress
County: Treasure Coast
Project Manager: Kehres
Renewal/Letting Date: 09/02/2026
Budget Amt (PDC): $400,000
Fund Type: D
Vendor Name/Contract Number: E4Y16 - T & M Lawn-Fence Service Inc.
Ad #: 27407
FM Number: 449834.1.62
Project Manager: Hyacinth Williams
Project Description: SR-717/ E Canal Street from SR-80 to SE Ave E.
Estimate: $592,654
Response Date: October 26, 2026
| -FM Number: 451043-1-52-01 |
| -Project Manager: Dani Goodwin |
| -Project Description: LANDSCAPING OF I-95/SR-9 AND COPANS ROAD INTERCHANGE |
| -County: Broward |
| -Fund Type: DDR |
| -Estimate: $1,316,718 |
| -Letting Date: January 8, 2027 |
| FM #: 233935-9-72-01 |
| Description: Broward Handrails |
| County: Broward |
| Project Manager: Chanel |
| Renewal/Letting Date: January 16, 2027 |
| Budget Amt (PDC): $100,000 |
| Fund Type: D |
| Vendor Name/Contract Number: E4X84 — Highstyle Engineering |
Description: Palm Beach Tree Trimming NEW 2025
County: Palm Beach
Project Manager: Blakeney
Renewal/Letting Date: 02/21/2027
Budget Amt (PDC): $200,000
Fund Type: D
Vendor Name/Contract Number: E4X72 - Salgado Tree Trimming LLC
| FM #: 439780-3-72-01 |
| Description: Broward Misc. Road Concrete |
| County: Broward |
| Project Manager: Chanel |
| Renewal/Letting Date: 03/06/2027 |
| Budget Amt (PDC): $500,000 |
| Fund Type: D |
| Vendor Name/Contract Number: E4X32-Leon America |
| FM #: 438991-5-72-01 |
| Description: Broward Clearing & Grubbing |
| County: Broward |
| Project Manager: Chanel |
| Renewal/Letting Date: 04/11/2027 |
| Budget Amt (PDC): $50,000 |
| Fund Type: D |
| Vendor Name/Contract Number: E4X71-TTC Environmental Inc |
| FM #:436223-5-72-01 |
| Description: Wildflower, Install & Maintain |
| County: Districtwide (TCOPS) |
| Project Manager: Edwards |
| Renewal/Letting Date: 06/25/2027 |
| Budget Amt (PDC): $125,000 |
| Fund Type: D |
| Vendor Name/Contract Number: E4X87 — T & M Lawn-Fence Service Inc |
Description: Palm Beach Herbicide NEW 2025
County: Palm Beach
Project Manager: Blakeney
Renewal/Letting Date: 06/26/2027
Budget Amt (PDC): $75,000
Fund Type: D
Vendor Name/Contract Number: E4Y04 - T&M Lawn Fence Service Inc
Expand all
Collapse all
District 5 SB Contracts
| Contract #: | |
| Financial Project ID: | 447084-1-52-01 |
| Type | Construction |
| Estimate: | $1,910,959 |
| Letting Date: | 7/7/2026 |
| Funding Source: | State |
| Description/Work Detail: | PAVEMENT ONLY RESURFACE (FLEX) |
| Location: | VOLUSIA COUNTY / SR 15 FROM E 4TH AVE TO PALMETTO AVE |
| Major Type: |
| Contract #: | |
| Financial Project ID: | 451372-1-52-01 |
| Type | Construction |
| Estimate: | $2,606,195 |
| Letting Date: | 10/28/2026 |
| Funding Source: | State |
| Description/Work Detail: | SAFETY PROJECT |
| Location: | ORANGE COUNTY / SR 438 FROM LAKE STANLEY RD TO HIAWASSEE RD |
| Contract #: | |
| Financial Project ID: | 452635-1-52-01 |
| Type | Construction |
| Estimate: | $1,066,852 |
| Letting Date: | 12/1/2026 |
| Funding Source: | State |
| Description/Work Detail: | PAVEMENT ONLY RESURFACE (FLEX) |
| Location: | MARION COUNTY / SR 25/SR 200 (US 27/US 301/US 441) FROM SW 10TH ST TO SW 4TH ST |
| Contract #: | |
| Financial Project ID: | 451256-1-52-01 |
| Type | Construction |
| Estimate: | $1,422,002 |
| Letting Date: | 12/2/2026 |
| Funding Source: | State |
| Description/Work Detail: | SAFETY PROJECT |
| Location: | ORANGE COUNTY / SR 436 (SEMORAN BLVD) AT UNIVERSITY BLVD/SCARLET RD |
| Contract #: | |
| Financial Project ID: | 451246-1-52-01 |
| Type | Construction |
| Estimate: | $1,292,288 |
| Letting Date: | 2/24/2027 |
| Funding Source: | State |
| Description/Work Detail: | SAFETY PROJECT |
| Location: | ORANGE COUNTY / SR 435 AT CR 526 (OLD WINTER GARDEN RD) |
| Contract #: | |
| Financial Project ID: | 452642-1-52-01 / 452642-2-52-01 |
| Type | Construction |
| Estimate: | $1,526,600 |
| Letting Date: | 4/6/2027 |
| Funding Source: | State |
| Description/Work Detail: | PAVEMENT ONLY RESURFACE (FLEX)/ INTERSECTION IMPROVEMENT |
| Location: | LAKE COUNTY / SR 19 FROM LAKEVIEW AVE TO CR 48 |
| Contract #: | |
| Financial Project ID: | 451245-1-52-01 |
| Type | Construction |
| Estimate: | $1,448,272 |
| Letting Date: | 6/9/2027 |
| Funding Source: | State |
| Description/Work Detail: | SAFETY PROJECT |
| Location: | ORANGE COUNTY / SR 434 (ALAFAYA TRAIL) AT LOKANOTOSA TRAIL/SCIENCE DRIVE |
Expand all
Collapse all
District 7 SB Contracts
Expand all
Collapse all
TP SB Contracts
| Contract Number: | E8W74-R0 |
| Financial Project ID: | 453763-1-52-01 |
| Estimate (Budget Amount): | $450,000.00 |
| Letting Date/Response Date: | 06/09/2026 |
| Funding Source (State/Federal) | State |
| Description/Work Detail | Shoulder Improvements |
| Location | SR 91 |
| Contract Number: | 27814 |
| Financial Project ID: | 451008-1 |
| Type: | Professional Services |
| Estimate: | $3,200,000.00 |
| Letting Date/Response Date: | 1/26/2027 |
| Funding Source: | State |
| Description/Work Detail | FT DRUM SERVICE PLAZA PARKING IMPROVEMENTS (MP 185) OKEECHOBEE COUNTY |
| Location | |
| Major Type (if available) | 3.3 |
| Minor Type (if available) | 2.0, 3.1, 3.2, 4.1.1, 6.3.1, 6.3.2, 6.3.3, 7.1, 7.2, 8.1, 8.2, 9.1, 15.0 |
| Project Manager (if available) |
| Contract Number: | 27812 |
| Financial Project ID: | 449712-1 |
| Type: | Professional Services |
| Estimate: | $2,300,000.00 |
| Letting Date/Response Date: | 1/26/2027 |
| Funding Source: | State |
| Description/Work Detail: | PSL/FTP SERVICE PLAZA PARKING IMPROVEMENTS (MP 144) |
| Location : | |
| Major Type (if available): | 3.3 |
| Minor Type (if available): | 2.0, 3.1, 3.2, 4.1.1, 6.3.1, 6.3.2, 6.3.3, 7.1, 7.2, 8.1, 8.2, 9.1, 15.0 |
| Project Manager (if available): | Latesa Turner |
| Contract Number: | 27813 |
| Financial Project ID: | 449713-1 |
| Type: | Professional Services |
| Estimate: | $3,300,000.00 |
| Letting Date/Response Date: | 1/26/2027 |
| Funding Source: | State |
| Description/Work Detail: | POMPANO SERVICE PLAZA PARKING IMPROVEMENTS (MP 65) |
| Location: | |
| Major Type (if available): | 3.3 |
| Minor Type (if available): | 2.0, 3.1, 3.2, 4.1.1, 6.3.1, 6.3.2, 6.3.3, 7.1, 7.2, 8.1, 8.2, 9.1, 15.0 |
| Project Manager (if available): | Latesa Turner |
For additional information, please e-mail: [email protected]