Orange Blossom Trail Enhancement Project
Completed October 2023
The Orange Blossom Trail (OBT) (US 441) pedestrian safety project implemented a coordinated package of improvements along a nearly 1-mile, 6-lane divided arterial. Click here for the project poster.
Improvements included:
- 3 new midblock crossings with pedestrian hybrid beacons (PHBs)
- Upgrades to 3 existing PHB crossings
- Raised crosswalks with in-pavement lighting
- Pedestrian warning pavement markings
- Median fencing
- Lane narrowing
- Enhanced lighting and landscaping
- Speed feedback and no right turn signage
- Posted speed limit reduction from 40 to 30 mph
Following implementation:
- Pedestrian use of designated crosswalks increased from 34.4% to 75.2%
- PHB activation at existing crossings increased from 71% to 84% (US 441 Report, 11-27-2024)
- Pedestrian and Bicycle crashes across OBT decreased by 70%
- Vehicle speeds also declined following project completion