3009 search results for intersection

19-10-Kuhlow-MultilaneRoundaboutDesign

2 Roundabouts Review FDM 11 6 Alternative Intersection and Interchange Review • All proposed Alternative Intersection and Interchange designs require a detailed review early and throughout

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2025-june/19-10-kuhlow-multilaneroundaboutdesign.pdf?sfvrsn=46f71a34_1

19-10-Bostian-D4MajorProjectsUpdates

of Existing Bridge 22 Hybrid Phased Construction • Pre-Detour - intersection improvements, ITS, relative to fully phased 21 22 6/30/2025 12 23 • Intersection improvements along detour route

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2025-june/19-10-bostian-d4majorprojectsupdates.pdf?sfvrsn=6e5d9525_1

711-003FHWA-Approved

-Way Arrow (Place Arrow at the 8 6 711-003 INTERCHANGE MARKINGS 11/01/21 TYPICAL INTERSECTION, INTERSECTION NOTE: Post delineators should not be discontinued in sections with guardrail. 300'-0". All

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/711-003fhwa-approved.pdf?sfvrsn=2bb71fb6_1

PublicHearing_LAKE COUNTY_Summary

for Project 450581-1 $5,219,158 450584-1 - SR 44 / MAIN ST / SR 500 AT INTERSECTION CR 473 (CREEK RD, TO VOLUSIA COUNTY LINE Type of Work: INTERSECTION IMPROVEMENT Phase Funding Source 2026 2027 2028 2029

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_lake-county_summaryb133db5e-4c76-4870-9313-05ac325e157f.pdf?sfvrsn=1c93ace6_2

E1Y08-R0BidTabs

, INTERSECTION 25.000 ED 25.00000 625.00 30.00000 750.00 243.00000 6,075.00 0015 0210 1 9 REWORKING, AND MAINTENANCE, INTERSECTION 25.000 ED 71.09000 1,777.25 0015 0210 1 9 REWORKING LIMEROCK BASE, 3" 100.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/bidtabs/2025/sep18/e1y08-r0bidtabs.pdf?sfvrsn=ae1e5428_1

711-003FHWAApproved

TYPICAL INTERSECTION NOTE: Post delineators should not be discontinued in sections with guardrail, TYPICAL INTERSECTION NOTE: Post delineators should not be discontinued in sections with guardrail. 300

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/711-003fhwaapproved.pdf?sfvrsn=b780c95_1

Data Collection Forms

Title ITSFM048 Electronic Display Sign Form, Version 09/24 Traffic Signal Control (Intersection, usage (intersection of ramp), year installed, controller manufacturer, model, serial number, signal

https://www.fdot.gov/traffic/itsfm/new-construction/contractor/data-collection-forms.shtml

Highlands Draft Tentative WP_FY27-31

of Work: INTERSECTION IMPROVEMENT Phase Funding Source 2027 2028 2029 2030 2031 Construction Federal, Highways 451362-1 - US 27 AT SEBRING PKWY Type of Work: INTERSECTION IMPROVEMENT Phase Funding

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/district-1-dtwp-fy-27-31/highlands-draft-tentative-wp_fy27-31.pdf?sfvrsn=d35b988_1

Manatee County Draft Tentative WP FY27-31

457527-1 $585,000 $6,183,819 457534-1 - US41(14TH ST W) AT BAYSHORE PARKWAY Type of Work: INTERSECTION, of Work: INTERSECTION IMPROVEMENT Phase Funding Source 2027 2028 2029 2030 2031 Construction Local

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/district-1-dtwp-fy-27-31/manatee-county-draft-tentative-wp-fy27-31.pdf?sfvrsn=b680c8cd_1

Historical Item Averages Market Area 04

$173,643.00 5,240.000 ED N TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 0102107 1 3 $33.14 $173,643.00 5,240.000 ED N TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION 0102115 6 $.33

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/market-area/pdf/historical-item-averages-market-area-04.pdf?sfvrsn=aed33433_3

2024FDM942ITS

• Electronic Toll Collection or Fare Payment • Highway Rail Intersections (under electronic

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm942its.pdf?sfvrsn=74e4e966_1

2024FDM942ITS

• Electronic Toll Collection or Fare Payment • Highway Rail Intersections (under electronic

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm942its.pdf?sfvrsn=ddc961f_1

fdot-bdv25-977-70-rpt

intersections throughout Florida and acquired five of these controllers from different manufacturers

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bdv25-977-70-rpt.pdf?sfvrsn=70c7f8af_3

2025FDM942ITS

• Electronic Toll Collection or Fare Payment • Highway Rail Intersections (under electronic

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm942its.pdf?sfvrsn=55fb50ca_1

2025FDM942ITS

Systems • Electronic Toll Collection or Fare Payment • Highway Rail Intersections (under

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm942its.pdf?sfvrsn=c88f1d6d_2
20 of 3009 results