5200 search results for Standard Specifications
D2-05-21-25BSN-30Day
with Article 3-1 of the Standard Specifications for Road and Bridge Construction, or as amended by the project Specifications Package or any Supplemental Specifications Packages, if it is determined, 4 EXECUTION OF CONTRACT Pursuant to Subsections 3-6 and 3-7 of the Standard Specifications, link http:// www.fdot.gov/contracts/cpp_online_ordering/bidder_assist.shtm , Standard Specifications, a certificate of qualification, unless stipulated in the project description and specifications. If deemed
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2025/may21/d2-05-21-25bsn-30day.pdf?sfvrsn=abb40a87_14710000-724origind
in the Standard Specifications, a reference to the applicable Sections. 8.Pile and wale section, Publications: Publication Yes No Office Staff Contacted Standard Plans Index Traffic Engineering Manual, of the following types of specifications (Hover over type to go to site.): Special Provisions Developmental Specifications List Specifications Affected: (ex. SP3270301, Dev330TL, Dev334TL etc, publications in this Section been verified for accuracy? Contact the State Specifications Office
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/internal/4710000-724origind.pdf?sfvrsn=c650feb9_15230100-122origind
ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance, : Will the proposed revision require changes to: Publication Yes No Office Staff Contacted Standard Plans, Specifications Engineer SUBJECT: Proposed Specification: 5230100 PATTERNED PAVEMENT, , as appropriate, and listed on the APL. Meet manufacturer’s specifications for all patterns, textures
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/internal/5230100-122origind.pdf?sfvrsn=21f9bd54_2TP-10-17-23BSN
consideration in accordance with Article 3-1 of the Standard Specifications for Road and Bridge, of the Department’s Standard Specifications for Road and Bridge Construction. Insurance companies must, Solicitation Notice Page 4 Pursuant to Subsections 3-6 and 3-7 of the Standard Specifications, the successful, https://www.fdot.gov/contracts/cpp-online- ordering/bidder-assist.shtm, Standard Specifications, stipulated in the project description and specifications. If deemed necessary by the Department, certain
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2023/oct17/tp-10-17-23bsn.pdf?sfvrsn=6eb09d95_1D1-03-19-24BSN
of the Standard Specifications for Road and Bridge Construction, or as amended by the project Specifications, specified in the most current edition of the Department’s Standard Specifications for Road and Bridge, OF CONTRACT Pursuant to Subsections 3-6 and 3-7 of the Standard Specifications, the successful bidder shall, ), additional bidders and plan and specifications holders are not published beginning three working days, of qualification, unless stipulated in the project description and specifications. If deemed necessary
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/asset-maintenance/e1w57/d1-03-19-24bsn.pdf?sfvrsn=9b83853f_1FY 2024-2025 Workbook
Workbook Implemented Modifications to the FY 2024-25 Standard Specifications FY 2024-25, to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project. Supplemental Specifications - Additions or revisions to the Standard Specifications. Mandatory Revisions - Critical modifications implemented, modifying the “Award and Execution” timeframes in the Standard Specifications.*Contracts Office must approve
https://www.fdot.gov/programmanagement/implemented/workbooks/fy-2024-2025-workbookFY 2025-2026 Workbook
to the FY 2025-26 Standard Specifications FY 2025-26 Workbook for Lettings Effective July 1, 2025 - June 30, 2026 Please see the PUSH BUTTON page for Push Button Specifications Special Provisions -Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project. Supplemental Specifications - Additions or revisions to the Standard Specifications. Mandatory Revisions - Critical
https://www.fdot.gov/programmanagement/implemented/workbooks/fy-2025-2026-workbook370-001
9 / 2 8 / 2 0 2 3 1 0 : 1 1 : 5 7 A M R E V I S I O N DESCRIPTION: REVISION LAST of STANDARD PLANS FY 2024-25 SHEET INDEX 1 1 370-001 11/01/21 BRIDGE APPROACH EXPANSION JOINT CONCRETE PAVEMENT WITH SPECIAL SELECT SOIL BASE Shoulder Pavement ¡ Roadway Joint, Dimension Manufacturer's Specifications. Seal Installed As Per Polychloroprene Compression, contacting surfaces between the In The Plans For New Construction. Parallel To The Standard Transverse
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/idx/370-001.pdf?sfvrsn=2f353acb_1462-001
1 0 / 1 6 / 2 0 2 3 7 : 1 6 : 0 1 A M R E V I S I O N DESCRIPTION: REVISION LAST of STANDARD PLANS FY 2024-25 SHEET INDEX POST-TENSIONING TENDON PROFILES 1 2 11/01/16 462-001 Tendon Vertical Predominantly Vertical/ 1 0 0 ' - 0 " M a x . 1 0 0, Filler Inlet additional Drain location requirements) Drain (See Specifications Section 462 for Filler, DESCRIPTION: REVISION LAST of STANDARD PLANS FY 2024-25 SHEET INDEX POST-TENSIONING TENDON
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/idx/462-001.pdf?sfvrsn=91124c3c_1SPI-654-001
Standard Plans Instructions Topic No. 625-010-003 Index 654-001 Rectangular Rapid Flashing Beacon Assembly FY 2024-25 1 Index 654-001 Rectangular Rapid Flashing Beacon Assembly Design Criteria FDOT Traffic Engineering Manual (TEM) ; Manual on Uniform Traffic Control Devices (MUTCD); FDOT Design Manual (FDM); AASHTO LRFD Specifications for Structural Supports for Highway Signs, as the associated W11-2, S1-1, or W11-15 crossing warning sign and plaque. If the Standard Plans Instructions
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-654-001.pdf?sfvrsn=a3693c9c_2E3X08
Standard Specifications may be required if any work under this Contract is performed using vessel(s, Start Time: 15 Days Standard Proposal Budget Estimate: $1,250,002.00 Please read the full
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2024/jul11/e3x08.pdf?sfvrsn=97735f0c_144893815201-TMP
of a TMP for the Project: FDOT Design Manual FDOT Standard Plans FDOT Standard Specifications
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25131/44893815201-tmp.pdf?sfvrsn=13025be3_1370-001
9 / 1 0 / 2 0 2 4 1 1 : 2 5 : 4 2 A M R E V I S I O N DESCRIPTION: REVISION LAST of STANDARD PLANS FY 2025-26 SHEET INDEX 1 1 370-001 11/01/21 BRIDGE APPROACH EXPANSION JOINT CONCRETE PAVEMENT WITH SPECIAL SELECT SOIL BASE Shoulder Pavement ¡ Roadway Joint, Dimension Manufacturer's Specifications. Seal Installed As Per Polychloroprene Compression, contacting surfaces between the In The Plans For New Construction. Parallel To The Standard Transverse
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/370-001.pdf?sfvrsn=fe321627_1462-001
1 0 / 1 7 / 2 0 2 4 1 0 : 1 9 : 4 2 A M R E V I S I O N DESCRIPTION: REVISION LAST of STANDARD PLANS FY 2025-26 SHEET INDEX POST-TENSIONING TENDON PROFILES 1 2 11/01/16 462-001 Tendon Vertical Predominantly Vertical/ 1 0 0 ' - 0 " M a x . 1 0, Filler Inlet additional Drain location requirements) Drain (See Specifications Section 462, N DESCRIPTION: REVISION LAST of STANDARD PLANS FY 2025-26 SHEET INDEX POST-TENSIONING TENDON
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/462-001.pdf?sfvrsn=f3cd2249_1SPI-654-001
Standard Plans Instructions Topic No. 625-010-003 Index 654-001 Rectangular Rapid Flashing Beacon Assembly FY 2025-26 1 Index 654-001 Rectangular Rapid Flashing Beacon Assembly Design Criteria FDOT Traffic Engineering Manual (TEM) ; Manual on Uniform Traffic Control Devices (MUTCD); FDOT Design Manual (FDM); AASHTO LRFD Specifications for Structural Supports for Highway Signs, as the associated W11-2, S1-1, or W11-15 crossing warning sign and plaque. If the Standard Plans Instructions
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/spi/spi-654-001.pdf?sfvrsn=8e5120fb_1E4X66-R0
is required for this project. PLEASE READ STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, to maintain the highway lighting system, which is comprised of conventional/standard, sign, under-deck
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2024/dec06/e4x66-r0.pdf?sfvrsn=bb040a6d_1E3X76
in Section 7-13.5 of the FDOT Standard Specifications may be required if any work under, - BRIDGE SUBSTRUCTURE LB 12,469.000 0457- 1- 22 STANDARD INTEGRAL PILE JACKET, STRUCTURAL, 16.1 to 30.0
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2025/feb13/e3x76.pdf?sfvrsn=21b5ee88_1Office of ConstructionTEST
- Research - Structure Manual - Structural Specifications - Structures Standard Plans - Post-Tensioning, Need Help Roadway Criteria - Standard Plans
https://www.fdot.gov/design/training/office-of-constructiontestSPM5220000-724-i19420
with these specifications, and in conformity with the lines, grades, dimensions and notes shown in the plans and the Standard Plans. 522-2 Materials. Meet the requirements specified in 520-2. Assume all risk, with the Standard Plans. 522-7 Placing Concrete. Place the concrete as specified in 520-5. 522-8
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/maintenance/finalized/spm5220000-724-i19420.pdf?sfvrsn=75af000a_1SPM5220000-725-i19895
with these specifications, and in conformity with the lines, grades, dimensions and notes shown in the plans and the Standard Plans. 522-2 Materials. Meet the requirements specified in 520-2. Assume all risk, with the Standard Plans. 522-7 Placing Concrete. Place the concrete as specified in 520-5. 522-8
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/maintenance/finalized/spm5220000-725-i19895.pdf?sfvrsn=6b7cce18_1