3726 search results for fla
SPM1020301WD-122
MOT for Work Document Driven Contracts. Do not use with SPM1020504SiteSpecific. MAINTENANCE OF TRAFFIC. (REV 3-2-20) (1-22) SUBARTICLE 102-3.1 is deleted and the following substituted: 102-3.1 Contractor’s Responsibility: Time begins when the Engineer is notified that setup is complete and flagging operations and maintenance of all temporary traffic control devices are ready for work to begin. Time ends when work has been completed. Notify the Engineer immediately when work has been
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/maintenance/finalized/spm1020301wd-122.pdf?sfvrsn=3d63c646_2SPM1020301WD-722
MAINTENANCE OF TRAFFIC. (REV 3-2-20) (7-22) SUBARTICLE 102-3.1 is deleted and the following substituted: 102-3.1 Contractor’s Responsibility: Time begins when the Engineer is notified that setup is complete and flagging operations and maintenance of all temporary traffic control devices are ready for work to begin. Time ends when work has been completed. Notify the Engineer immediately when work has been completed. Travel time to and from the work site, as well as installation
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/maintenance/finalized/spm1020301wd-722.pdf?sfvrsn=10b83abf_2SPM1020301WD-721
MAINTENANCE OF TRAFFIC. (REV 3-2-20) (7-21) SUBARTICLE 102-3.1 is deleted and the following substituted: 102-3.1 Contractor’s Responsibility: Time begins when the Engineer is notified that setup is complete and flagging operations and maintenance of all temporary traffic control devices are ready for work to begin. Time ends when work has been completed. Notify the Engineer immediately when work has been completed. Travel time to and from the work site, as well as installation
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/maintenance/finalized/spm1020301wd-721.pdf?sfvrsn=dd2d02c9_4SP1020301WD-i16407
MAINTENANCE OF TRAFFIC. (REV 3-2-20) (1-21) SUBARTICLE 102-3.1 is deleted and the following substituted: 102-3.1 Contractor’s Responsibility: Time begins when the Engineer is notified that setup is complete and flagging operations and maintenance of all temporary traffic control devices are ready for work to begin. Time ends when work has been completed. Notify the Engineer immediately when work has been completed. Travel time to and from the work site, as well as installation and removal
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/maintenance/finalized/sp1020301wd-i16407.docx?sfvrsn=c6703ec4_2SP1020301WD
MAINTENANCE OF TRAFFIC. (REV 3-2-20) (7-20) SUBARTICLE 102-3.1 is deleted and the following substituted: 102-3.1 Contractor’s Responsibility: Time begins when the Engineer is notified that setup is complete and flagging operations and maintenance of all temporary traffic control devices are ready for work to begin. Time ends when work has been completed. Notify the Engineer immediately when work has been completed. Travel time to and from the work site, as well as installation and removal
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/maintenance/finalized/sp1020301wd.docx?sfvrsn=3ed6a0b5_2SP1020301WDimpl
MAINTENANCE OF TRAFFIC. (REV 3-2-20) (7-20) SUBARTICLE 102-3.1 is deleted and the following substituted: 102-3.1 Contractor’s Responsibility: Time begins when the Engineer is notified that setup is complete and flagging operations and maintenance of all temporary traffic control devices are ready for work to begin. Time ends when work has been completed. Notify the Engineer immediately when work has been completed. Travel time to and from the work site, as well as installation
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/maintenance/implemented/sp1020301wdimpl.pdf?sfvrsn=e7c301a0_20071100.FHWA
operations within or adjacent to railroad company right-of-way. 7-11.45.3 Watchman or Flagging Services: The railroad company will furnish protective services (i.e., watchman or flagging services, operations within or adjacent to railroad company right-of-way. 7-11.4.3 Watchman or Flagging Services: The railroad company will furnish protective services (i.e., watchman or flagging services
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/fhwa/0071100.fhwa.pdf?sfvrsn=2db20b6f_09750000-723FHWA
and ceiling exposure limits for all components, lower and upper explosive limits, flash point, boiling point, steel coatings shall meet the application requirements of Section 560. Prepare and coat sixteen flat, Testing: Prepare and coat twelve flat test panels for random laboratory verification testing, Outdoor Exposure Testing: Prepare and coat eight test panels (four flat and four composite, Performance Requirements: For laboratory testing, use flat test panels prepared in accordance
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/fhwa/9750000-723fhwa.pdf?sfvrsn=b053fe65_1CM-641-01 Camera Lowering Device
, shrinks, and other flaws. FORMDROPDOWN FORMTEXT Applicant may provide comments in this field, (Step 33) FORMTEXT FORMTEXT Init.: FORMTEXT 50 The cabinet door is double flanged
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/traf_sys/compliance-matrices-2022/cm-641-01-camera-lowering-device.docx?sfvrsn=307a5052_1CITS
systems; FLAIR, SPURS, etc, and DOT Enterprise systems; Financial Management (FM) Electronic Estimates, locations in the state accounting system FLAIR. Each contract is associated with a specific sequence
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procurement/pdf/cits.pdf?sfvrsn=9ab8ad4_7D4 Public Hearing Report 2025 - Palm Beach
ATLANTIC AVENUE TO FLAVOR PICT ROAD Type of Work: ADD LANES & RECONSTRUCT Phase Fund Code 2025 2026 2027
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d4_documents/d4-public-hearing-report-2025---palm-beach.pdf?sfvrsn=22d0e567_34620100-723resp
below the top flange in a box girder); in this case the lower port can be used to inject flexible, days max if not 30 flat to limit corrosion. 30 days unprotected is 30 days unprotected, period
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/comments-responses/4620100-723resp.pdf?sfvrsn=8973f04_2Meeting-Packet-07-24-24-Governing-Board
, MPOAC Mark Reichert, MPOAC Mike Neidhart, FDOT Nicole Estevez, Renaissance Planning Paul Flavien
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2024/meeting-packet-07-24-24-governing-board.pdf?sfvrsn=b6e95785_1SS7820000
wall display, a flat panel display, and a cathode ray tube (CRT) display. 782-2.2.2 Video Display, , a flat panel display, or a CRT display. Ensure that the video display control system hardware, , with fixed panels for access to the lamp, power supply, and projection engine. 782-2.2.6 Flat Panel Display: Furnish and install a flat panel display unit to reproduce video and computer graphics, devices meeting the following minimum requirements. CRT Display Flat Panel Display Rear Projection
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/ss7820000.pdf?sfvrsn=1691fd49_01200101-122FHWA
be made for material allowed to run out of the embankment on a flatter slope than indicated on the cross, on a flatter slope than indicated on the cross-section. The Contractor shall make his own estimate
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/fhwa/1200101-122fhwa.pdf?sfvrsn=56434b6f_2Agency Term Contract - Aluminum Materials
ORDER QUANTITY LBS LF UNIT PRICE VENDOR 000-000 1.25" x .1875 x 12' Flat Bar Alloy 6061-T6 .338 No Award 000-000 1.25" x .250" x 12' Flat Bar Alloy 6061-T6 .338 $12.24 Eastern Metal 707-020 1.5" x .250" x 12' Flat Bar Alloy 6061-T6 .441 $15.90 Eastern Metal 707-060 2" x .250" x 12' Flat Bar Alloy 6061-T6 .588 $21.50 Eastern Metal 000-000 2.5" x .1875" x 12' Flat Bar Alloy 6061-T6 .338 No Award 707-084 4" x .375" x 12' Flat Bar Alloy 6061-T6 1.764 $63.50 Eastern Metal
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procurement/files_agency_term_contracts/agency-term-contract---aluminum-materials.pdf?sfvrsn=3e981f84_41Chapter4
usually flattens out after overtopping. Step 2: a. To determine the overtopping frequency, plot
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/drainage/files/drainagedesignguide/chapter4.pdf?sfvrsn=ca9263d9_50060401-122FHWA
termination point to a fixed reference point on the component, such as beam end or edge of flange. 3, on the component, such as beam end or edge of flange. 3. Proposed approach of investigation
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/fhwa/0060401-122fhwa.pdf?sfvrsn=6e3e3d51_20060400.FHWA
end or edge of flange. 3. Proposed approach of investigation and analysis. 4. Name and credentials, reference point on the component, such as beam end or edge of flange. 3. Proposed approach of investigation
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/fhwa/0060400.fhwa.pdf?sfvrsn=4e9d0744_0