1087 search results for UNIT COST PER PAY ITEM
Urban 12
District: 09 County: 99 DISTRICT/STATE WIDE Pay Items Pay Item Description Total Quantity Unit Weighted Avg. Unit Price Total Amount 102-1 MAINTENANCE OF TRAFFIC 10.00 $71,772.20 101-1 MOBILIZATION 10.00 $78,949.42 327-70-1 MILLING EXIST ASPH PAVT, 1" AVG DEPTH 5,866.67 SY $3.00, Project Manager: Cost-Per-Mile Model Version 19 Project Grand Total $911,865.84 Description, Project Manager: Cost-Per-Mile Model Version 19 Project Grand Total $911,865.84 Description: October
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/costpermile/urban/urban-12.pdf?sfvrsn=1651d9c2_1Urban 13
District: 09 County: 99 DISTRICT/STATE WIDE Pay Items Pay Item Description Total Quantity Unit Weighted Avg. Unit Price Total Amount 102-1 MAINTENANCE OF TRAFFIC 10.00 $93,904.85 101-1 MOBILIZATION 10.00 $103,295.34 327-70-1 MILLING EXIST ASPH PAVT, 1" AVG DEPTH 5,866.67 SY $3.00, Project Manager: Cost-Per-Mile Model Version 19 Project Grand Total $1,186,248.73 Description, DISTRICT/STATE WIDE Project Manager: Cost-Per-Mile Model Version 19 Project Grand Total $1,186,248.73
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/costpermile/urban/urban-13.pdf?sfvrsn=3c34b371_1Rural 11
District: 09 County: 99 DISTRICT/STATE WIDE Pay Items Pay Item Description Total Quantity Unit Weighted Avg. Unit Price Total Amount 102-1 MAINTENANCE OF TRAFFIC 10.00 $62,899.89 101-1 MOBILIZATION 10.00 $69,189.88 104-11 FLOATING TURBIDITY BARRIER 100.00 LF $11.00 $1,100.00 104-12, PAINTED PAVT MARK,STD,WHITE,SKIP, 6" 2.00 GM $720.00 $1,440.00 Project Manager: Cost-Per-Mile Model, Shoulders Page 1 of 2 District: 09 County: 99 DISTRICT/STATE WIDE Project Manager: Cost-Per-Mile Model
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/costpermile/rural/rural-11.pdf?sfvrsn=c34ff180_1Rural 12
District: 09 County: 99 DISTRICT/STATE WIDE Pay Items Pay Item Description Total Quantity Unit Weighted Avg. Unit Price Total Amount 102-1 MAINTENANCE OF TRAFFIC 10.00 $87,461.34 101-1 MOBILIZATION 10.00 $96,207.47 104-11 FLOATING TURBIDITY BARRIER 100.00 LF $11.00 $1,100.00 104-12, PAINTED PAVT MARK,STD,WHITE,SKIP, 6" 4.00 GM $720.00 $2,880.00 Project Manager: Cost-Per-Mile Model, : Cost-Per-Mile Model Version 19 Project Grand Total $1,108,282.20 Description: October 2024
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/costpermile/rural/rural-12.pdf?sfvrsn=6e983cf0_1Rural 14
District: 09 County: 99 DISTRICT/STATE WIDE Pay Items Pay Item Description Total Quantity Unit Weighted Avg. Unit Price Total Amount 102-1 MAINTENANCE OF TRAFFIC 10.00 $145,478.41 101-1 MOBILIZATION 10.00 $160,026.25 104-11 FLOATING TURBIDITY BARRIER 100.00 LF $11.00 $1,100.00 104-12, 710-11-131 PAINTED PAVT MARK,STD,WHITE,SKIP, 6" 4.00 GM $720.00 $2,880.00 Project Manager: Cost-Per, Project Manager: Cost-Per-Mile Model Version 19 Project Grand Total $1,810,288.74 Description: October
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/costpermile/rural/rural-14.pdf?sfvrsn=982b466_1Rural 13
District: 09 County: 99 DISTRICT/STATE WIDE Pay Items Pay Item Description Total Quantity Unit Weighted Avg. Unit Price Total Amount 102-1 MAINTENANCE OF TRAFFIC 10.00 $137,922.09 101-1 MOBILIZATION 10.00 $151,714.30 104-11 FLOATING TURBIDITY BARRIER 100.00 LF $11.00 $1,100.00 104-12, PAINTED PAVT MARK,STD,WHITE,SKIP, 6" 6.00 GM $720.00 $4,320.00 Project Manager: Cost-Per-Mile, Shoulders Page 1 of 2 District: 09 County: 99 DISTRICT/STATE WIDE Project Manager: Cost-Per-Mile
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/costpermile/rural/rural-13.pdf?sfvrsn=3cc83a77_1Rural 15
District: 09 County: 99 DISTRICT/STATE WIDE Pay Items Pay Item Description Total Quantity Unit Weighted Avg. Unit Price Total Amount 102-1 MAINTENANCE OF TRAFFIC 10.00 $175,052.04 101-1 MOBILIZATION 10.00 $192,557.25 104-11 FLOATING TURBIDITY BARRIER 100.00 LF $11.00 $1,100.00 104-12, 710-11-101 PAINTED PAVT MARK,STD,WHITE,SOLID,6" 8.00 GM $1,400.00 $11,200.00 Project Manager: Cost-Per, WIDE Project Manager: Cost-Per-Mile Model Version 19 Project Grand Total $2,168,129.73 Description
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/costpermile/rural/rural-15.pdf?sfvrsn=309cd2d3_1Rural 16
District: 09 County: 99 DISTRICT/STATE WIDE Pay Items Pay Item Description Total Quantity Unit Weighted Avg. Unit Price Total Amount 102-1 MAINTENANCE OF TRAFFIC 10.00 $167,506.44 101-1 MOBILIZATION 10.00 $184,257.08 104-11 FLOATING TURBIDITY BARRIER 100.00 LF $11.00 $1,100.00 104-12, 710-11-131 PAINTED PAVT MARK,STD,WHITE,SKIP, 6" 8.00 GM $720.00 $5,760.00 Project Manager: Cost-Per-Mile, Manager: Cost-Per-Mile Model Version 19 Project Grand Total $2,076,827.91 Description: October 2024
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/costpermile/rural/rural-16.pdf?sfvrsn=2fda83fc_1Rural 17
District: 09 County: 99 DISTRICT/STATE WIDE Pay Items Pay Item Description Total Quantity Unit Weighted Avg. Unit Price Total Amount 102-1 MAINTENANCE OF TRAFFIC 10.00 $210,164.11 101-1, Project Manager: Cost-Per-Mile Model Version 19 Project Grand Total $2,592,985.71 Description, 710-11-131 PAINTED PAVT MARK,STD,WHITE,SKIP, 6" 8.00 GM $720.00 $5,760.00 Project Manager: Cost-Per-Mile Model Version 19 Project Grand Total $2,592,985.71 Description: October 2024 Update
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/costpermile/rural/rural-17.pdf?sfvrsn=4b7a04bb_1Rural 18
District: 09 County: 99 DISTRICT/STATE WIDE Pay Items Pay Item Description Total Quantity Unit Weighted Avg. Unit Price Total Amount 102-1 MAINTENANCE OF TRAFFIC 10.00 $252,281.14 101-1, Project Manager: Cost-Per-Mile Model Version 19 Project Grand Total $3,102,601.84 Description, 710-11-101 PAINTED PAVT MARK,STD,WHITE,SOLID,6" 8.00 GM $1,400.00 $11,200.00 Project Manager: Cost-Per-Mile Model Version 19 Project Grand Total $3,102,601.84 Description: October 2024 Update FDOT
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/costpermile/rural/rural-18.pdf?sfvrsn=66a2aeb7_1Chapter6s2Redline
of pay items that contains the pay item description, quantity, unit price, extended price, and total, items as noted in the SOV. Therefore, if the equivalent description of a pay item is not included, averages do not return a unit price for a specific pay item, it is recommended to process a change order with a negotiated unit price for that item. (1) Asphalt Pay Adjustments Asphalt pay quantity, days. 2. Formal cost proposal request from the Contractor for each proposed pay item
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newhistory/chapter6s2redline.pdf?sfvrsn=821b5061_13Chapter6s2
there is only one LS pay item on these contracts, other items included in payment, not return a unit price for a specific pay item, it is recommended to process a change order with a negotiated unit price for that item. (1) Asphalt Pay Adjustments Asphalt pay quantity adjustments, , the cost proposal from the Contractor for any additional pay items or contract funds needed, the pay item description, quantity, unit price, extended price, and total dollar amount for all pay
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/chapter6s2.pdf?sfvrsn=f45ff2a6_17Subrecipient Reimbursement Guide FY2026 (Enforcement Subgrants) - 10.17.2025
be included with the invoice for public information and education items. EXPENSES WITH A UNIT COST OF $200 OR MORE • Any Expense item with a unit cost of $200 or more must have prior written, • All requests for reimbursement of items having a unit cost of $10,000 or more and a useful life, on how the item will be distributed. 5. Estimated unit cost(s) for the item (must be an economical way, ...................................................... 6 EXPENSES WITH A UNIT COST OF $200 OR MORE
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/safety/3-grants/subrecipient-reimbursement-guide-fy2026-(enforcement-subgrants)---10-17-2025.pdf?sfvrsn=c9763723_13530000.origind
): Will the proposed revision involve Pay Item changes? Yes No Estimates staff contacted (name, : Item No. 353- 70- ConcretePavement Slab Replacement - per cubic yard., of adjacent slabs, caused by slab removal at no cost to the Department. Provide a strength-maturity, * . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S e c t i o n 9 2 9 E mbedded ItemsDowel, per minute. Add the accelerator to the concrete at the job site. Mix the concrete for 40
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/internal/3530000.origind.pdf?sfvrsn=54f0fa27_0SP0090103SLLS
prices as shown in Table 9-2. Table 9-2 Item Description Unit Unit Price 9-2.2.2 F o u n d a t i o n, adjustments in payment on the unit prices as shown in Table 9-3. Table 9-3 Item Description Unit Unit Price, on the actual cost of the items being deleted less all costs incurred prior to the date the Engineer, will not pay for any item of work until the Contractor’s certified monthly estimate is approved. 9-11.2, pay reductions are to be assessed, the Engineer will use the lengths and widths in the calculations
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/workbook/sp0090103slls.pdf?sfvrsn=ede64820_20090103SLLS.impl
in payment on the unit prices as shown in Table 9-2. Table 9-2 Item Description Unit Unit Price, . TheEngineer will base all adjustments in payment on the unit prices as shown in Table 9-3. Table 9-3 Item, adjustment will be based on the actual cost of the items being deleted less all costs incurred, will not pay for any item of work until the Contractor’s certified monthly estimate is approved. 9-11.2, of work, where pay reductions are to be assessed, the Engineer will use the lengths and widths
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/implemented/0090103slls.impl.pdf?sfvrsn=94973091_00090103SLLS.impl
in payment on the unit prices as shown in Table 9-2. Table 9-2 Item Description Unit Unit Price, . TheEngineer will base all adjustments in payment on the unit prices as shown in Table 9-3. Table 9-3 Item, adjustment will be based on the actual cost of the items being deleted less all costs incurred prior, of work, where pay reductions are to be assessed, the Engineer will use the lengths and widths, the Specification tolerances will result in: reconstruction to acceptable tolerances at no additional cost
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/implemented/0090103slls.impl.pdf?sfvrsn=1a721fea_014-Compensation for Extra Work and Delay April 2024 Development
” See 5-12.10(2) When there is a “unit price” (pay item): 5 9-2.1 6 7 When there is a “unit price” (pay item): Entry into 4-3.2 8 or Engineer’s Estimate + Entitlement Analysis 4-3.2.1, is not covered by existing pay items for the increased pipe size. • This work is not a controlling item of work, by increasing pipe size. • This work is not covered by existing pay items for the increased pipe size, . • No time granted since not a controlling item of work. 12 9-3.1 “ If no Contract unit price
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2024-spring-construction-academy/14-compensation-for-extra-work-and-delay-april-2024-development.pdf?sfvrsn=acdd5495_1E21W8BidTabs
orders will be developed using a per lane mile cost multiplied by the lane miles to be completed for that specific work order. The cost per lane mile will be calculated by taking the Contractor's, the cost per lane mile to be utilized in the work order by the Department. This is a Lump Sum Contract with only one pay item listed in the Contract. EXPERIENCE IN ASPHALT PAVING (FORM 850-070-01) MUST, Price Quantity Line No / Item ID Unit Price Ext Amount Unit Price Item Description Alternate
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/bid-tabs/2025/jun17/e21w8bidtabs.pdf?sfvrsn=7c7abc98_13530000.FHWA2
for temperature and unit weight and prepare compressive strength cylinders once per LOT. A LOT, for temperature and unit weight and prepare compressive strength cylinders once per LOT. A LOT, uncontrolled cracks. Repair the damaged area of adjacent slabs, caused by slab removal at no cost, ItemsDowel Bar Assembly ...............Section 931 Calcium Chloride, at a speed of no more than three revolutions per minute. Add the accelerator to the concrete at the job
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/fhwa/3530000.fhwa2.pdf?sfvrsn=76fc58ff_0