444612-1-52-01 - SR45 - Design Variation - Median Width

of hardened centerlines throughout this corridor. Extensive reconfiguration of intersection quadrants, AT INTERSECTIONS WITHOUT HARDENED CENTERLINES SAN G A S SD 2 3 . 2 7 F N D 4 X 4

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25111/444612-1-52-01---sr45---design-variation---median-width.pdf?sfvrsn=d857de7a_1

2025 FDM Summary Comments

Intersections 212.11.1 Section 213 Updated Table 212.11.1 values and equations as needed to meet current, as compared to when "Intersection Lighting Retrofit" or "Isolated Lighting" values are used. ID 404

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025-fdm-summary-comments.pdf?sfvrsn=80956a11_1

2025FDM124QC

interval appropriate to account for context classification, tangent/curves, intersections, and critical, stormwater runoff • Vertical or horizontal clearance issues • Undesirable intersection, side road

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm124qc.pdf?sfvrsn=84b8208_1

2025 FDM Summary of Revisions

on Florida's Turnpike mainline sections. ID 212 FDM Intersections 212.11.1 Section 213 Updated, values are used as compared to when "Intersection Lighting Retrofit" or "Isolated Lighting" values

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025-fdm-summary-of-revisions.pdf?sfvrsn=579003c0_3

2025 FDM Summary of Revisions

on Florida's Turnpike mainline sections. ID 212 FDM Intersections 212.11.1 Section 213 Updated, values are used as compared to when "Intersection Lighting Retrofit" or "Isolated Lighting" values

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025-fdm-summary-of-revisions.pdf?sfvrsn=9428b79a_3

MPOAC-Staff-Directors-Meeting-Minutes-Jan-30-2020-FINAL

than at intersection with another public highway, street, or road to be controlled by traffic, intersections were damaged and over $490 million dollars were expended. • Update on the Joint Certification

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2020/mpoac-staff-directors-meeting-minutes-jan-30-2020-final.pdf?sfvrsn=90be0ab_1

MPOAC-Governing-Board-Meeting-Minutes-Jan-30-2020

highway, street, or road which is located at any point other than at intersection with another public, . 189 intersections were damaged and over $490 million dollars were expended.  Update on the Joint

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2020/mpoac-governing-board-meeting-minutes-jan-30-2020.pdf?sfvrsn=f04e7178_1

Staff-Directors-Meeting-Final-MinutesJan2617

safety at signalized intersections. A bicycle box is a designated area at the head of a traffic lane at a signalized intersection that provides bicyclists with a safe and visible way to get ahead

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2017/staff-directors-meeting-final-minutesjan2617.pdf?sfvrsn=eda3da13_1

Governing-Board-Meeting-Minutes Jan2617

at signalized intersections. A bicycle box is a designated area at the head of a traffic lane at a signalized intersection that provides bicyclists with a safe and visible way to get ahead of queuing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2017/governing-board-meeting-minutes-jan2617.pdf?sfvrsn=34351915_1

March 2025 Target Zero Partner Update

• FHWA Strategies for Enhancing Pedestrian Safety at Intersections Safety Tr a i n i n g i n 2024, countermeasures • Intersection safety. • Pedestrian and bicycle safety • Lane departures • Speed

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/targetzerodocs/march-2025-target-zero-partner-update.pdf?sfvrsn=e86c3aed_1

26109-Ad Scope 6.23.25

that recommended countermeasures may include mid-block crossing, signalized intersection, or corridor-wide, and intersections, and the identification of potential appropriate transportation mitigation and strategies

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26109/26109-ad-scope-6-23-25.pdf?sfvrsn=a4a867a7_1

All CEOPs

and the tracks. Where intersections occur between the W10-1 sign shown in Exhibits 220-1 through 220-4 and the tracks, place an additional W10-1 sign between the intersection and the railroad gate

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/all-ceops.pdf?sfvrsn=40790aec_1

Guidelines for Development of Traffic Signal Timing

the clearance distance along the center of the lane (Use engineering judgment for skewed intersections). 2, for Pattern 2 and adjusted splits and offsets on each intersection Designed By: Date: Checked

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26115/guidelines-for-development-of-traffic-signal-timing.pdf?sfvrsn=c9c05ffa_1

2026FDM124QC

for context classification, tangent/curves, intersections, and critical station expectations, or horizontal clearance issues • Undesirable intersection, side road or driveway geometrics or profiles

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm124qc.pdf?sfvrsn=96269315_2

2026FDM124QC

for context classification, tangent/curves, intersections, and critical station expectations, or horizontal clearance issues • Undesirable intersection, side road or driveway geometrics or profiles

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm124qc.pdf?sfvrsn=5fcd6a15_2

fdot-bed26-977-12-rpt

%) and at non-intersection locations (75%), such as mid-blocks (NHTSA, 2020). To mitigate these risks, FDOT has, at intersections as an alternative to crash-based safety evaluations, recognizing the limitations, to estimate pedestrian crash risks at signalized intersections, similar to how SPFs traditionally model, to objects in the previous frame. The similarity is determined using the Intersection over Union (IoU, at the conflict/intersection point in their line of path (Ahsan et al., 2024; Anwari et al., 2023

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bed26-977-12-rpt.pdf?sfvrsn=72c4cbd4_1

E54B3BidTabs

TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 810.000 ED 35.00000 28,350.00 4.00000 3,240.00 25.00000 20,250.00 0040 0102107 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION, CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL 1.000 PI 15,000.00000 15,000.00

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/bid-tabs/2023/oct03/e54b3bidtabs.pdf?sfvrsn=a49a1fee_1

Florida Department of Transportation Highlights 2023 Accomplishments in Florida's Transportation Infrastructure

million targeted investment in improved intersection lighting for pedestrian safety. With pedestrians, to replace the former signalized intersection. Features like LED lighting, Pedestrian Hybrid Beacon crossings, was completed. This reconstructed intersection will allow for increased capacity and improvements for freight

https://www.fdot.gov/info/co/news/2023/12292023

PublicHearing_MARION COUNTY_Summary_2025-2029

SW 54TH ST TO SECO ENERGY DRIVEWAY Type of Work: INTERSECTION IMPROVEMENT Phase Funding Source, 450952-1 $5,713,124 451060-1 - CR 42 AT CR 25 INTERSECTION IMPROVEMENTS Type of Work: INTERSECTION

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_marion-county_summary_2025-2029.pdf?sfvrsn=9fb3c816_1

E6O75BidTabs

0102104 TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 800.000 ED 30.00000 24,000.00, , INTERSECTION 800.000 ED 30.00000 24,000.00 50.00000 40,000.00 100.00000 80,000.00 0050 0102115, INTERSECTION, FURNISH & INSTALL 4.000 PI 15,000.00000 60,000.00 18,000.00000 72,000.00, - INTERSECTION 4.000 PI 500.00000 2,000.00 1,500.00000 6,000.00 1,000.00000 4,000.00 0555 0632 7 7 SIGNAL CABLE, REMOVE- OUTSIDE OF INTERSECTION 2,000.000 LF 2.00000 4,000.00 2.00000 4,000.00