9189 search results for test

SS1200000

of one full LOT. Perform five QC tests at random locations within the test section. All five QC tests and a Department Verification test must meet the density required by 120-10.2. Identify the test, of a change in compaction effort or soil classification, failing QC test or when the QC tests cannot, Control data when test results meet the following conditions: QualityControl tests must meet, by sampling and testing the material in accordance with the specified test method listed in 120-10.2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2009/files/ss1200000.pdf?sfvrsn=4f2e5d0f_0

5230200.resp

in the initial QPL application, section 523-2.1? The DFT test would allow the manufacturer to test, test results until the product is placed on the Department test deck. By only allowing the DFT as an alternative in the field test, the Department has knowledge of a passing Skid test installation and has the option of conducting a Skid test on the field test installation. Response: Yes

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan11/files/5230200.resp.pdf?sfvrsn=8d863f94_0

3340102.resp

test method dates unless the test method was changed and we were still working on the FM. Those, and the outcome is the test methods apply for the date of the contract, therefore it is important to place the date on the test method. If there was no date on a test method, then the contractor/supplier would be faced with a potential change in test method that does not apply to his contract. A good, to determining the bulk density. This required a $5000 piece of equipment and a change to the test

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/comments-responses/3340102.resp.pdf?sfvrsn=bc6c506a_0

3370302.resp

not including test method dates unless the test method was changed and we were still working on the FM, and the outcome is the test methods apply for the date of the contract, therefore it is important to place the date on the test method. If there was no date on a test method, then the contractor/supplier would be faced with a potential change in test method that does not apply to his contract, to the test method. Some contractors chose to use the old method for their contracts let previous

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/comments-responses/3370302.resp.pdf?sfvrsn=65e96901_0

9750700.FHWA

of the structure. 975-7.2 Performance Requirements: For laboratory testing, use flat test panels prepared, in accordance with ASTM G 7. Laboratory Testing - Non-Sacrificial Property Test M e t h o d, , intrusion 9750700.D012 All Jobs Laboratory Testing - Non-Sacrificial Property Test M e t h o d, , softening or adhesion loss. Outdoor Exposure Testing – Non-Sacrificial Property Test M e t h o, Property Test M e t h o d Requirement Cyclic Weather Testing AASHTO R-31, no salt fog, 95F, 0%- 90

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul12/files/9750700.fhwa.pdf?sfvrsn=dfb72973_0

fdot-bee76-977-01-rpt

bars tested ................................................... 12 Figure 13. Test setup, ................................................................... 35 Figure 28. Fiber content representative test samples (a) pre-testing and (b) post-test (ignition) for Pultrall and (c) pre-testing and (d) post-test (ignition) for MST-Bar, e 46. Concrete compressive strength results at time of testing (ASTM C39) for bond pullout tests, bars. Experimental testing, including tensile, bond, and durability assessments, was conducted

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bee76-977-01-rpt.pdf?sfvrsn=f1d2d0e4_3

section61-031919

for verification testing along with corresponding mill certifications, certificates of analysis (COA) and test, .” 6.1.11.2 Quality Control Testing and Inspection The QC Plan must include the quality control test, of the Production Facility. Index tests derived from existing test methods may be developed and implemented, approval) to witness the test, and provide a report. Testing may be performed off-site, provided, successful test reports in the QC Plan. Hydrostatic testing will be subject to requalification after

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/materials-manual/section61-031919.pdf?sfvrsn=37877c37_1

section61-031919

for verification testing along with corresponding mill certifications, certificates of analysis (COA) and test, .” 6.1.11.2 Quality Control Testing and Inspection The QC Plan must include the quality control test, of the Production Facility. Index tests derived from existing test methods may be developed and implemented, approval) to witness the test, and provide a report. Testing may be performed off-site, provided, successful test reports in the QC Plan. Hydrostatic testing will be subject to requalification after

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/materials-manual/section61-031919.pdf?sfvrsn=8772562c_1

Section6.1-031919_1-20WB

for verification testing along with corresponding mill certifications, certificates of analysis (COA) and test, .” 6.1.11.2 Quality Control Testing and Inspection The QC Plan must include the quality control test, of the Production Facility. Index tests derived from existing test methods may be developed and implemented, approval) to witness the test, and provide a report. Testing may be performed off-site, provided, successful test reports in the QC Plan. Hydrostatic testing will be subject to requalification after

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/january-2020/materials-manual/section6-1-031919_1-20wb.pdf?sfvrsn=c93ea1b6_1

SP4440000

. 444-3.4 Testing: The pumping test employed to determine the capacity of the well and whether, General: Furnish all labor, materials and equipment required to construct, test and maintain deep, operated without interruption for a period of 30 minutes. Locate the intake of the test pump, -pumping water level prior to the start of the test. 444-3.5 Maintenance of Wells: Cap and seal the completed deep wells immediately following construction and testing of the well. During

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/sp4440000.pdf?sfvrsn=6979fb8b_0

9140000.fhwa

(minimum of three tests) greater than 2.5% and any individual test value more than 4.0%. The organic, are as follows: (see 914-3 for qualifying tests for these conditions.) The Contractor shall provide information or test results to the District Materials Engineer to substantiate these properties. At least 97, Engineer. When blending is permitted blended material shall be tested to ensure the above, samples per source 914-3 Testing of Materials for Use as Stabilizer. No testing of any materials

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul09/files/9140000.fhwa507fa40f051b46eea2214371c41b59eb.pdf?sfvrsn=20e839ab_0

fdot_asct

,twoofwhichweresuccessfully testedandimplementedinthefield:amodifiedversionofOPAC(OptimizationPoliciesfor

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/cmtp/stamp/fdot_asct.pdf?sfvrsn=54055b8a_1

9430000.resp

by the manufacturer are as per specifications. No change made. 2. The Spec requires that the testing of pipe joints and gaskets to be done in the presence of the Engineer. a. Are these tests done at the job site or the fabrication facility? Response: The tests are done at the fabrication facility. b, or/and the plant is required to hire an independent firm and provide the test results to the Department (SMO, seems to single-out metal pipe as having a unique special testing requirement. We agree

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/comments-responses/9430000.resp.pdf?sfvrsn=bfa3e17a_0

1250801.FHWA

of the connecting pipe. Notify the Engineer in writing prior to beginning construction of a test section. Construct a test section of the length of one LOT. Perform five quality control (QC) tests at random locations within the test section. All five tests must meet the density required by 125-9.2, , construct a new test section. When a QC test fails the requirements of 125-9.2 or when the QC tests, thickness above the soil envelope then the Contractor must demonstrate with a successful test section

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/fhwa/1250801.fhwa.pdf?sfvrsn=6f5caa99_0

1250801.FHWA

then the Contractor must demonstrate with a successful test section that density can be achieved. Notify the Engineer in writing prior to beginning construction of a test section. Construct a test section of the length of one LOT. Perform five quality control (QC) tests at random locations within the test section. All five tests must meet the density required by 125-9.2 and be verified by the Department, a QC test fails the requirements of 125-9.2 or when the QC tests cannot be verified, construct a new

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/fhwa/1250801.fhwa.pdf?sfvrsn=adb8eb03_0

Section62V2

for Testing and Materials (ASTM) Standard Test Methods and Specifications, Philadelphia, ” Note: All pipe sizes above 96” must be tested on each individual size. Table 2 Hydrostatic Test, Specifications, and Part II Tests, Washington, D.C. Approved Product List (APL), Florida Department of Transportation Field sampling and Testing Manual, Florida Department of Transportation SCOPE, to the inspections, measurements, and necessary tests to substantiate materials and Pipe in conformity

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/materials-manual/redline/section62v2.pdf?sfvrsn=9936239c_1

Section62V2-722cln

for Road and Bridge Construction American Society for Testing and Materials (ASTM) Standard Test Methods, licensed testing laboratory shall calibrate all jacks and gauges for the three-edge-bearing test, has been tested, unless otherwise requested by the Department. The Pipe Joint Performance Test, be tested on each individual size. Table 2 Hydrostatic Test Approval Size Ranges (Elliptical) Range 1, ), Part I Specifications, and Part II Tests Approved Product List (APL), Florida Department

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/materials-manual/section62v2-722cln.pdf?sfvrsn=cabc74b7_2

Section62V2-723cln

for Road and Bridge Construction American Society for Testing and Materials (ASTM) Standard Test Methods, that the testing equipment is properly maintained in accordance with the applicable test methods, above 96” must be tested on each individual size. Table 2 Hydrostatic Test Approval Size Ranges, ), Part I Specifications, and Part II Tests Approved Product List (APL), Florida Department, pertain to the inspections, measurements, and necessary tests to substantiate materials and Pipe

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/materials-manual/section62v2-723cln.pdf?sfvrsn=e288281b_2

Section62V2-724cln

for Road and Bridge Construction American Society for Testing and Materials (ASTM) Standard Test Methods, testing equipment. I. Joint forming equipment and gaskets, and Pipe test results. J. LOT number. K, ), Part I Specifications, and Part II Tests Approved Product List (APL), Florida Department, pertain to the inspections, measurements, and necessary tests to substantiate materials and Pipe, to perform specified inspections and tests and maintain an acceptable QC program in compliance

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/materials-manual/section62v2-724cln.pdf?sfvrsn=ca5eb23_1

Section62V2-725cln

for Road and Bridge Construction American Society for Testing and Materials (ASTM) Standard Test Methods, licensed testing laboratory shall calibrate all jacks and gauges for the three-edge-bearing test, has been tested, unless otherwise requested by the Department. The Pipe Joint Performance Test, be tested on each individual size. Table 2 Hydrostatic Test Approval Size Ranges (Elliptical) Range 1, ), Part I Specifications, and Part II Tests Approved Product List (APL), Florida Department

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/materials-manual/section62v2-725cln.pdf?sfvrsn=a51804b0_1
20 of 9189 results