7241 search results for Pavement

January 10, 2024

Important Letting Documents Full Advertisement Correction to Full Advertisement – E7Q56 Bid Items DBE Availability Fuel Allocation Work Class Breakouts Plans & Proposal Holders Mandatory Pre-Bid Meeting Attendance Supplements All vendors wishing to do business with any State agency must register at the following web site: My Florida Market Place Proposal ID County Major Work Type Addendum E7Q50-R0 Districtwide Districtwide Push Button - Signing/Pavement Markings Prequalification required

https://www.fdot.gov/contracts/district-offices/d5/lettings/dist-letting-project-info.shtm/lists/contracts-d7-lettings-2024/january-10-2024

20180207_438478-1_SR 9 (I-95) Rest Areas_70225

(in) Pavement Layer (in.) Comments Remarks: Crack Depth of "B" indicates full depth crack to the base. EOP = Edge of Pavement Crack Extent: L= Light; M= Moderate; S= Severe Pavement Condition: G= Good; F, Rest Area MP 23.550 to 23.950 State of Florida Department of Transportation PAVEMENT EVALUATION

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/coringdata/d5/70/20180207_438478-1_sr-9-(i-95)-rest-areas_70225.pdf?sfvrsn=bde9ae2f_1

E1W14-05-16

and resurfacing, drainage, lighting, signalization, landscaping, and signing and pavement marking, OF TRAFFIC (44195015201) LS 1.000 0102- 2-200 SPECIAL DETOUR- TEMPORARY PAVEMENT (44195015201) LS 1.000, , BASE GROUP 14 SY 1,767.000 0327- 70- 2 MILLING EXISTING ASPHALT PAVEMENT, 3 1/2" AVG DEPTH SY 8,010.000 0327- 70- 6 MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH SY 863.000 0334- 1- 15, 1,959.400 0339- 1- MISCELLANEOUS ASPHALT PAVEMENT TN 28.800 0350- 5- CLEANING & SEALING JOINTS

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2024/may16/e1w14-05-16.pdf?sfvrsn=22b63c62_1

Additional Resources

 A Accelerated Pavement Testing/Heavy Vehicle Simulator Aggregate Mine Approvals Approved Products, Bridge Testing O Outlook Web Access (Employee Login Required)  P Pavement Coring Data Pavement Condition Survey Pavement Investigations/Evaluations Pit Proctor Quarterly Report Plant

https://www.fdot.gov/materials/navigation/more.shtm

E8V45Withdrawal

DESCRIPTION: Sign & Pavement Markings for AET LITE conversion – Zone 3 WITHDRAWN This proposal has been

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/jul09/e8v45withdrawal.pdf?sfvrsn=b6a7c55c_1

FDOT Traffic Plans

and Signing & Pavement Markings design based on a typical traffic plans design workflow. In MicroStation design techniques using Traffic Plans Signing & Pavement Marking, Signalization, . Topics Covered: : Signing & Pavement Markings Signalization FDOT Traffic Plans - Lighting, - Chapter 6 Pavement Marking Tools 09/14/2016 Module 6 of 11 - Chapter 7 Signing Tools 09/21/2016

https://www.fdot.gov/cadd/downloads/documentation/fdotss4/fdottrafficplans/trafficplans.shtm

Exhibit 230-17a-b

Requirements Pavement Marking See MUTCD For Island NOT TO SCALE 01/01/2024 EXHIBIT 230-17b NOT TO SCALE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/exhibit-230-17a-b.pdf?sfvrsn=b4f98840_1

548-020

 9 / 1 3 / 2 0 2 4 8 : 4 6 : 0 2 A M R E V I S I O N DESCRIPTION: REVISION LAST of STANDARD PLANS FY 2025-26 SHEET INDEX 1 1 548-020 11/01/21 MSE RETAINING WALL SYSTEMS - PERMANENT Roadway Pavement Shoulder or Ground Line Proposed Final Concrete Facing Panels Interior Face of Soil Volume Limits of Note 9) required (See Construction Surface treatment when Elevation Leveling Pad Top of Coping Elevation Top of Junction Slab Joint Filler

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/548-020.pdf?sfvrsn=d2d0b77_1

711-003RL2

" White Begin 8" White INTERCHANGE MARKINGS 11/01/21 711-003 2 8 TYPICAL PAVEMENT MARKINGS, ) NOTES: 3. 2. See Index 711-001 for pavement message dimensions and details. acceleration lane from the gore markings. 1. Extend this 8" white Pavement Marker one-fourth the length of the Merge Pavement Message and Arrow only used for Two-Lane Entrances. taper begins for a Single-Lane Parallel-Type

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2023/errata/711-003rl2.pdf?sfvrsn=89ac9331_1

711-003RL2

" White (10'-30') 8 2 711-003 INTERCHANGE MARKINGS 11/01/21 TYPICAL PAVEMENT MARKINGS AT ENTRANCE, : 3. 2. See Index 711-001 for pavement message dimensions and details. acceleration lane from the gore markings. 1. Extend this 8" white Pavement Marker one-fourth the length of the Merge Pavement Message and Arrow only used for Two-Lane Entrances. taper begins for a Single-Lane Parallel-Type

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2024/errata/711-003rl2.pdf?sfvrsn=ed00dd_1

E8W02

& PAVEMENT MARKINGS FOR AET LITE CONVERSION AT GARCON Limits: 58170000 Project(s): 45474215201, labor, materials, equipment, and incidentals necessary to install and remove signage, pavement, RAISED PAVEMENT MARKER, TYPE B EA 37.000 0711- 11-160 THERMOPLASTIC, STANDARD, WHITE, MESSAGE OR SYMBOL, 0.148 0711- 17- 1 THERMOPLASTIC, REMOVE EXISTING THERMOPLASTIC PAVEMENT MARKINGS- SURFACE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/mar11/e8w02.pdf?sfvrsn=33cb8cad_1

20231207_450635-1_SR 48-SR 475_18060

= Moderate; S= Severe Pavement Condition: G= Good; F= Fair; P= Poor Crack Types: A= Alligator; Bl, " indicates full depth crack to the base. EOP = Edge of Pavement SR 48 / SR 475 9.994 10.235 Core No. MP Distance from left edge of lane (ft.) Lane Wheel Path Pavement Layer (in.) Base Crack, . Belt Avenue State of Florida Department of Transportation PAVEMENT EVALUATION AND CONDITION DATA

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/coringdata/d5/18/20231207_450635-1_sr-48-sr-475_18060.pdf?sfvrsn=e6015208_1

Fehr & Peers FDOT D1 TRC Meeting 2.25.25

 Introducing Fehr & Peers February 2025 • Safety • Complete Streets • Corridor Studies • Active Transportation Plans • Traffic Operations • Forecasting • Big Data • GIS • Resiliency Planning • Transit Planning • Freight Planning Expertise and Experience Categories • Traffic Engineering Studies (6.1) • Traffic Signal Timing (6.2) • ITS Analysis and Design (6.3.1) • ITS Engineering Systems Communication (6.3.3) • Signing, Pavement Marking and Channelization (7.1

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26104/fehr-peers-fdot-d1-trc-meeting-2-25-25.pdf?sfvrsn=70810025_1

LAP3340000-122FHWA

Mix Asphalt Concrete (HMA) pavement based on the type of work specified in the Contract, Concrete Pavement will fall into one of the following work categories: 334-1.2.1 Asphalt Work, -mainline pavement locations. 334-1.2.3 Asphalt Work Category 3: Includes the construction of new mainline HMA pavement lanes, milling and resurfacing. 334-1.3 Mix Types: Use the appropriate HMA mix

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/lap/fhwa/lap3340000-122fhwa.pdf?sfvrsn=65714857_2

SP3270100

 MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (1-16) ARTICLE 327-1. The third paragraph is deleted and the following substituted: ForthisContract,theDepartment will retain ownership of _____ of the milled material. Haul and stockpile the material to remain the property of the Department at the location shown on the plans. The Contractor will take ownership of any milled material not to be retained by the Department. ARTICLE 327-6. The text is deleted

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/workbook/sp3270100.pdf?sfvrsn=cdc705ee_2

3460705-724IMPL

 346 STRUCTURAL PORTLAND CEMENT CONCRETE. (REV 7-10-23) (FA 10-4-23) (FY 2024-25) SUBARTICLE 346-7.5 is deleted and the following is substituted: 346-7.5 Concreting in Hot Weather: Hot weather concreting is defined as the production, placing and curing of concrete when the concrete temperature at placing exceeds 85ºF but is 100ºF or less. Unless the specified hot weather concreting measures are in effect, reject concrete exceeding 85ºF at the time of placement. Concrete pavement slab

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/implemented/3460705-724impl.pdf?sfvrsn=e843584e_1

9320501-724IMPL

 932 NONMETALLIC ACCESSORY MATERIALS FOR CONCRETE PAVEMENT AND CONCRETE STRUCTURES. (REV 6-28-23) (FA 10-24-23) (FY 2024-25) SUBARTICLE 932-5.1 is deleted and the following substituted: 932-5.1 General Requirements: Provide synthetic polymer slurry products to facilitate the construction of drilled shafts. Products must contain long chain-like hydrocarbon molecules which interact with each other, with the soil, and with the water to effectively increase the viscosity of the fluid

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/implemented/9320501-724impl.pdf?sfvrsn=3d464430_1

7100100-724CommResp

 7100100 PAINTED PAVEMENT MARKINGS COMMENTS FROM INTERNAL/INDUSTRY REVIEW Keith Riddle (239)406-0379 Comments: 7-5-23 Regarding "Payment for removal of non-conflicƟng markings will be paid separately" What pay item is this work paid by? or is it considered extra work? Response: Removal of non-conflicƟng painted markings are paid under 710-17-. Removal of non-conflicƟng markings of other material types are paid under their respecƟve removal pay item (e.x., removal of non-conflicƟng

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/comments-responses/7100100-724commresp.pdf?sfvrsn=43073b2c_1
20 of 7241 results