1780 search results for bridge inspection

SS4300000

inspection shall be replaced at no cost to the Department. Deflection measurements are taken, . Pipedeflected5%ormoreofthecertified actual mean diameter of the pipe at final inspection shall, . TheDepartment will reimburse the Contractor for the actual costs of any trestle bridge work

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2007/january-2007/workbook/ss43000007889f24b640643be8d981bd6a57a5acf.pdf?sfvrsn=37cd03d5_0

7850000.FHWA

) and the Standard Specifications for Road and Bridge Construction (SSRBC). This activity is a planned part, testing and inspection required by Sections 346 and 450; however the PCI personnel and plant, device is operated. Provide manufacturer recommended field installation instructions, inspection

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/fhwa/7850000.fhwa.pdf?sfvrsn=68e90a2_0

0060000.FHWA

Signals and Devices (MSTCSD) and the Standard Specifications for Road and Bridge Construction (SSRBC, their quality and fitness for the work, to facilitate prompt inspection, and to minimize noise impacts, their quality and fitness for the work, to facilitate prompt inspection, and to minimize noise

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/fhwa/0060000.fhwa.pdf?sfvrsn=5aa4723_0

SS4300000

of the pipe at final inspection shall be replaced at no cost to the Department. Deflection, method used. Pipedeflected5%ormoreofthecertifiedactualmean diameter of the pipe at final inspection, as provided below. TheDepartment will reimburse the Contractor for the actual costs of any trestle bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2009/january-2009/workbook/ss4300000.pdf?sfvrsn=634fe8a3_0

SS0070104

a site inspection. Provide this notification sufficiently in advance of planned commencement, following acceptance of final payment and have them available for inspection by the Department, and sub-phases of the number of hours devoted to each. Highway or Bridge Carpenter Helper, Mechanic

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/ss0070104.pdf?sfvrsn=53696116_0

5300000.FHWA

of this Section. IftheACBrevetment system is intended for use as bridge abutment protection, include, . 3.Forareasadjacent to bridge abutments, detail mat placement around curves, connections, protection, the gradation of the riprap by visual inspection at the project site. Resolve any difference of opinion, . IftheACBrevetment system is intended for use as bridge abutment protection, include the following, . 3.Forareasadjacent to bridge abutments, detail mat placement around curves, connections, protection of mat ends

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/fhwa/5300000.fhwa.pdf?sfvrsn=4b94074a_0

Chapter5s11Redline

for the Resident Office (RO), both Department and Consultant Construction Engineering and Inspection (CCEI, Construction Engineering and Inspection Scope of Service requirements (when applicable). Topic, ) Certifications of Quantities See CPAM Section 5.14 for more information. (B) Roadway and Bridge Daily Work, to vehicles in an area under construction, over spray on a vehicle due to bridge painting, structural

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newhistory/chapter5s11redline.pdf?sfvrsn=d628112d_13

Chapter5s11

), both Department and Consultant Construction Engineering and Inspection (CCEI) staff, and methods, requirements of CPAM Section 3.5 and the Consultant Construction Engineering and Inspection Scope, for more information. (B) Roadway and Bridge Daily Work Report (DWR) The Daily Work Report (DWR, , damage to vehicles in an area under construction, over spray on a vehicle due to bridge painting

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/chapter5s11.pdf?sfvrsn=31605624_18

4550502DB.FHWA

- 5.13 will not require inspection during handling. Keep a pile driving log for each pile installed, the piles within one bent or pier for a specific bridge for each phase of construction. Each Foundation, with 455- 5.13 will not require inspection during handling. Keep a pile driving log for each pile, as all the piles within one bent or pier for a specific bridge for each phase of construction. Each

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/fhwa/4550502db.fhwa.pdf?sfvrsn=cb1f45eb_0

OEM-CRM-Handbook_2025

of Alligator Alley, the Bob Graham/ Sunshine Skyway Bridge, the I-75 Snake Wall, and Myrtle Avenue, /Sunshine Skyway Bridge; a segment of Alligator Alley (I-75) extending from the tollbooth near Naples

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/cultural-resources/oem-crm-handbook_2025.pdf?sfvrsn=eaa7e41d_1

TP-02-13-24BSN

consideration in accordance with Article 3-1 of the Standard Specifications for Road and Bridge, of the Department’s Standard Specifications for Road and Bridge Construction. Insurance companies must, for Road and Bridge Construction and the Special Provisions for instructions for submission of a DBE/AA, ): 44262515201(*) Federal Aid No: N/A Total Roadway Length: 1.183 Miles Contract Days: 772 Total Bridge, 0107- 2- MOWING AC 721.630 0108- 1- MONITOR EXISTING STRUCTURES- INSPECTION AND SETTLEMENT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/feb13/tp-02-13-24bsn.pdf?sfvrsn=1dde5fba_1

Pt2Ch8_073124_clean

on Post-1945 Common Bridge Types, and consideration of effects of the undertaking on historic properties other than the common bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/pdeman/2024/pt2ch8_073124_clean.pdf?sfvrsn=ad6dda04_1

44893815201-DrainageReportTechMemo

perform periodic inspections to identify if there are any deficiencies in structural integrity, requiring routine inspection and maintenance may include but are not limited to: Side slopes, - "Construction Completion and Inspection Certification for Activities Associated With a Private

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25131/44893815201-drainagereporttechmemo.pdf?sfvrsn=ac09d94_1

App F BCR_South_N&V_Report

of westbound Terminal Drive bridge to offset the storage lost from introducing the platform and sidings, relocated to the outside. The station work and existing bridge piers will require the existing FEC, the bus stop to the vertical circulation/pedestrian bridge to access the platform. Pedestrians will only, and safety inspections. BCR South track work construction will require coordination with FEC

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/projects_browardcommuterrail/appendices-environmental-assessment/app-f-bcr_south_n-v_report.pdf?sfvrsn=ed6d5dd8_1

Historical Item Averages Market Area 05

$6,552,800.00 3,276.400 CY N CONC CLASS II, BRIDGE SUPERSTRUCTURE 0400 2 5 1 $2,000.00 $502,400.00 251.200 CY N CONCRETE CLASS II, BRIDGE SUBSTRUCTURE 0400 2 10 1 $2,000.00 $2,642,000.00 1,321.000 CY N, 0400 4 5 1 $2,000.00 $1,243,600.00 621.800 CY N CONCRETE CLASS IV, BRIDGE SUBSTRUCTURE 0400 4 8 1, CY N CONCRETE CLASS IV, MASS, SUBSTRUCTURE 0400 7 1 1 $10.00 $121,120.00 12,112.000 SY N BRIDGE DECK GROOVING 0400 9 1 1 $10.00 $120,330.00 12,033.000 SY N BRIDGE DECK PLANING 0400145 1 $5.00

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/estimates/reports/historical-item-average-costs-reports/moving/market-area/pdf/historical-item-averages-market-area-05.pdf?sfvrsn=c640785e_16
20 of 1780 results