4643 search results for fla

CPAM 7.4 Clean 2022-PrC

be in an executed status. (3) The DCE or designee will reduce the Florida Account Information Resource (FLAIR) “6s, Contingency Supplemental Agreements and 7-4-4 Work Orders a new FLAIR “6s” line with a Function Code/ Work, ) system. (4) The FLAIR contract amendment file will be updated to indicate the change. The funds, encumbrance request will be approved by the CFM system when the encumbrance is processed through FLAIR

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/cpam-7-4-clean-2022-prc.pdf?sfvrsn=661b3ce7_3

Florida Department of Transportation Wins 2021 Perpetual Pavement Award

easily meets the criteria for a PPA: By Performance and has served the traveling public in Fla. well, is critical to providing a sustainable quality of life, and Fla. continues to lead the nation in maintaining

https://www.fdot.gov/info/co/news/2022/06012022

4500301-723FHWA

, the top flange dormant strands may be released after the concrete reaches a compressive strength of 2,000, in the bearing areas and edges of the top flange, a minor spall is defined as a spall not larger than 2.0, with 450-13.5. Spalls located at the edges of the top flange are considered minor spalls as follows: 1. A spall on one edge of the top flange, without a coincident spall on the other edge of the top flange, are not greater than 25% of the width of the top flange. 2. Coincident spalls on opposite edges

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/fhwa/4500301-723fhwa.pdf?sfvrsn=a0ed073d_1

4000404.origind

experience excessive web plate deformations, top and bottom flange lateral bending deformations, and out, than 6" above the bottom flange and/or the concrete deck overhang is 4 feet or greater, within 6 inches of the bottom flange. If the lower contact point of the overhang falsework bears more than 6 inches above the bottom flange and/or if the deck overhang is 4 feet or greater, submit

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/internal/4000404.origind.pdf?sfvrsn=3722fee3_0

2023 BOE Manual

Type flags in the BOE, allowing for easy identification of items that may require additional, includes valid (effective/obsolete) dates. A Spec flag is assigned to all pay items for non-standard work, , Trial Items 1000s Utilities 2.8.3 Specification Flags on Pay Items Several letters or “flags, The Spec-Type flags in the BOE are indications of the level of pay item support that were likely necessary, in the BOE, but the presence of a flag can still indicate that further due diligence may be required

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/publications/boe/2023-boe-manual.pdf?sfvrsn=3244e10b_1

6410000.FHWA

a smooth finish free from cracks, blow-holes, shrinks, and other flaws. All roller fairlead frames, . The winch cabinet door must be double -flanged and include neoprene closed-cell gaskets permanently, . The winch cabinet door opening must be double flanged. The winch cabinet door must iInclude a pin, -holes, shrinks, and other flaws. All roller fairlead frames must be corrosion resistant stainless, -flanged and include neoprene closed-cell gaskets permanently secured on the interior door surfaces

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/fhwa/6410000.fhwa.pdf?sfvrsn=eb168fac_0

8-Fall 2023 Construction Academy MOT Session

changes are performed with minimal disruption to work activities • A list of trained flaggers must, and removal of pavement markings • Crash reporting • Night work • Flaggers • Motorist Awareness, , flaggers, and other personnel responsible for work zone related transportation management, Department of Transportation Process Review Findings Low profile barrier did not have proper flare

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2023-construction-academy/fall-2023/8-fall-2023-construction-academy-mot-session.pdf?sfvrsn=1d4f5d28_2

13-2024 Construction Academy MOT Session

to work activities • A list of trained flaggers must be submitted before construction begins, • Night work • Flaggers • Motorist Awareness System (MAS) • Work zone clearances • Inactive, of Traffic) Personnel: Worksite Traffic Supervisors, flaggers, and other personnel responsible, of Transportation Process Review Findings Low profile barrier did not have proper flare rate

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2024-spring-construction-academy/13-2024-construction-academy-mot-session.pdf?sfvrsn=bb04613d_1

2025 Construction Academy MOT Session

with minimal disruption to work activities • A list of trained flaggers must be submitted before, • Crash reporting • Night work • Flaggers • Motorist Awareness System (MAS) • Work zone, Traffic Control (Maintenance of Traffic) Personnel: Worksite Traffic Supervisors, flaggers, and other, Process Review Findings Low profile barrier did not have proper flare rate on approach end. Index

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2024-fall-construction-academy/2025-construction-academy-mot-session.pdf?sfvrsn=59567378_1

MOT Session- PDF

with minimal disruption to work activities • A list of trained flaggers must be submitted before, • Crash reporting • Night work • Flaggers • Motorist Awareness System (MAS) • Work zone, Traffic Control (Maintenance of Traffic) Personnel: Worksite Traffic Supervisors, flaggers, and other, Process Review Findings Low profile barrier did not have proper flare rate on approach end. Index

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2025-spring-construction-academy/mot-session--pdf.pdf?sfvrsn=c2151e5_1

MOT Session

with minimal disruption to work activities • A list of trained flaggers must be submitted before, • Crash reporting • Night work • Flaggers • Motorist Awareness System (MAS) • Work zone, Traffic Control (Maintenance of Traffic) Personnel: Worksite Traffic Supervisors, flaggers, and other, Process Review Findings Low profile barrier did not have proper flare rate on approach end. Index

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2025-fall-construction-academy/mot-session.pdf?sfvrsn=87d1d53a_1

441700-1.Cove Rd from SR-76_Kanner Hwy to SR-5_US-1 GeoReport

plains on marine terraces on flatwoods. The parent material 2 Geotechnical Services - PD&E TSFGeo, of the map unit. Slopes are 0 to 2 percent. This component is on flatwoods on marine terraces, percent. This component is on flatwoods on marine terraces on coastal plains. The parent material, . Slopes are 0 to 2 percent. This component is on flatwoods on marine terraces on coastal plains, . Excellent exposures occur in Flagler County in Washington Oaks State Park, in Martin County

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cove-road-study/441700-1-cove-rd-from-sr-76_kanner-hwy-to-sr-5_us-1-georeport.pdf?sfvrsn=42e3d65b_1

OIT-Manual-Full

Management Database (CMDB) and flagged as confidential and exempt. (b) Documenting, No. 325-060-020 Disciplinary Action Procedure, Topic No. 250-012-011 FLAIR Access Security, Topic

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/it/oitmanual/oit-manual-full.pdf?sfvrsn=64a7d686_3

9320200-724origind

and certification per this Section. Flash tolerance, finish and appearance of bearings shall meet, shall be finished or machined flat to within 0.01 inches. The bottom surfaces of external load plates (masonry plates) designed to rest on bearing pads shall not exceed an out of flatness value, in the finished product. External load bearing plates shall be finished or machined flat to within 0.01 inches, shall not exceed an out of flatness value of 0.0625 inches. External load bearing plates (e.g

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/internal/9320200-724origind.pdf?sfvrsn=32f5b967_1

plans - Pinellas Sheriff

OF CEMENTITIOUS MATERIAL PER CUBIC YARD. 4. PROVIDE A FLAT BEARING SURFACE ON TOP SURFACE ON TOP SHAFT BELOW, PROJECT SUPERVISOR TO AVOID DELAYS AND INTERFERENCE. 6.2 FLOCK SAFETY WILL PROVIDE RAILROAD, FLAGMEN, FOR SUCH SIGNALMEN AND FLAGMEN WITH FLOCK SAFETY. 6.3 IN ADDITION TO THE SCHEDULING REQUIREMENTS

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/test/approved-lpr/plans---pinellas-sheriff.pdf?sfvrsn=766cf1c3_1

9160000.impl

, AASHTOT44-03(2011) inTrichloroethylene Minimum 99.0% (Not applicable for PG 76-22 (ARB)) Flash, Charge Test (c) positive Test on Residue: (d) FlashPoint COC minimum 410ºF Viscosity 140ºF 6 0 0

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/implemented/9160000.impl.pdf?sfvrsn=b7582c74_0

444634-1_SR72-HawkinsRd_ICE-Memo_FINAL

LOCATION JUNCTION_FLAG S4_CRASH_TYPE S4_CRASH_TYPE_SIMS4_CRASH_SEVERIT S4_INJURY_COUNT S4_BICYCLIST_COUNT, is recommended: • Install SCHOOL ENTRANCE Warning Signs (FTP 33-06) with supplemental flashing beacons, approaches to the intersection with supplemental flashing beacons to operate during school arrival and dismissal periods. Per Chapter 15 of the FDOT Speed Zoning Manual, flashing beacons should be used, (FTP 33-06) with supplemental flashing beacons to operate during school arrival and dismissal

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26123/444634-1_sr72-hawkinsrd_ice-memo_final.pdf?sfvrsn=a03849e2_1
20 of 4643 results