2219 search results for bridge inspection

D2-06-11-25BSN

and Bridge Construction, or as amended by the project Specifications Package or any Supplemental, edition of the Department’s Standard Specifications for Road and Bridge Construction. Insurance, /bidder_assist.shtm , Standard Specifications for Road and Bridge Construction and the Special, /A Total Roadway Length: 0.000 Miles Contract Days: 630 Total Bridge Length: 0.114 Miles Letting Date, , BRIDGE SUBSTRUCTURE CY 210.000 0400- 2- 10 CONCRETE CLASS II, APPROACH SLABS CY 17.200 0400- 4- 4

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2025/jun11/d2-06-11-25bsn.pdf?sfvrsn=46bc506b_1

TP-01-13-26BSN2

Specifications for Road and Bridge Construction, or as amended by the project Specifications Package, specified in the most current edition of the Department’s Standard Specifications for Road and Bridge, : 3.440 Miles Contract Days: 1437 Total Bridge Length: 0.138 Miles Letting Date: 01/13/26 Total, , new stormwater treatment facilities, new bridge structures (OBrien Road and US 27 (North), new, STRUCTURES/BRIDGES (43578635201 BRIDGE ID 110619) LS 1.000 0110- 3- REMOVAL OF EXISTING STRUCTURES

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2026/jan13/tp-01-13-26bsn2.pdf?sfvrsn=986fd041_1

5360000.impl

, certificate of compliance, and visual inspection by the Engineer. 536-5 Method of Measurement, Standards and indicated in the Plans. 536-5.5 Bridge Anchorage Assembly/Approach Transition Connection, in 536-6.1, where special guardrail posts are installed instead of standard posts. 536-6.5 Bridge Anchorage, and barrier delineators for existing post and beam bridge railings. 536-6.6 Removal of Existing, - Bridge Anchorage Assembly/Approach Transition Connection to Rigid Barrier - each. Item No. 536- 73

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/implemented/5360000.impl.pdf?sfvrsn=9fc1e2f7_0

2025 Northeast Florida Regional Trends

construction and construction engineering inspection of upgrades to the waterline that will service, to Huguenot Memorial Park on Heckscher Drive/State Road A1A and on the Fort George River Bridge, parts of Duval, Clay, and St. Johns Counties and extends to I-95. It includes a new bridge over, to I-95. S o u r c e: F D O T FCE New St. Johns River Bridge I-95 will receive over, coquina barrier between the Bridge of Lions and Charlotte Street to raise the sea wall and prevent

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/fto/trends---conditions-folder/2025netrends.pdf?sfvrsn=afa4cb25_3

Research Center

], Final Report [19.849MB] Structures June 13, 2025 BED02 Steel Bridge Coating, ] Maintenance March 17, 2025 BE932 Inspection of Flexible Filler Tendons Summary, ] Structures April 18, 2024 BDV31-977-132 Temperature Effects in Match-cast Segmental Bridge, June 16, 2023 BDV31-977-110 Development of GFRP-Reinforced Single Slope Bridge Rail Summary [191KB, Members and the Effects of Galvanic Coupling on Bridge Tendons Summary [142KB], Final Report [3.332MB

https://www.fdot.gov/research/default.shtm

E1W47RFP

: . . . . . . .................................................................................. 4 4 U. Construction Engineering and Inspection, DOCUMENTS EA01_Original Bridge Asbuilts I-75 at SR 780 EA02_4206132_STRUCTURES_Concept Plans, , and construction techniques for bridge structures as discussed in Part 1, Chapter 121 of the FDOT Design Manual, interchange. Additional I-75 improvements include the replacement of the southbound Palmer Blvd bridge to its ultimate location, inside widening of the existing northbound Palmer Blvd bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1w47/e1w47rfp.pdf?sfvrsn=fd0af1fb_9

444008-4 Phase IIR Comments

, but no bridge repairs are shown in structures plans. Ken Muzyk 1/20/2023 1 An inspection of all, and other Wildlife Regulations of the FDOT Standard Specifications for Road and Bridge Construction, will be required to adhere to the FDOT Standard Specifications for Road and Bridge Construction manual, and resurfacing the road, widening the inside shoulders, guardrail replacement, and repair of bridge expansion, on the 48 bridges within the project limits are only 6' wide. If the inside bridge shoulders

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25115/444008-4-phase-iir-comments.pdf?sfvrsn=67859a8f_1

TP-04-09-24BSN

consideration in accordance with Article 3-1 of the Standard Specifications for Road and Bridge Construction, of the Department’s Standard Specifications for Road and Bridge Construction. Insurance companies must, ://www.fdot.gov/contracts/cpp-online- ordering/bidder-assist.shtm, Standard Specifications for Road and Bridge, : 1204 Total Bridge Length: 0.081 Miles Letting Date: 04/09/24 Total Proposal Length: 4.771 Miles, reconstruction, widening, milling and resurfacing, widening of Bridge Nos. 860490 and 860491 over Sample Rd

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/apr09/tp-04-09-24bsn.pdf?sfvrsn=96152a64_1

TP-04-16-24BSN

consideration in accordance with Article 3-1 of the Standard Specifications for Road and Bridge Construction, of the Department’s Standard Specifications for Road and Bridge Construction. Insurance companies must, ://www.fdot.gov/contracts/cpp-online- ordering/bidder-assist.shtm, Standard Specifications for Road and Bridge, Aid No: N/A Total Roadway Length: 4.690 Miles Contract Days: 1204 Total Bridge Length: 0.081 Miles, and resurfacing, widening of Bridge Nos. 860490 and 860491 over Sample Rd, widening of Bridge No. 860492 over

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/apr16/tp-04-16-24bsn.pdf?sfvrsn=e7cdc62f_1

D4-10-03-25BSN

with Article 3-1 of the Standard Specifications for Road and Bridge Construction, or as amended, and manner specifiedinthemostcurrenteditionoftheDepartment’s Standard Specifications for Road and Bridge, for Road and Bridge Construction and the Special Provisions for instructions for submission of a DBE/AA, Counties: BROWARD Road Name:COUNTYWIDE SONOVOID SLAB BRIDGE REHAB - BRIDGE-REPAIR/REHAB Limits, : 243 Total Bridge Length: 0.041Miles Letting Date: 10/03/25 Total Proposal Length: 0.081Miles

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2025/oct03/d4-10-03-25bsn.pdf?sfvrsn=43f11a3a_1

Program Management Bulletin 22-03

Standard Specifications for Road and Bridge Construction: See Attachment 1 for draft modifications, and Bridge Construction Federal-Aid Policy Guide, 23 Code of Federal Regulations (CFR) 637 Procedure, There are three methods of material acceptance: 1) certification; 2) visual inspection; and 3) sampling, into Witness-and-Hold projects. Visual Inspection may also be an alternate method of acceptance for sampling, Specifications for Road & Bridge Construction Review and Administration Manual, Topic No. 700-050-05 FDOT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/bulletins/fpo/2022/program-management-bulletin-22-03.pdf?sfvrsn=875641be_1

BABA Bulletin- 12-5-2022 (FHWA Approved)

Standard Specifications for Road and Bridge Construction: See Attachment 1 for draft modifications, Standard Specifications for Road and Bridge Construction Federal-Aid Policy Guide, 23 Code of Federal, of Acceptance There are three methods of material acceptance: 1) certification; 2) visual inspection; and 3, , for example certain materials incorporated into Witness-and-Hold projects. Visual Inspection may, 61G15-27.001, F.A.C. Standard Specifications for Road & Bridge Construction Review and Administration

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/resources/bulletins/2022/baba-bulletin--12-5-2022-(fhwa-approved).pdf?sfvrsn=cbcfe3c9_1

E1W47Addendum002

: . . . . . . .................................................................................. 4 4 U. Construction Engineering and Inspection, . Vendor Scrunity-DBE (375-030-60 & 275-030-11, 11B) EXEMPT ATTACHMENT DOCUMENTS EA01_Original Bridge, , details, and construction techniques for bridge structures as discussed in Part 1, Chapter 121, of the southbound Palmer Blvd bridge to its ultimate location, inside widening of the existing northbound Palmer Blvd bridge to accommodate the auxiliary lane, inside widening of both southbound

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1w47/e1w47addendum002.pdf?sfvrsn=bd70d108_1

D2-05-21-25BSN-30Day

with Article 3-1 of the Standard Specifications for Road and Bridge Construction, or as amended, Specifications for Road and Bridge Construction. Insurance companies must be authorized to do business, for Road and Bridge Construction and the Special Provisions for instructions for submission, (*) Federal Aid No: N/A Total Roadway Length: 1.704 Miles Contract Days: 850 Total Bridge Length, Quantity Section 0001 Structures 0400- 2- 4 CONC CLASS II, BRIDGE SUPERSTRUCTURE CY 226.100 0400- 2- 5

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2025/may21/d2-05-21-25bsn-30day.pdf?sfvrsn=abb40a87_1

Section84V2cln

, the submittal of the mix designs, laboratory and field trial batches of the concrete mixes, and inspection, Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction. Florida, for the training of personnel who are involved in these activities. G. The proposed inspection, of the personnel performing the required inspection, and testing of SCC. Topic No.: 675-000-000, inspection and testing of the demonstration concrete during batching, delivery, placement, and post

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/materials-manual/section84v2cln.pdf?sfvrsn=d4cfbb9e_2

Section 8.4 VII-122

, the submittal of the mix designs, laboratory and field trial batches of the concrete mixes, and inspection, Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction. Florida, for the training of personnel who are involved in these activities. G. The proposed inspection and test, of the personnel performing the required inspection and testing of SCC. Topic No.: 675-000-000 Materials, method and sequence that are addressed in the QC Plan. Perform inspection and testing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/materials-manual/section-8-4-vii-122.pdf?sfvrsn=673bc6aa_2

SectionMM84V2

, the submittal of the mix designs, laboratory and field trial batches of the concrete mixes, and inspection, Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction. Florida, for the training of personnel who are involved in these activities. G. The proposed inspection and test, of the personnel performing the required inspection, and testing of SCC. Topic No.: 675-000-000 Materials, Plan. Perform inspection and testing of the demonstration concrete during batching, delivery

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/materials-manual/sectionmm84v2.pdf?sfvrsn=e132500b_2

Section8.4V2-721cln

, the submittal of the mix designs, laboratory and field trial batches of the concrete mixes, and inspection, Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction. Florida, for the training of personnel who are involved in these activities. G. The proposed inspection and test, of the personnel performing the required inspection, and testing of SCC. Topic No.: 675-000-000 Materials, inspection and testing of the demonstration concrete during batching, delivery, placement, and post

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/materials-manual/section8-4v2-721cln.pdf?sfvrsn=cb603a8e_2

Section84V2-722cln

, laboratory and field trial batches of the concrete mixes, and inspection and testing of production, (FDOT) Standard Specifications for Road and Bridge Construction. Florida Department of Transportation, in these activities. G. The proposed inspection and test methods for the laboratory and field trial batches, . L. The qualifications and familiarity of the personnel performing the required inspection, Plan. Perform inspection and testing of the demonstration concrete during batching, delivery

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/materials-manual/section84v2-722cln.pdf?sfvrsn=c0bf511c_2

Section84V2-722

, and inspection and testing of production concrete. Produce SCC using a central mixer at an on-site facility, Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction, inspection and test methods for the laboratory and field trial batches. H. The verification method, of the personnel performing the required inspection and testing of SCC. Topic No.: 675-000-000, inspection and testing of the demonstration concrete during batching, delivery, placement, and post

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/materials-manual/redline/section84v2-722.pdf?sfvrsn=fbf51b14_1
20 of 2219 results