2795 search results for fhwa

5300201FHWA

 Florida Department of Transportation RON DESANTIS GOVERNOR 605 Suwannee Street Tallahassee, FL 32399-0450 JARED W. PERDUE, P.E. SECRETARY www.fdot.gov September 2, 2025 Daniel Holt, PE, PTOE Director, Project Delivery Director, Technical Services FHWA 400 West Washington Street, Suite 4200 Orlando, FL 32801 Re: State Specifications Office Section: 530 Proposed Specification, , or the National Highway Institute, Hydraulic Engineering Circular (HEC) No. 23, Publication No. FHWA

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/fhwa/5300201fhwa.pdf?sfvrsn=9613af68_1

CHAPTER 19

(as implemented by the FDOT Right of Way Procedures Manual) may result in FHWA withholding all Federal funds, -by-case basis by FHWA and the Department. 19.3 RIGHT OF WAY ACQUISITION LAs performing right

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/lap/manual/final_lap-ch-19__2020-08-13-hyperlink-updates.pdf?sfvrsn=536a6603_15

23I-012 River to Sea TPO-Final Report_Signed

(FHWA) and the Federal Transit Administration (FTA) annually deliver lump sum appropriations, . This agreement states the terms and conditions upon which the FHWA funds will be provided, the FTA Metropolitan Planning Program and State Planning and Research Program with FHWA Planning funds, , and progress report that is approved by the Department. The MPO shall provide any other data required by FHWA, No. 23I-012 ● Page 18 of 21 23 C.F.R. 420.111-Documentation requirements Proposed use of FHWA planning

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ig/reports/23i-012-river-to-sea-tpo-final-report_signed.pdf?sfvrsn=9cfb531a_1

General Interest Roadway Data

(FHWA) Performance Monitoring System (HPMS) Field Manual. This manual is published by the FHWA, , storage, reporting, and management of transportation data requirements by FDOT and FHWA. Transportation, . 525-020-310-k Page 5 of 14 TDA will annually submit the transportation data into the FHWA HPMS web, . The TDA HPMS Coordinator will submit the report to FHWA only after approval from Department, the HPMS data requirements outlined in the FHWA HPMS Field Manual. Districts will retain all inventory

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cimdocs/docs---pubs/525-020-310.pdf?sfvrsn=788898f2_3

2025FDM103Forms

: If Yes, submit to FHWA Director. A justification and all supporting documents must be attached, Department and FHWA requirements presented in the Contract Documents. I have been provided with all 90, with all Department and FHWA requirements presented in the Contract Documents. I have been provided, : FHWA Project of Division Interest: Yes No Request for: Design Exception Design Variation Design, Engineer Date Name: FHWA Division Administrator Form 122-B Form 122-B Project Design Variation

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm103forms.pdf?sfvrsn=35ddf9c9_3

2-MPOAC-Governing-Board-June-07-2018

• Status of Various Research Efforts FHWA Florida Division Presentation Transportation Performance Measurement Updates June 2018 Recent Milestones • FHWA Approved FDOT Freight Plan: Feb, and Bridge targets by Nov 20, 2018, FHWA will not approve NHPP funded projects (per 23 CFR 515, equivalent data sources (PM3) • FDOT to Report BR/Pvmt/Sys Perf Targets to FHWA • Baseline Reports, – Districts 4, 6 – stacie.blizzard@dot.gov • FHWA FL Division Website: www.fhwa.dot.gov/fldiv/tpm.cfm

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac/uploads/filebase/november_6-7._2017_documents/2-mpoac-governing-board-june-07-2018_24b3d666-31ca-4f35-a490-294312e04519.pdf?sfvrsn=86df8e36_2

2-MPOAC-Governing-Board-June-07-2018_2

• Status of Various Research Efforts FHWA Florida Division Presentation Transportation Performance Measurement Updates June 2018 Recent Milestones • FHWA Approved FDOT Freight Plan: Feb, and Bridge targets by Nov 20, 2018, FHWA will not approve NHPP funded projects (per 23 CFR 515, equivalent data sources (PM3) • FDOT to Report BR/Pvmt/Sys Perf Targets to FHWA • Baseline Reports, – Districts 4, 6 – stacie.blizzard@dot.gov • FHWA FL Division Website: www.fhwa.dot.gov/fldiv/tpm.cfm

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2018/2-mpoac-governing-board-june-07-2018_2.pdf?sfvrsn=99862f2d_1

Staff-Directors-Meeting-Final-MinutesJan2617

ADMINISTRATION 6. Ms. Karen Brunelle, Director, Federal Highway Administration (FHWA) Florida Division, Office, Team Leader, FHWA Office of Project Development, made several announcements of interest to the members, for sustainability improvements.  FHWA has hired Teresa Parker to take the position of Transportation, .  The FHWA Office of Planning, Environment, and Realty (HEP) launched a new video, Building Better Multimodal Networks, on the FHWA website and on the FHWA YouTube channel. This video highlights the many

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2017/staff-directors-meeting-final-minutesjan2617.pdf?sfvrsn=eda3da13_1

Governing-Board-Meeting-Minutes Jan2617

Brunelle, Director, Federal Highway Administration (FHWA) Florida Division, Office of Project, , FHWA Office of Project Development, made several announcements of interest to the members:  Ms, for sustainability improvements. 7  FHWA has hired Teresa Parker to take the position of Transportation, Coordination and Planning Area Reform Final Rule was published in December 2016.  The FHWA, Networks, on the FHWA website and on the FHWA YouTube channel. This video highlights the many ways

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2017/governing-board-meeting-minutes-jan2617.pdf?sfvrsn=34351915_1

1020302.FHWA

Program Report 350 (NCHRP 350) or the Manual for Assessing Safety Hardware 2009 (MASH) and current FHWA, for inclusion on the QPL shall include the FHWA WZ numbered acceptance letter with attachments and vendor, Highway Administration’s (FHWA) accepted sign substrate for use with accepted sign stands, 350) or the Manual for Assessing Safety Hardware 2009 (MASH) and current FHWA directives, include the FHWA WZ numbered acceptance letter with attachments and vendor drawings of the device

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/fhwa/1020302.fhwa.pdf?sfvrsn=74eae890_0

1020302.FHWA-REVISED

) and current FHWA directives. Manufacturers seeking evaluation must furnish certified test reports, devices for inclusion on the QPL shall include the FHWA WZ numbered acceptance letter with attachments, specified on the QPL drawings. Provide Federal Highway Administration’s (FHWA) accepted sign substrate, (NCHRP 350) or the Manual for Assessing Safety Hardware 2009 (MASH) and current FHWA directives, shall include the FHWA WZ numbered acceptance letter with attachments and vendor drawings

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/fhwa/1020302.fhwa-revised.pdf?sfvrsn=a4c28839_0

1020302.FHWA

FHWA directives. Manufacturers seeking evaluation must furnish certified test reports showing, for inclusion on the QPL shall include the FHWA WZ numbered acceptance letter with attachments and vendor, on the QPL drawings. Provide Federal Highway Administration’s (FHWA) accepted sign substrate for use, Report 350 (NCHRP 350) or the Manual for Assessing Safety Hardware 2009 (MASH) and current FHWA, for inclusion on the QPL shall include the FHWA WZ numbered acceptance letter with attachments and vendor

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/fhwa/1020302.fhwa.pdf?sfvrsn=4e548c9f_0

9900200-723FHWA2

application and installation 2.Crash testing reports. 3. All relevant FHWA Eligibility Letters, 6f. All relevant FHWA Eligibility Letters 9900200D01 All Jobs SECTION 990 is expanded, reports demonstrating the device meets MASH TL-3 6. All relevant FHWA Eligibility Letters, application and installation 2. Crash testing reports. 3. All relevant FHWA Eligibility Letters, relevant FHWA Eligibility Letters 9900200D01 All Jobs SECTION 990 is expanded by the following

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/fhwa/9900200-723fhwa2.pdf?sfvrsn=22ddb79_1

444634-1_SR72_NSR_20240918

LIST OF TABLES Table Page Number Table 2-1: FHWA & FDOT Noise Abatement Criteria, noise levels were produced using the Federal Highway Administration (FHWA) Traffic Noise Model, would be a benefit. FHWA has established noise levels at which noise abatement must be considered, defines “approach” as within one dB(A) of the applicable FHWA criterion. For comparison purposes, ) PD&E Study – Noise Study Report Page 8 Table 2-1: FHWA & FDOT Noise Abatement Criteria Activity

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26123/444634-1_sr72_nsr_20240918.pdf?sfvrsn=7562c1b3_1

2026FDM103Forms

: No ☐ Yes ☐ Note: If Yes, submit to FHWA Director. A justification and all supporting documents must, with all Department and FHWA requirements presented in the Contract Documents. I have been provided, are in compliance with all Department and FHWA requirements presented in the Contract Documents, : Co./Sec./Sub. End Project MP: FHWA Project of Division Interest: Yes No Request for: Design, Design Engineer Date Name: Chief Engineer Date Name: FHWA Division Administrator Form 122-B Form

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm103forms.pdf?sfvrsn=f2731f8a_10

2025FDM103Forms

: If Yes, submit to FHWA Director. A justification and all supporting documents must be attached, Department and FHWA requirements presented in the Contract Documents. I have been provided with all 90, are in compliance with all Department and FHWA requirements presented in the Contract Documents. I have, ./Sub. End Project MP: FHWA Project of Division Interest: Yes No Request for: Design Exception, Engineer Date Name: Chief Engineer Date Name: FHWA Division Administrator 13 Form 122-B Form

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm103forms.pdf?sfvrsn=2495fee3_5

2026FDM103Forms

MP: End Project MP: Full Federal Oversight: No ☐ Yes ☐ Note: If Yes, submit to FHWA Director, resolved, and that the plans are in compliance with all Department and FHWA requirements presented, have been adequately resolved, and that the plans are in compliance with all Department and FHWA, Name: State Road Number: Begin Project MP: Co./Sec./Sub. End Project MP: FHWA Project, : FHWA Division Administrator Form 122-B Form 122-B 14 Project Design Variation Memorandum

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm103forms.pdf?sfvrsn=d4ef3693_2

4550103DB.FHWA2

FHWA submittal. These changes are notated by comments. The changes are proposed by Juan Castellanos, [dt1]: Change made by originator after initial FHWA submittal. 4550103DB.D012 Use when, 600 30 950 Commented [dt2]: Change made by originator after initial FHWA submittal. Commented [dt3]: Change made by originator after initial FHWA submittal. Commented [dt4]: Change made by originator after initial FHWA submittal. Commented [dt5]: Change made by originator after initial

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/fhwa/4550103db.fhwa2.pdf?sfvrsn=e9cc5880_0

650-000-002_ETDM_Manual_Ch2_Approved-Effective_-2017-0518

Native American Tribes. Agency agreements between FDOT/Federal Highway Administration (FHWA, ) must have a designated MPO/TPO for transportation projects to qualify for FHWA or Federal Transit, about plan consistency on their website at: http://www.fdot.gov/planning/policy/metrosupport/. FHWA, with FHWA) Topic No. 650-000-002 March 16, 2006 ETDM Manual Revised: May 18, 2017 ETDM Process, for Qualifying Projects Federal Dollars (any FHWA, FTA or FRA funds or federal authorization) State

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/etdm/current/650-000-002_etdm_manual_ch2_approved-effective_-2017-0518.pdf?sfvrsn=b89967bb_0

650-000-002_ETDM_Manual_Ch2_Approved-Effective_-2017-0518

Native American Tribes. Agency agreements between FDOT/Federal Highway Administration (FHWA, ) must have a designated MPO/TPO for transportation projects to qualify for FHWA or Federal Transit, /planning/policy/metrosupport/. FHWA provides clarification about transportation planning requirements, or expressway (based on coordination with FHWA) Topic No. 650-000-002 March 16, 2006 ETDM Manual, on the SIS ETDM Screening Matrix for Qualifying Projects Federal Dollars (any FHWA, FTA or FRA funds

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/etdm/current/650-000-002_etdm_manual_ch2_approved-effective_-2017-0518f07475217e5c4c28aa21ea49cf983dec.pdf?sfvrsn=9f96f93_2
20 of 2795 results
Top