4710 search results for fla

6410000.impl

castings must have a smooth finish free from cracks, blow-holes, shrinks, and other flaws. All roller, be double-flanged and include neoprene closed-cell gaskets permanently secured on the interior door

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/implemented/6410000.impl.pdf?sfvrsn=6704391e_0

ST JOHNS_Draft Tentative Work Program Public Hearing_By Project_10-11-2023

$4,000,000 433126-4 - NORTHEAST FLA REG APT DESIGN & CONST HANGARS PFL0014305 Type of Work: AVIATION, : Aviation 439967-1 - NORTHEAST FLA REG APT DESIGN & CONST ARFF BUILDING PART 139 PFL0007619 Type, $1,667,000 Local $75,000 State $75,000 Total for Project 439967-1 $1,817,000 439968-1 - NE FLA REG, $1,868,027 $6,801,406 210265-9 - SRA1A FROM FLAGLER C/L TO E MAGNOLIA AVE Type of Work: RESURFACING

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/st-johns_draft-tentative-work-program-public-hearing_by-project_10-11-2023.pdf?sfvrsn=b830ddd1_1

ST JOHNS_Draft Tentative Work Program Public Hearing_D2 By Description_10-11-2023

for Project 433126-2 $2,000,000 439968-1 - NE FLA REG APT ACQUISITION OF INDEX B ARFF VEH REQ PART 139, Logistics And Passenger Operations Program: Aviation 439967-1 - NORTHEAST FLA REG APT DESIGN & CONST, 439967-1 $1,817,000 433126-4 - NORTHEAST FLA REG APT DESIGN & CONST HANGARS PFL0014305 Type of Work, State $1,105,549 Total for Project 210265-8 $1,868,027 $6,801,406 210265-9 - SRA1A FROM FLAGLER C/L

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/st-johns_draft-tentative-work-program-public-hearing_d2-by-description_10-11-2023.pdf?sfvrsn=6437cf63_1

2024FDM918DrngMap

of construction with station equations. Show stationing at an appropriate interval. (4) Flag and station the begin and end project limits. (5) Flag and station the begin and end of bridges

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm918drngmap.pdf?sfvrsn=744c533e_1

2024FDM919LatDitch

and dimensions as appropriate: Flag and station the begin and end lateral ditch or outfall construction, the design intent, include the following: Flag and station the begin and end lateral ditch. Label

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm919latditch.pdf?sfvrsn=27d6bf6b_1

2024FDM919LatDitch

and dimensions as appropriate: Flag and station the begin and end lateral ditch or outfall construction, necessary to convey the design intent, include the following: Flag and station the begin and end lateral

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm919latditch.pdf?sfvrsn=b1a7a976_1

2025FDM918DrngMap

of construction with station equations. Show stationing at an appropriate interval. (4) Flag and station the begin and end project limits. (5) Flag and station the begin and end of bridges

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm918drngmap.pdf?sfvrsn=2dce83a3_2

2025FDM919LatDitch

labeling and dimensions as appropriate: Flag and station the begin and end lateral ditch or outfall, to convey the design intent, include the following: Flag and station the begin and end lateral ditch

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm919latditch.pdf?sfvrsn=50351411_2

2025FDM919LatDitch

labeling and dimensions as appropriate: Flag and station the begin and end lateral ditch or outfall, labeling and dimensions necessary to convey the design intent, include the following: Flag

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm919latditch.pdf?sfvrsn=170403d2_2

2026FDM919LatDitch

. Provide the following labeling and dimensions as appropriate: Flag and station the begin and end, : Flag and station the begin and end lateral ditch. Label percent grade for each tangent section. When

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm919latditch.pdf?sfvrsn=69452d09_2

2026FDM918DrngMap

at an appropriate interval. (4) Flag and station the begin and end project limits. (5) Flag and station

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm918drngmap.pdf?sfvrsn=f0c0326f_2

2026FDM919LatDitch

. Provide the following labeling and dimensions as appropriate: Flag and station the begin and end, : Flag and station the begin and end lateral ditch. Label percent grade for each tangent section. When

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm919latditch.pdf?sfvrsn=bcf3621a_1

Approved CTQP Providers - Aggregates

University Department of Civil & Environmental Engineering 10555 West Flagler Street (Office, & Environmental Engineering 10555 West Flagler Street (Office EC-2430) Miami, Florida 33174 (305

https://www.fdot.gov/construction/training/ctqp/approvedproviders/providers/aggregate.shtm

Approved CTQP Providers - Asphalt Plant

Dept of Civil & Environmental Engineering 10555 West Flagler Street (Office EC-2430) Miami, Florida, International University Dept of Civil & Environmental Engineering 10555 West Flagler Street (Office EC-2430

https://www.fdot.gov/construction/training/ctqp/approvedproviders/providers/asphaltplant.shtm

E55F2

 Florida Department of Transportation Bid Solicitation Notice and Approximate Quantities Letting: 05250204 Call Order: 002 Proposal: E55F2 District:05 Counties: FLAGLER Road Name: SR 5 (US-1) Limits: 73010000 Project(s): 44521625201(*) Federal Aid No: N/A Total Roadway Length: Contract Days: 170 Total Bridge Length: Letting Date: 02/04/25 Total Proposal Length: 6 . 175 Miles 0.000, Coast Parkway northerly for 6.175 miles to south of the St Johns County line in Flagler County

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2025/feb4/e55f2.pdf?sfvrsn=bce41192_4

E59D2

 Florida Department of Transportation Bid Solicitation Notice and Approximate Quantities Letting: 05260203 Call Order: 007 Proposal: E59D2-R0 District:05 Counties: FLAGLER, LAKE, SEMINOLE, VOLUSIA Road Name: Roadside Repair Limits: Midpoint Project(s): 42795817234(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000 Miles Letting Date, Fiscal Year: 2026 Counties: Lake, Seminole, Volusia and Flagler Counties Contract Calendar Days: 365

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2026/feb03/e59d2.pdf?sfvrsn=7d261d10_1

20_Drainage_Rulemaking

feet per second (fps) when the storm drain is flowing full. Where not practical or possible in flat, flow from intersecting streets before it reaches the major highway. • Flanking inlets in sag, longitudinal gutter grade shall be 0.3%. Minimum grades can be maintained in very flat terrain by use, , or water control facilities. If other modifications, such as landscaping or providing flat slopes, can

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/floridagreenbook/16th-edition/20_drainage_rulemaking.pdf?sfvrsn=417b68ec_1
20 of 4710 results
Top