1780 search results for bridge inspection

3340501int

of visual inspection. The Engineer may require the Contractor to run process control tests, in 334-1.4. Density testing for acceptance will not be performed on asphalt courses placed on bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/review/fy2025-26/internal/3340501int.pdf?sfvrsn=7efd3cae_1

Scope of Services and Staff Hour Estimation

, click here for the User Guide and here for the Technical Manual. Roadway & Bridge Structural, and automated fee proposal for Geotechnical and Materials testing. Construction Engineering & Inspection (CEI

https://www.fdot.gov/designsupport/scope/default.shtm

3340501-721impl

of visual inspection. The Engineer may require the Contractor to run process control tests, . Density testing for acceptance will not be performed on asphalt courses placed on bridge decks

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/review/implemented/3340501-721impl.pdf?sfvrsn=a99d6faf_2

5610401.impl

of Record qualified in Type Work Category 4.3, Complex Bridge Design. Submit a contingency plan, ft-cd for inspection. All drawings and calculations must be submitted and accepted before any work

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/implemented/5610401.impl.pdf?sfvrsn=ef09adeb_0

0050700.origind

or points necessary to provide lines and grades for construction of all roadway, bridge, and miscellaneous, to the Engineer at the time of completion of the project. The Engineer’s inspection, checking, or acceptance

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/internal/0050700.origind.pdf?sfvrsn=7d9465fc_0

TP-06-11-24BSN

in accordance with Article 3-1 of the Standard Specifications for Road and Bridge Construction, Standard Specifications for Road and Bridge Construction. Insurance companies must be authorized to do, /contracts/cpp-online- ordering/bidder-assist.shtm, Standard Specifications for Road and Bridge, Miles Contract Days: 691 Total Bridge Length: 0.000 Miles Letting Date: 06/11/24 Total Proposal, 0108- 1- MONITOR EXISTING STRUCTURES- INSPECTION AND SETTLEMENT MONITORING (41713255201) LS 1.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/jun11/tp-06-11-24bsn.pdf?sfvrsn=dc4ad0be_1

D5-08-06-24BSN

for Road and Bridge Construction, or as amended by the project Specifications Package or any, current edition of the Department’s Standard Specifications for Road and Bridge Construction, - ordering/bidder-assist.shtm, Standard Specifications for Road and Bridge Construction and the Special, Bridge Length: Letting Date: 08/06/24 Total Proposal Length: 1 . 720 Miles 0.000 Miles 1 . 720, - MONITOR EXISTING STRUCTURES- INSPECTION AND SETTLEMENT MONITORING (44880115201) LS 1.000 0110- 1

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2024/aug06/d5-08-06-24bsn.pdf?sfvrsn=cff0afe1_1

TP-05-06-25BSN2

in accordance with Article 3-1 of the Standard Specifications for Road and Bridge Construction, Standard Specifications for Road and Bridge Construction. Insurance companies must be authorized, Specifications for Road and Bridge Construction and the Special Provisions for instructions, Total Bridge Length: 0.000 Miles Letting Date: 05/06/25 Total Proposal Length: 1.058 Miles Contract, the addition of a wall to retain the southern end bent spill slope under existing Bridge No. 750285

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/may06/tp-05-06-25bsn2.pdf?sfvrsn=6027750d_1

E4X99BSN

(Contract) requires diligent inspection, effective management, and efficient performance of maintenance, consideration in accordance with Article 3-1 of the Standard Specifications for Road and Bridge, of the Department’s Standard Specifications for Road and Bridge Construction. Insurance companies must, -online-ordering/bidder-assist.shtm Standard Specifications for Road and Bridge Construction, : 1826 Total Bridge Length: 0.000 Miles Letting Date: 09/15/25 Total Proposal Length: 0.000 Miles

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/asset-maintenance/e4x99/e4x99bsn.pdf?sfvrsn=af97baaa_1

fdot-bed26-977-06-rpt

1.TRAVEL TIME ON CHILES RD TO WEBSTER (TOP) AND SAN JUAN RD TO BRYTE BEND BRIDGE (BOTTOM) ON NOVEMBER 9, ., 2023). Figure 1. Travel time on Chiles Rd to Webster (top) and San Juan Rd to Bryte Bend Bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bed26-977-06-rpt.pdf?sfvrsn=a353ab93_1

E4X61ExhibitA

the Department’s Standard Specifications for Road and Bridge Construction, are applicable, (CV), Smart Work Zone (SWZ), and Movable Bridge Notification System deployments,  Highway, the Department’s latest Standard Specifications for Road and Bridge Construction. The Contractor shall, Specifications for Road and Bridge Construction  Florida Statutes  Manual of Uniform Minimum Standards, Maintenance Typical scheduled preventive maintenance includes system inspection and other activities

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/rfp/e4x61/e4x61exhibita.pdf?sfvrsn=6328ffee_1

ICYMI: Governor Ron DeSantis Issues Updates on Hurricane Ian Recovery

receive power. On Wednesday, Governor DeSantis announced that bridge repairs were completed, of the Florida Small Business Emergency Bridge Loan Program, the initiation of the Army Corps of Engineers, Island. Fuel has been deployed to Pine Island via the Pine Island bridge that was completed, Florida. FDOT continues to assist with inspections on locally-owned bridges. Cut-and-toss crews, Florida, with 3,088 miles statewide completed. Access restored to Pine Island Bridge in just

https://www.fdot.gov/info/co/news/2022/10082022

D2-07-17-24BSN

with Article 3-1 of the Standard Specifications for Road and Bridge Construction, or as amended, Specifications for Road and Bridge Construction. Insurance companies must be authorized to do business, /cpp_online_ordering/bidder_assist.shtm , Standard Specifications for Road and Bridge Construction, Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000 Miles Letting Date, : 0.000 Miles Contract Days: 1095 Total Bridge Length: 0.000 Miles Letting Date: 07/17/24 Total

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2024/jul17/d2-07-17-24bsn.pdf?sfvrsn=136137c8_1

FDOT Continues to Take Transportation to New Heights in 2024

experienced significant infrastructure damage, including temporary bridge materials, emergency cut and toss strike teams, damage assessment teams, bridge inspection teams, project and contract management teams, in the transportation, road, and bridge industries. With a strategic goal to streamline the hiring, to the Department and industry, including Bridge Inspectors, Roadway Technicians, Transportation, resiliency with the construction of a new bridge over I-95, the widening of St. Lucie Boulevard

https://www.fdot.gov/info/co/news/2024/12202024

Pt2Ch20-073124_clean

visit. Information about current and former uses of the site (ascertained through visual inspection, involving bridge timbers, fender systems, or railroad ties that may have the potential to contain wood

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/pdeman/2024/pt2ch20-073124_clean.pdf?sfvrsn=bc7c2cd8_1

Part 667 Evaluation Report

.  Removal of slides.  Removal of drift piling up on bridges.  Placing riprap around piers and bridge, , then the Department will revisit its design standards. Using project files, detailed damage inspection reports (DDIRs), bridge records and by consulting with team members, the Design and Structures Maintenance, of approximately $8.6M. The Carrabelle River Bridge also received damage from Hurricane Michael. The damage from, of SR-83/US-331 in Walton County is the causeway south of the Clyde B Wells Bridge that crosses over

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/performance/part667.pdf?sfvrsn=3f341f30_22

4550000.origind

through 455-37 E. Structures (Other Than Bridge) Foundations- Auger Cast Piles, of the foundation soils or rock. Correct any deficiencies found by the divers. Upon completion of inspection, by the divers indicating the results of their underwater inspection before requesting authorization to place

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/internal/4550000.origind.pdf?sfvrsn=17756545_0

4550000.origind

through 455-37 E. Structures (Other Than Bridge) Foundations- Auger Cast Piles, of the foundation soils or rock. Correct any deficiencies found by the divers. Upon completion of inspection, by the divers indicating the results of their underwater inspection before requesting authorization to place

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/internal/4550000.origind.pdf?sfvrsn=10efaad8_0

2016_Precision Assessment of the Florida Texture Meter

specifications for road and bridge construction. Section 330 Hot Mix Asphalt – General Construction, were identified by visual inspection and their textures were measured by FTM. Results were classified using 2-sigma method, based on the visual inspection output. In order to minimize, are often primarily detected by visual inspection and examined using core density. Another way, ’s (2016) “Standard specifications for road and bridge construction. Section 330 Hot Mix Asphalt

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/research/reports/fcpe/2016_precision-assessment-of-the-florida-texture-meter.pdf?sfvrsn=b92f7958_1

oom_20240716_2023-Maintenance-Contract-Cost-Summary-by-Pay-Item

HR 6,005.000 $374,545.32 $62.37 0102 22 MAINTENANCE OF TRAFFIC- TEMPORARY BRIDGE CLOSURE (BOTH ENDS OF BRIDGE), MONITORING ED 7.000 $525.00 $75.00 0102 60 WORK ZONE SIGN ED 23,732.000 $110,047.43, 1 MONITOR EXISTING STRUCTURES- INSPECTION AND SETTLEMENT MONITORING LS 1.000 $45,020.34 $45,020.34, $3,233.00 0400 2 4 CONC CLASS II, BRIDGE SUPERSTRUCTURE CY 10.000 $4,400.00 $440.00 0400143 CLEANING, , SHOTCRETE CF 786.000 $172,920.00 $220.00 0403 2100 RESTORE SPALLED AREAS FOR CONCRETE BRIDGE DECKS CF

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/maintenance/cont/oom_20240716_2023-maintenance-contract-cost-summary-by-pay-item.pdf?sfvrsn=f1bf184_1
20 of 1780 results