3165 search results for intersection

Flexible Pavement Design Manual Redlines

area of signalized intersections, as shown in Figure 4.3. An exception to this is where both of the intersecting roads qualify for FC-5, then the entire intersection should use FC-5.  On limited, FOR MULTI-LANE NON-LIMITED ACCESS FACILITIES NON-SIGNALIZED INTERSECTION/MEDIAN OPENING - DO NOT PLACE, FOR MULTI-LANE NON-LIMITED ACCESS FACILITIES SIGNALIZED INTERSECTION - DO NOT PLACE FC-5, .) SHOULD BE CONTINUED THROUGH NOTE: FC-5 ON PAVED SHOULDERS WITHIN THE ENTIRE INTERSECTION

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/chief-briefs/flexible-pavement-design-manual-redlines.pdf?sfvrsn=45ccefbe_1

2024 ER FLDiv FAQ update

. The ramp merge, diverge, and intersection termini points with the crossroad(s) constitutes, of work only, as those activities are not considered “construction”. 19 IV. Signalized Intersections, intersection is expected for Emergency Repair versus Permanent Repair? a) Emergency Repairs for a signalized intersection would normally consist of labor, materials, and equipment necessary to provide, lanes of through traffic at an intersection, a turning signal head may be necessary in order to ensure

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/lap/pdfs/2024-er-fldiv-faq-update.pdf?sfvrsn=61da62b7_1

FHWA Emergency Relief FAQ

. The ramp merge, diverge, and intersection termini points with the crossroad(s) constitutes, of work only, as those activities are not considered “construction”. 19 IV. Signalized Intersections, intersection is expected for Emergency Repair versus Permanent Repair? a) Emergency Repairs for a signalized intersection would normally consist of labor, materials, and equipment necessary to provide, lanes of through traffic at an intersection, a turning signal head may be necessary in order to ensure

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/lp/federal-programs/fhwa-er/fhwa-emergency-relief-faq.pdf?sfvrsn=642a01b9_2

E3W17BidTabs

4,417.92 26.17000 7,536.96 0050 0102104 TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION, DETECTION AND MAINTENANCE, INTERSECTION 130.000 ED 19.00000 2,470.00 17.70000 2,301.00 20.13000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/bidtabs/2023/aug10/e3w17bidtabs.pdf?sfvrsn=6cd4d7d9_1

E1W16BidTabs

, INTERSECTION 200.000 ED 25.13000 5,026.00 51.00000 10,200.00 49.14000 9,828.00 0055 0102107 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION 200.000 ED 25.55000 5,110.00 40.00000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/bidtabs/2023/sep21/e1w16bidtabs.pdf?sfvrsn=84d1d1b7_1

20230718_449286-7_SR55_34050

North of SR 55 (US 19) /SR 121 Intersection 2' Paved Section No: 34050000 9.854 End MP: 10.300, of SR 55 (US 19) /SR 121 Intersection 2' Paved CR 336 Measured in feet from bridge Ramp from CR336

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/coringdata/d2/34/20230718_449286-7_sr55_34050.pdf?sfvrsn=7dba4c9e_1

E54C0BidTabs

: 0015 0102104 TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 56.000 ED 130.00000 7,280.00 1,500.00000 84,000.00 0020 0102107 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/bid-tabs/2023/oct03/e54c0bidtabs.pdf?sfvrsn=960938ec_1

E55C0BidTabs

AND MAINTENANCE, INTERSECTION 28.000 ED 250.00000 7,000.00 46.25000 1,295.00 2,000.00000 56,000.00 0020 0102107 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION 28.000 ED 250.00000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/bid-tabs/2023/nov07/e55c0bidtabs.pdf?sfvrsn=44b4c4cc_1

E3X02

SIGN, TEMPORARY ED 2,807.000 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED, , INTERSECTION ED 395.000 0102-115- TYPE III BARRICADE ED 1,580.000 0102-150- 2 RADAR SPEED DISPLAY UNIT ED

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2024/jan11/e3x02.pdf?sfvrsn=833a7a1d_1

E3X02-01-18-24

SIGN, TEMPORARY ED 2,807.000 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED, , INTERSECTION ED 395.000 0102-115- TYPE III BARRICADE ED 1,580.000 0102-150- 2 RADAR SPEED DISPLAY UNIT ED

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2024/jan18/e3x02-01-18-24.pdf?sfvrsn=6aeec8b9_1

E1W17BidTabs

8,178.11 0050 0102104 TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 750.000 ED 23.00000, AND MAINTENANCE, INTERSECTION 750.000 ED 23.00000 17,250.00 24.08000 18,060.00 46.91000 35,182.50 0060 0104

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/bidtabs/2024/jan18/e1w17bidtabs.pdf?sfvrsn=7368dda2_1

Z6164-R0

- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL PI 5.000 0632- 7- 2 SIGNAL CABLE- REPAIR, - 1- 11 PEDESTRIAN DETECTOR, FURNISH & INSTALL, STANDARD EA 6.000 0670- 4- 1 INTERSECTION CONTROL

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/lettings/2024/mar28/z6164-r0.pdf?sfvrsn=ea0ac8f3_1

E51F6BidTabs

0102104 TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 3,150.000 ED 25.83000 81,364.50 40.00000 126,000.00 0065 0102107 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/bid-tabs/2024/mar05/e51f6bidtabs.pdf?sfvrsn=60dd9ce_1

2023-3IISUHPC-islam_73ppt

monolithic interface.  Avoid wave front intersection, promote fiber distribution.  Apply internal mixing if unavoidable wave front intersection.  Prevent fiber flow conflicts with stress

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/structures/innovation/uhpc/2023-3iisuhpc-islam_73ppt.pdf?sfvrsn=43f02eea_1

451270 Technical POP Memo

/End MP: 11.612 to 15.286 Exceptions: Set from concrete intersection project 434986-1 NB: MP, . Old Construction Project Numbers: 434986-1 (2018) Rigid Intersection Improv MP 13.988-14.472

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/25122/451270-technical-pop-memo.pdf?sfvrsn=bb158d_1

FMTP TM7 Investment Element March 2021

and intersection improvements at US 17 Eldridge Ave., Old Orange Park Road and Wells Road to reduce, currently has access from US-1 0.1 miles south of the US-1/ SR-202 intersection (0.5 miles from I-95) and 0.6 miles south of the US-1/SR-109 intersection (1 mile from I-95). Approximately 85, -laning of US 231, with intersection improvements. The project includes widening US 231 from 4 to 6, OKALOOSA COUNTY LINE TO WASHINGTON COUNTY LINE This project includes multi-laning and intersection

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/rail/plans/fmtp/2020/investment-element/fmtp_investment-element_march2021.pdf?sfvrsn=bec05463_5

E8U84

AND MAINTENANCE, INTERSECTION ED 280.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 280.000 0102-115- TYPE III BARRICADE ED 15.000 0102-150- 1 PORTABLE REGULATORY

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/may21/e8u84.pdf?sfvrsn=9149297f_1

E200WBidTabs

4,590.00 20.09000 7,232.40 0045 0102104 TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION, AND MAINTENANCE, INTERSECTION 270.000 ED 1.16000 313.20 43.01000 11,612.70 0055 0102115 TYPE III

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/bid-tabs/2024/apr17/e200wbidtabs.pdf?sfvrsn=20570a3b_1

Z1129-R0

INTERSECTION, FURNISH & INSTALL PI 10.000 0634- 4-152 SPAN WIRE ASSEMBLY, F&I, TWO POINT, DIAGONAL PI, , FURNISH & INSTALL, STANDARD EA 50.000 0670- 4- 1 INTERSECTION CONTROL BEACON CONTROLLER ASSEMBLY

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2024/jun06/z1129-r0.pdf?sfvrsn=742081ca_1
20 of 3165 results