0060103.origind
discussed these changes? Roadway Design, Construction, and Specifications What other offices will be impacted by these changes? N/A Are changes needed to the PPM, Design Standards, SDG, CPAM or other manual? No Is a Design Bulletin, Construction Memo, or Estimates Bulletin needed? No Contact, maintains the QPL. This list provides assurance to Contractors, consultants, designers, and Department, Specifications and Design Standards. All required test reports must be conducted by an independent
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/internal/0060103.origind.pdf?sfvrsn=a8555247_0FDOT-ACEC-SoftwareTraining
or FDOT2024.C3D) is a suite of tools, resources and configuration settings necessary for designing, versions of specific CADD Software (e.g., OpenRoads Designer 10.12.02.04 is supported for use with FDOTConnect10.12.01.00). Additionally, each ACEC / FDOT Training Course is designed to be used, is designed to be used with a specific version of the FDOT CADD Suite and supported version of the base CADD platform (e.g., OpenRoads Designer or AutoCAD Civil 3D). If you do not have the correct
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cadd/downloads/webinars/files/general/fdot-acec-softwaretraining.pdf?sfvrsn=441b94c3_10060103-2FHWA
the APL. This list provides assurance to Contractors, consultants, designers, and Department personnel, and detailedrequired by the the applicable Specifications, and Design Standards, and APL approval processes. Unless defined otherwise in the Specifications, Design Standards, and APL approval process requirements, , Design Standards, and APL approval process requirements. The aApplications must be signed by a legally, designation (product name, product model/part number/style number, etc.) provided submitted
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/fhwa/0060103-2fhwa.pdf?sfvrsn=2bb244fc_4Standard Plans for Road and Bridge Construction
Next Roadway Design Office Roadway Criteria Drainage Design Quality Assurance Pavement Design Landscape Architecture Standard Specifications, Revision Submittal Process Roadway Design Bulletins Standard Plans Technical Expert List, Archives Design Standards Design Standards (FY 2017-18 and Earlier) Developmental Design, that are of excellentquality and value to roadway designers, contractors, and the traveling public
https://www.fdot.gov/design/standardplans/default.shtm2880302.impl
) SUBARTICLE288-3.2isdeletedandthefollowingsubstituted: 288-3.2ConcreteDesignMix:Submit the proposed design mix prior to production, on the “Concrete Mix Design” form, for the Engineer’s approval. Use only Cement Treated Permeable Base design mixes having prior approval of the Engineer. Furnishsufficientmaterial of each component when requested by the Engineer, for verification of the proposed mix design by the State, , submit one of the following with the design mix submittal: 1.Evidencefrom three sets of production
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/implemented/2880302.impl.pdf?sfvrsn=d4271371_0Chapter5s8Redline
Section 5.4, Final Project Material Certification. The JGS lists materials and designates the methods, items on the contract and project specific assignments. For Lump Sum and Design-Build contracts, Orders that designate a method of acceptance. If any exist, the PA is responsible to ensure, Materials Acceptance Resolution If a material is designated by the Materials Certification Review, are designated by selecting one of the following options: a) Asphalt Follow-up Sample Passed
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newhistory/chapter5s8redline.pdf?sfvrsn=b76cc5c0_9BDV30-943-20FinalReport
Station 75 Figure 6-2: Station House Apartments 76 Figure 6-3: Planned Designs for Station Pointe, 10-3: Proposed Design for Tremont Towers 126 Figure 10-4: Design Rendering of DPAC CNL Arts Plaza 127, 11-2: Conceptual Site Design for SunRail Station 136 Figure 11-3: Sand Lake Road TOD Overlay Zone, analyses. The research design employed a paired case study approach. Under this approach, these studies will be used to help shape the research design for this SunRail project. Dallas Area
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/transit/pages/bdv30-943-20finalreport.pdf?sfvrsn=84eafc87_0Errata Figure 902.2.1
Topic #625-000-002 FDOT Design Manual 902 - Estimated Quantities Report 902.2 Signature Page The signature page is typically an 11”x17” sheet (landscape). Place this page at the front of the EQ Report and include the information shown in Figure 902.2.1 . Show all FPID numbers, signed and sealed only by the Department’s lead designer or the lead consultant firm’s Engineer, errors or omissions. (3) Match the pay item numbers and quantities in Designer Interface
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/errata/errata-figure-902-2-1.pdf?sfvrsn=8ffdc13d_1SP1100601-i19130
CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES – GENERAL. (REV 9-10-07) (FA 2-15-08) (FY 2025-26) SUBARTICLE 110-6.1 is expanded by the following: The debris from bridge number ________________ on this Contract is designated to be delivered to ________________. This agency has requested, site. Assume sole responsibility for the coordination and delivery of the debris to the designated, of the debris to the designated location is included in the cost for demolition
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/workbook/sp1100601-i19130.pdf?sfvrsn=4c377bee_1SP1100601
REMOVAL OF EXISTING STRUCTURES – STRUCTURES TO BE REMOVED. (REV 9-10-07) (FA 2-15-08) (1-16) SUBARTICLE 110-6.1 is expanded by the following: Thedebrisfrom bridge number ________________ on this contract is designated to be delivered to ________________. This agency has requested delivery, . Assume sole responsibility for the coordination and delivery of the debris to the designated location, to the designated location is included in the cost for demolition
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/workbook/sp1100601.pdf?sfvrsn=fa92cee3_2SP1100601-i18509
CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES – GENERAL. (REV 9-10-07) (FA 2-15-08) (FY 2023-24) SUBARTICLE 110-6.1 is expanded by the following: The debris from bridge number ________________ on this Contract is designated to be delivered to ________________. This agency has requested, site. Assume sole responsibility for the coordination and delivery of the debris to the designated, of the debris to the designated location is included in the cost for demolition
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/workbook/sp1100601-i18509.pdf?sfvrsn=54a12901_2SP1100601-i19130
CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES – GENERAL. (REV 9-10-07) (FA 2-15-08) (FY 2024-25) SUBARTICLE 110-6.1 is expanded by the following: The debris from bridge number ________________ on this Contract is designated to be delivered to ________________. This agency has requested, site. Assume sole responsibility for the coordination and delivery of the debris to the designated, of the debris to the designated location is included in the cost for demolition
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/workbook/sp1100601-i19130.pdf?sfvrsn=7ff88120_1SP1100601-i17883
CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES – GENERAL. (REV 9-10-07) (FA 2-15-08) (7-22) SUBARTICLE 110-6.1 is expanded by the following: The debris from bridge number ________________ on this Contract is designated to be delivered to ________________. This agency has requested, . Assume sole responsibility for the coordination and delivery of the debris to the designated, to the designated location is included in the cost for demolition
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/workbook/sp1100601-i17883.pdf?sfvrsn=3b924038_2SP1100601-122
CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES – GENERAL. (REV 9-10-07) (FA 2-15-08) (1-22) SUBARTICLE 110-6.1 is expanded by the following: The debris from bridge number ________________ on this Contract is designated to be delivered to ________________. This agency has requested, . Assume sole responsibility for the coordination and delivery of the debris to the designated, to the designated location is included in the cost for demolition
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/workbook/sp1100601-122.pdf?sfvrsn=dee7d06b_2SP1100601-721
CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES – GENERAL. (REV 9-10-07) (FA 2-15-08) (7-21) SUBARTICLE 110-6.1 is expanded by the following: The debris from bridge number ________________ on this Contract is designated to be delivered to ________________. This agency has requested, . Assume sole responsibility for the coordination and delivery of the debris to the designated, to the designated location is included in the cost for demolition
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/workbook/sp1100601-721.pdf?sfvrsn=ad3f59e2_2SP1100601-i16417
CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES – GENERAL. (REV 9-10-07) (FA 2-15-08) (1-21) SUBARTICLE 110-6.1 is expanded by the following: The debris from bridge number ________________ on this Contract is designated to be delivered to ________________. This agency has requested, . Assume sole responsibility for the coordination and delivery of the debris to the designated, to the designated location is included in the cost for demolition
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/workbook/sp1100601-i16417.pdf?sfvrsn=4001b3a5_2SP1100601
CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES – GENERAL. (REV 9-10-07) (FA 2-15-08) (7-20) SUBARTICLE 110-6.1 is expanded by the following: The debris from bridge number ________________ on this Contract is designated to be delivered to ________________. This agency has requested, . Assume sole responsibility for the coordination and delivery of the debris to the designated, to the designated location is included in the cost for demolition
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/workbook/sp1100601.pdf?sfvrsn=78d75f69_2SP1100601
CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES – GENERAL. (REV 9-10-07) (FA 2-15-08) (1-20) SUBARTICLE 110-6.1 is expanded by the following: The debris from bridge number ________________ on this Contract is designated to be delivered to ________________. This agency has requested, . Assume sole responsibility for the coordination and delivery of the debris to the designated, to the designated location is included in the cost for demolition
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/january-2020/workbook/sp1100601.pdf?sfvrsn=55259ed1_2SP1100601
CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES – GENERAL. (REV 9-10-07) (FA 2-15-08) (7-19) SUBARTICLE 110-6.1 is expanded by the following: The debris from bridge number ________________ on this Contract is designated to be delivered to ________________. This agency has requested, . Assume sole responsibility for the coordination and delivery of the debris to the designated, to the designated location is included in the cost for demolition
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/workbook/sp1100601.pdf?sfvrsn=66a6fb26_2SP1100601
CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES – GENERAL. (REV 9-10-07) (FA 2-15-08) (1-19) SUBARTICLE 110-6.1 is expanded by the following: The debris from bridge number ________________ on this Contract is designated to be delivered to ________________. This agency has requested, . Assume sole responsibility for the coordination and delivery of the debris to the designated, to the designated location is included in the cost for demolition
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/workbook/sp110060192d1991a434d44839e5d6b493c553347.pdf?sfvrsn=de7e6a5d_0