9600100-722impl

. 960-3.1.3 System Testing: In lieu of performing PT system tests witnessed by and/or performed, and witnessed by the Engineer. 960-3.2 Testing Requirements: 960-3.2.1 Component and System Tests, Assembly Pressure Test: In addition to the other testing specified in this Section, test all filler, for external PT systems. 960-3.2.3 External PT Systems Pressure Test: In addition to the other testing, to the other testing specified in this Section, test all sizes of internal PT systems with flexible filler

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/implemented/9600100-722impl.pdf?sfvrsn=4961e39f_2

9320203.resp

need to go back to just having the bearing pad companies provide us certification of test lab results of the bearing pad test. The Department needs to show us that they have had a problem. To have bearing pads manufactured and delivered to the job site and then to have the Department runs tests, manufacturers coming into the market lets have them get approved first??? Response: Disagree. Testing, are not tested periodically, there is a much higher risk that these structurally critical elements

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/comments-responses/9320203.resp.pdf?sfvrsn=f04e0542_0

4550503.comm

Testing, then CSL testing will be required with no separate payment.” The sentence currently added to 455-23.10 does not capture this intent. “When CSL testing is requested by the Engineer, the quantity of CSL tests to be paid for will be the number of drilled shafts accepted based on CSL tests.” If this sentence is intended to address additional testing requested by the Engineer, it should, ; if the testing reveals no problem, the testing is paid as unforeseen work” Per the discussion, the CSL

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/comments-responses/4550503.comm.pdf?sfvrsn=91e7d35b_0

Section83V2redln

they are responsible for verification inspection and testingwithin their jurisdiction. The compiled data must, of the QC, and verification, and independent assurance inspection and testing must be increased, inspection and testing will be reduced to normal when a revised QC pPlan has been approved and the DMRO, with increased rates of QC, and verification and independent assurance inspection and testing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/materials-manual/redline/section83v2redln.pdf?sfvrsn=8b7ad2b6_1

2040000.impl

construction and maintenance operations by applying water or other dust control materials. 204-7 Testing Surface. Testthesurfaceinaccordancewiththerequirements of 200-6. 204-8 Priming and Maintaining

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan08/files/2040000.impl.pdf?sfvrsn=9655d55c_0

SP2040000

construction and maintenance operations by applying wate 204-7 Testing Surface. Testthesurfaceinaccordancewiththerequirements of 200-6. 204-8 Priming and Maintaining. Meettherequirements of 200-8. 2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2009/files/sp2040000.pdf?sfvrsn=8dfd9a7b_0

SP2040000

and maintenance operations by applying water or other dust control materials. 204-7 Testing Surface. Testthesurfaceinaccordancewiththerequirements of 200-6. 204-8 Priming and Maintaining

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2008/files/sp2040000.pdf?sfvrsn=8f5585d9_0

SP2040000

construction and maintenance operations by applying wate 204-7 Testing Surface. Testthesurfaceinaccordancewiththerequirements of 200-6. 204-8 Priming and Maintaining. Meettherequirements of 200-8. 2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2010/files/sp2040000.pdf?sfvrsn=d8f26e86_0

SP2040000

and maintenance operations by applying water or other dust control materials. 204-7 Testing Surface. Testthesurfaceinaccordancewiththerequirements of 200-6. 204-8 Priming and Maintaining

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2009/january-2009/workbook/sp2040000.pdf?sfvrsn=abbeecff_0

SP2040000

and maintenance operations by applying water or other dust control materials. 204-7 Testing Surface. Testthesurfaceinaccordancewiththerequirements of 200-6. 204-8 Priming and Maintaining

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2010/january-2010/workbook/sp2040000.pdf?sfvrsn=863f9164_0

9160300-723 FHWA

to a SMO approved laboratory for testing. Provide test results to the SMO. 4.Use the newly, emulsions, the cement mixing test will be waived. For tack products, the minimum testing requirements, . 3.Submit a sample of the blended binder to a SMO approved laboratory for testing. Provide test results, : Specification compliance testing results shall be reported for the tests in Table 916-1 below, unless noted, requirements: 1. The intermediate test temperature at 10 rad/sec. for the Dynamic Shear Rheometer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/fhwa/9160300-723-fhwa.pdf?sfvrsn=ba35b34f_1

4550021FHWA

: Employ a professional testing laboratory, or Specialty Engineer with prior load test experience, to conduct the load test in compliance with these Specifications, to record all data, and to furnish reports of the test results to the Engineer except when the Contract Documents show that the Department will supply a Geotechnical Engineer to provide these services. Perform the load test, General: Employ a professional testing laboratory, or Specialty Engineer with prior load test experience

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan06/files/4550021fhwa.pdf?sfvrsn=8e68e631_0

fm5-534

inch. 5. REPORT 5.1 Test date 5.2 Tester/Technician Identification Number (TIN) 5.3 Location of test (LOT Number, Station Range, Test Station, Offset) 5.4 Measured depth, in inches 5.5 Disposition,  FLORIDA DEPARTMENT OF TRANSPORTATION State Materials Office 5007 NE 39 th Avenue Gainesville, Florida 32609 July 22, 2025 FM 5-534 1 Florida Method of Test for Thickness Determination in Soil-Aggregate Bases Designation: FM 5-534 1. SCOPE This method presents a procedure

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/administration/resources/library/publications/fstm/methods/fm5-534.pdf?sfvrsn=b981384b_3

9910100-723impl

: The yellowness index shall not exceed 12, tested in accordance with ASTM E313. The daytime 45 degrees, 0 degrees luminance factor, Cap Y, shall be a minimum of 70, tested in accordance with ASTM E1349, of 60, tested in accordance with ASTM E1349. 991-1.4 Retroreflective Sheeting: The color, inch below the top of post. 991-1.5 Product Testing: Manufacturers seeking evaluation of Tubular Markers must include test reports from the National Transportation Product Evaluation Program

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/implemented/9910100-723impl.pdf?sfvrsn=889c6d61_2

3460000.origind

the load designated for QC testing is being tested.  Revised concreting in cold weather to remove, testing before mix design approval. Take the resistivity test specimens from the concrete, the Engineer at least 48 hours before performing such tests. Perform slump loss testing, of other core samples. Perform surface resistivity tests on the core samples or test cylinders, factor determined by the concrete producer for each mix design to be tested. Record and certify test

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan13/files/3460000-origind.pdf?sfvrsn=e1555f7b_4

section61-6112

shall include the quality control test methods, inspections, and minimum frequency of tests, history of the manufacturer. Index tests derived from existing test methods may be developed, ) FloridaDepartmentofTransportationStandardSpecifications for Road and Bridge Construction C) AmericanSocietyfor Testing and Materials (ASTM) Standard Test Methods and Specifications, Philadelphia, Pennsylvania D) American A s s o c i a t i o n o f S t, Specifications, and Part II Tests, Washington, D.C. E) QualifiedProductsList

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2012/january-2012/materials-manual/section61-6112.pdf?sfvrsn=c734ffc6_1

9290000Orign

completion of tests and to delete “Gainesville” from throughout the Section, supplier shall submit the proposed quality control plan, certified test reports from an approved, and satisfactory verification of the test results, the plant will be placed on the Department’s list of active, control plan approval and to require cementitious material shipments to be individually tested, , inconsistent quality control data, or failure of quality control or verification test results. 929-1.2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan06/files/9290000orign.pdf?sfvrsn=61b3bbe9_0

SS3370000

Providecertifiedtestresultsforeachbatchoffibermate omplicewi thea canthbove tests. 337-2.6.2 Cellulose Fibers: U rem 1.Fiberlength, compliance with the above tests. 337-3 General Composition of Mixes. 337-3.1 General: Use, the spread rate into the acceptable range. 337-6 Accep cep e requirements d . Testigin ac ed ccepted, T312-04 and FM 1-T 209 (and conditioning prior to testing) will not be required as part of 334-5.1.1.1, Individual Test Tolerances for FC-5 Production: Terminat the LOT if any of the following Quality

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2009/files/ss3370000.pdf?sfvrsn=5f39c4f8_0

3340504FHWA

when evaluating pavement material that had failing test results Please review and transmit your, substituted: 334-5.4.3 Roadway Sampling and Testing Requirements: Obtain five 6 inch diameter roadway cores, . Test these QC samples for density (Gmb) in accordance with 334-5.1.1. Obtain a minimum of three, not perform density testing for acceptance in a sublot if the plant random sample for that sublot has, (within three days of coring); and trim the cores to the proper thickness prior to density testing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/fhwa/3340504fhwa.pdf?sfvrsn=510a9e24_1

1600403.FHWA

: 1 6 0 0 4 0 3 S t a b i l i zing – Department Verification Testing Dear Ms. Gourdine: We, will be collected by the Engineer for Limerock Bearing Ratio (LBR) verification testing. Please review, . StateConstructionEngineer 1600403 All Jobs STABILIZATION-DEPARTMENT VERIFICATION TESTS. (REV 12-29179-09, than the location where the sample was collected in 160-4.3.1.3, and test the Stabilized Subgrade for determination of the LBR in accordance with FM 5-515. The Engineer will select test locations

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul10/files/1600403.fhwa.pdf?sfvrsn=57e0b5eb_0
20 of 9274 results