3723 search results for fla

Florida Department of Transportation Wins 2021 Perpetual Pavement Award

easily meets the criteria for a PPA: By Performance and has served the traveling public in Fla. well, is critical to providing a sustainable quality of life, and Fla. continues to lead the nation in maintaining

https://www.fdot.gov/info/co/news/2022/06012022

E53F4

 Florida Department of Transportation Bid Solicitation Notice and Approximate Quantities Letting: 05240904 Call Order:003 Proposal:E53F4 District:05 Counties: FLAGLER Road Name:SR A1A Limits, 8th St to N 18th St in Flagler County. PREQUALIFICATION REQUIRED Call Order: 003 Proposal: E53F4, CROSSWALK: RECTANGULAR RAPID FLASHING BEACON, FURNISH & INSTALL- AC, COMPLETE SIGN ASSEMBLY- BACK TO BACK AS 2.000 0654- 2- 60 MIDBLOCK CROSSWALK: RECTANGULAR RAPID FLASHING BEACON, REMOVE COMPLETE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2024/sep04/e53f4.pdf?sfvrsn=7f21f89d_1

QF-635-01-1 ANSI SCTE 77 6.2-7.7 Checklist

are for Flammability. 11 6.5 Three coupons with dimensions of 25 mm (1 in) wide by 125 mm (5 in) long by finished, is transmitted using a flat, rigid steel plate(s) that yields a surface area of 3 ft2, based,       The following criteria are for Cover Impact. 38 7.5 Cover is placed on a flat rigid surface

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/traf_sys/compliance-matrices-2022/qf-635-01-1-ansi-scte-77-6-2-7-7-checklist.docx?sfvrsn=434ddfd3_1

2023 BOE Manual

Type flags in the BOE, allowing for easy identification of items that may require additional, includes valid (effective/obsolete) dates. A Spec flag is assigned to all pay items for non-standard work, , Trial Items 1000s Utilities 2.8.3 Specification Flags on Pay Items Several letters or “flags, The Spec-Type flags in the BOE are indications of the level of pay item support that were likely necessary, in the BOE, but the presence of a flag can still indicate that further due diligence may be required

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/estimates/publications/basis-of-estimates-manual/2023-boe-manual.pdf?sfvrsn=8dd363e4_1

441700-1.Cove Rd from SR-76_Kanner Hwy to SR-5_US-1 GeoReport

plains on marine terraces on flatwoods. The parent material 2 Geotechnical Services - PD&E TSFGeo, of the map unit. Slopes are 0 to 2 percent. This component is on flatwoods on marine terraces, percent. This component is on flatwoods on marine terraces on coastal plains. The parent material, . Slopes are 0 to 2 percent. This component is on flatwoods on marine terraces on coastal plains, . Excellent exposures occur in Flagler County in Washington Oaks State Park, in Martin County

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cove-road-study/441700-1-cove-rd-from-sr-76_kanner-hwy-to-sr-5_us-1-georeport.pdf?sfvrsn=42e3d65b_1

9900200-723FHWA

maintenance for Automated Flagger Assistance Devices signs. 2. The battery shall be equipped, for Automated Flagger Assistance Devices, the display assembly shall be equipped with an automatic dimming, . The display panel background and frame for the display assembly shall be painted flat black and shall meet, mounted units are required for regulatory signs and radar speed display units. Automated Flagger, Eligibility Letters ARTICLE 990-15 is deleted and the following substituted: 990-15 Flagger Equipment

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/fhwa/9900200-723fhwa.pdf?sfvrsn=1c8d4d40_1

9160000.impl

) inTrichloroethylene Minimum 99.0% (Not applicable for PG76-22(ARB)) FlashPoint, AASHTOT48-06(2010) ClevelandOpen, ) FlashPoint COC minimum 410ºF Viscosity 140ºF 6 0 0 / 1 0 0 0 c S t ( a ) E P R - 1 P r i m e s h a l l n o

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/implemented/9160000.impl.pdf?sfvrsn=1451f4c1_0

4130000.impl

24) Lessthan350g/l FlashPoint(ASTM3278) Greaterthan200°FSETA ResistancetoChlorideionpenetration, ) 14-20cpsat50rpm Density(ASTM D1481) 8.5-9.0lb/glat77 o F FlashPoint(ASTMD93) >200 o F

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/implemented/4130000.impl.pdf?sfvrsn=4ad26a00_0

CM-650-03 Vehicular Traffic Signal Assembly Backplate

erosion, flaking, or oxidation will not occur within the normal life expectancy under typical, to 2.5 inches or less, when influenced by high wind conditions, and return to a flat state after

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/traf_sys/compliance-matrices-2022/cm-650-03-vehicular-traffic-signal-assembly-backplate.docx?sfvrsn=7c0c17e4_1

Chapter7s4Redline

Resource (FLAIR) “6”s” line by the requested amount and re-encumber on a new FLAIR “6”s” line, Management (CFM) system. (4) The FLAIR contract amendment file will be updated to indicate, is processed through FLAIR and then the Unilateral Payment can be executed. The funds for the Unilateral

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newhistory/chapter7s4redline.pdf?sfvrsn=edc444e6_3

Chapter7s4

be in an executed status. (3) The DCE or designee will reduce the Florida Account Information Resource (FLAIR) “6s, Contingency Supplemental Agreements and 7-4-4 Work Orders a new FLAIR “6s” line with a Function Code/ Work, ) system. (4) The FLAIR contract amendment file will be updated to indicate the change. The funds, encumbrance request will be approved by the CFM system when the encumbrance is processed through FLAIR

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/chapter7s4.pdf?sfvrsn=1498bdfa_6

CPAM 7.4 Clean 2022-PrC

be in an executed status. (3) The DCE or designee will reduce the Florida Account Information Resource (FLAIR) “6s, Contingency Supplemental Agreements and 7-4-4 Work Orders a new FLAIR “6s” line with a Function Code/ Work, ) system. (4) The FLAIR contract amendment file will be updated to indicate the change. The funds, encumbrance request will be approved by the CFM system when the encumbrance is processed through FLAIR

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/cpam-7-4-clean-2022-prc.pdf?sfvrsn=661b3ce7_3

8-Fall 2023 Construction Academy MOT Session

changes are performed with minimal disruption to work activities • A list of trained flaggers must, and removal of pavement markings • Crash reporting • Night work • Flaggers • Motorist Awareness, , flaggers, and other personnel responsible for work zone related transportation management, Department of Transportation Process Review Findings Low profile barrier did not have proper flare

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2023-construction-academy/fall-2023/8-fall-2023-construction-academy-mot-session.pdf?sfvrsn=1d4f5d28_2
20 of 3723 results