3761 search results for REPORT NUMBER

2018.02.01-Final-MPOAC-Governing-Board-MinutesFEB18

on transportation revenue. The final report is due in October 2019.  Mr. Reichert discussed, suggestions for improved coordination. The report is due in December 2019.  Mr. Reichert provided, and that the statewide numbers are now available and should be disaggregated to the County level within the next, on the activities of FHWA as follows:  Ms. Jacobs noted that a new report was issued in November 2017 called “Trends and Statewide Long Range Transportation Plans for an Emerging Topics in 2017.” The report

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2018/2018-02-01-final-mpoac-governing-board-minutesfeb18.pdf?sfvrsn=68d54adf_1

FL_FY24_Grant Application - Amendment 1 - 01.12.24 FINAL

Project Number: CP-2024-00407 Federal Funding Source: 402 Local Benefit: $0 Planning, , Activity, and Participation Project Number: CP-2024-00414 Federal Funding Source: 402 Local Benefit, : Sumter County Sheriff’s Office Project Number: CP-2024-00293 Federal Funding Source: 402 Local, ) Project Number: (See below) Federal Funding Source: 402 Local Benefit: $230,000 Planning, Subrecipient Project Name Project Number Local Benefit Budget Florida Department of Transportation

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/safety/3-grants/fl_fy24_grant-application---amendment-1---01-12-24-final.pdf?sfvrsn=12c39b90_1

Section9.2-051019_1-20WB

identification numbers or part numbers may or may not compare with the serial number, Acceptance and Certification system (MAC) will provide a complete report of this information, number and aggregate grade shall be included in the identification. Aggregates shall be measured, equipment accuracy checks. Ensure that the report provided by the qualified company performing, and other Contract Documents . Maintain a copy of the report corresponding with the current

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/january-2020/materials-manual/section9-2-051019_1-20wb.pdf?sfvrsn=55018c2f_1

E1X04-Addendum No 5

NUMBER FIVE PROJECT DESCRIPTION: I-75 at Sumter Blvd. & I-75 at Toledo Blade Interchange, to Addendum Five is the RFP dated December 20, 2024. Acknowledge receipt of Addendum Number Five, Improvements Sarasota County Financial Projects Number(s): 452356-1-52-01, 452357-1-52-01 Federal Aid Project Number(s): D124-049-B, D124-050-B Contract Number: E1X04 ADDENDUM No. 54 Request, Concept Plans_8-26-24_reduced A22 - Drainage analysis 452356-1 I-75 Drainage Report_SUBMITTAL_010924

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1x04/e1x04-addendum-no-5.pdf?sfvrsn=8f2a7c11_1

5560303.FHWA

substituted: 556-6 Documentation Requirements. 556-6.1 Boring Path Report: FurnishSubmit a Bore Path Report to the Engineer within 14 days of the completion of each bore path. Submit the As-Built, for directional boring work until the Bore Path Report has been delivered to the Department. Include the following information in the report: 1.Locationofprojectandfinancialprojectnumber including the Permit Number when assigned. 2.Name of person collecting data, including title, position

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/fhwa/5560303.fhwa.pdf?sfvrsn=b4422f44_0

SS4300000

to continuation of pavement. Forpipe48inchesorlessindiameter, provide the Engineer a video DVD and report, report in terms of x and y axis. 5. F l a t a n a l y s i s r e p o r t . 6.Representativediameter, the project number, the structure number corresponding to the structure number on the set of plans, mandrels which are rigid, nonadjustable, odd-numbered legged (minimum 9 legs) having a length not less, . Consecutively number the joints on both the interior and exterior surfaces of each joint

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2007/january-2007/workbook/ss43000007889f24b640643be8d981bd6a57a5acf.pdf?sfvrsn=37cd03d5_0

SS4300000

. Forpipe48inchesorlessindiameter, provide the Engineer a video DVD and report using low barrel, . 4 . D e f l e c t i o n measurements a n d g r a p h i c a l diameter analysis report in terms of x, identification before each section of pipe filmed. The identification will include the project number, the structure number corresponding to the structure number on the set of plans for the project, size, are rigid, nonadjustable, odd-numbered legged (minimum 9 legs) having a length not less than its nominal

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2009/january-2009/workbook/ss4300000.pdf?sfvrsn=634fe8a3_0

FL_HSP_FY2023 - Amendment 2

. . . . ...................................................................................... 54 PERFORMANCE REPORT, the number of fatalities and serious injuries with the ultimate target of zero fatalities. Florida, . The chart below represents the total number of concept papers received and subgrants awarded, the number of serious injuries and fatalities caused by crashes involving unsecured loads on non, traffic safety challenges and the geographic areas of the state that represent the highest number

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/safety/3-grants/hsp-annual-reports/fl_hsp_fy2023---amendment-2.pdf?sfvrsn=79da1700_1

FL_HSP_FY2023 - Amendment 1

PERFORMANCE REPORT, the number of fatalities and serious injuries with the ultimate target of zero fatalities, represents the total number of concept papers received and subgrants awarded for FY 2023. FDOT, annually reviews the number of serious injuries and fatalities caused by crashes involving, the highest number of crashes, serious injuries, and fatalities. The Florida Highway Safety Matrix ranks

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/safety/3-grants/hsp-annual-reports/fl_hsp_fy2023---amendment-1.pdf?sfvrsn=52cd6a54_1

Section 9.2 VII-122

is required to have a separate QC Plan and Plant Number, provided that concrete mixers are fed, ) will provide a complete report of this information. Upon meeting all criteria, the Plant may, . Each source must be properly marked and identified. Department designated, approved source number, that the report provided by the qualified company performing the check includes the date of inspection, a copy of the report corresponding with the current certificate of inspection at the Plant. Affix

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/materials-manual/section-9-2-vii-122.pdf?sfvrsn=401b5686_2

Section9.2V2-721cln

a separate QC Plan and Plant Number, provided that concrete mixers are fed by independent processing, ) will provide a complete report of this information. Upon meeting all criteria, the Plant may be changed, . Each source must be properly marked and identified. Department designated, approved source number, the right to be present during all equipment accuracy checks. Ensure that the report provided, to the FDOT Specifications and other Contract Documents . Maintain a copy of the report

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/materials-manual/section9-2v2-721cln.pdf?sfvrsn=acbd2e93_2

Section92V2-722cln

in the same physical address: a. Each Plant is required to have a separate QC Plan and Plant Number, and Certification system (MAC) will provide a complete report of this information. Upon meeting all, number and aggregate grade shall be included in the identification. Aggregates shall be measured, . Ensure that the report provided by the qualified company performing the check includes the date, . Maintain a copy of the report corresponding with the current certificate of inspection at the Plant

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/materials-manual/section92v2-722cln.pdf?sfvrsn=611ec496_2

Section92V2-724cln

in the same physical address: a. Each Plant is required to have a separate QC Plan and Plant Number, and Certification system (MAC) will provide a complete report of this information. Upon meeting all, designated, approved source number and aggregate grade shall be included in the identification, equipment accuracy checks. Ensure that the report provided by the qualified company performing, Contract Documents . Maintain a copy of the report corresponding with the current certificate

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/materials-manual/section92v2-724cln.pdf?sfvrsn=74f18d00_1

SunGuide and Lonestar Review

. The TMC is a general way to refer to a user, as there are a diverse number of roles and needs within, the SunGuide software and report information such as health, status, and any operational data or responses

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/cmtp/sunguide/whitepapers/sunguide-and-lonestar-review.pdf?sfvrsn=a68c2888_1

23I-011 GoPasco Final Report_signed

23I-011 GoPasco Final Report_signed, . Sullivan, Inspector General Audit Report No. 23I-011 September 21, 2023 Pasco County Public, Department of Transportation Advisory Report No. 23I-011 ● Page 2 of 18 TABLE OF CONTENTS, of Transportation Advisory Report No. 23I-011 ● Page 3 of 18 BACKGROUND AND INTRODUCTION Public transit, of Inspector General Florida Department of Transportation Advisory Report No. 23I-011 ● Page 4 of 18, Department of Transportation Advisory Report No. 23I-011 ● Page 5 of 18 RESULTS OF REVIEW We

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ig/reports/23i-011-gopasco-final-report_signed.pdf?sfvrsn=e7000867_1

FL_FY24_Grant Application - Final 07.31.23

and Public Policy Project Number: CP-2024-00407 Federal Funding Source: 402 Local Benefit: $0, for Mobility, Activity, and Participation Project Number: CP-2024-00414 Federal Funding Source: 402, Subrecipient: Sumter County Sheriff’s Office Project Number: CP-2024-00293 Federal Funding Source, ) Subrecipient: (See below) Project Number: (See below) Federal Funding Source: 402 Local Benefit: $230,000, : $230,000 Subrecipient Project Name Project Number Local Benefit Budget Florida Department

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/safety/3-grants/fl_fy24_grant-application---final-07-31-23.pdf?sfvrsn=6061430e_1

42612-Governing-Board-Minutes

was approved unanimously. 3. Executive Director’s Report Mr. Howard Glassman, MPOAC Executive Director, provided a status report on current MPOAC finances, reporting that roughly 75% of current, -Alabama, Okaloosa- Walton, Bay County TPOs, as the incoming chair. 4a. FDOT Report Kathy Neill, FDOT, provided the FDOT report. The Freight Mobility and Trade Plan will include a policy element, Report Lee Ann Jacobs, Federal Highway Administration (FHWA), reported that that the current Federal

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2012/42612-governing-board-minutes.pdf?sfvrsn=7bde92d0_1

E1X04Addendum003

NUMBER THREE PROJECT DESCRIPTION: I-75 at Sumter Blvd. & I-75 at Toledo Blade Interchange Improvements, is the RFP dated December 5, 2024. Acknowledge receipt of Addendum Number Three in the space provided, Financial Projects Number(s): 452356-1-52-01, 452357-1-52-01 Federal Aid Project Number(s): D124-049-B, D124-050-B Contract Number: E1X04 ADDENDUM No. 23 Request for Proposal-Addendum No. 23 I-75, 452357-1-52-01_Final RFP Concept Plans_8-26-24_reduced A22 - Drainage analysis 452356-1 I-75 Drainage Report

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1x04/e1x04addendum003.pdf?sfvrsn=49e22945_1

July 2022 Update Summary

the summary of pay items statement because it will be included in the Estimated Quantities Report, items are included in the Estimated Quantities Report and will no longer be listed in the Plans, for excessive mix design laboratory trial batches. Requirements on the number of compressive strength, . The requirements of the number of compressive strength cylinders for a LOT has tobeclarified, whether it is only, . The requirements of the number of compressive strength cylinders for a LOT has been clarified, which

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/july-2022-update-summary.pdf?sfvrsn=4a0b2dd5_2

Liaison Training Meeting Summary_07252023 (Final)

. MPO Invoice Summary: Must follow a prescribed format 2. Itemized Detail Expenditure Report, (FHWA) funding source • Expenditure category • Running budgets 3. MPO Progress Report: No required, and Itemized Expenditure Detail Report must match. • The use of the indirect cost rate, between the Progress Report and Invoice. • Common issues identified by the Office of Inspector General, submit a Progress Report even if there has been no activity. The MPO can acknowledge if it has, or has

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/policy/metrosupport/meetings-and-webinars/liaison-training-meeting-summary_07252023-(final).pdf?sfvrsn=8d2ef7aa_1
20 of 3761 results