2708 search results for apl

1020302.FHWA-REVISED

) or the Department’s Approved Products List (APL). Erect the required temporary traffic control devices, that are on the QPL or the APL. Immediately remove or cover any devices that do not apply to existing conditions, of Category IV devices for inclusion on the QPL or APL must comply with the requirements of Section, for proper application, field assembly and installation. Ensure that tThe QPL or APL number, on the Department’s Qualified Products List (QPL) or the Department’s Approved Products List (APL). Erect

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/fhwa/1020302.fhwa-revised.pdf?sfvrsn=a4c28839_0

1020302.FHWA

Approved Products List (APL). Erect the required temporary traffic control devices to prevent any, or the APL. Immediately remove or cover any devices that do not apply to existing conditions, IV devices for inclusion on the QPL or APL must comply with the requirements of Section 990, application, field assembly and installation. Ensure that tThe QPL or APL number, on the Department’s Qualified Products List (QPL) or the Department’s Approved Products List (APL

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/fhwa/1020302.fhwa.pdf?sfvrsn=4e548c9f_0

SpecsHandbk

that products are available on the Approved Products List (APL). 2-5 INTERMEDIATE REVIEW, . Specifications Handbook REV 12/2024 5 If material requirements are modified by an MSP, existing APL products, , per the FDOT Design Manual (FDM) 110.4.1. These products must be listed on the APL. 3-4 BLANKET, sketches, pictures or drawings in a TSP • Refer to the Approved Products List (APL, These products must be listed on the APL. • Verify if the materials are subject to Build America, Buy America

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/resources/guidance/specshandbk-6-18-25.pdf?sfvrsn=f3d82b0d_3

Structural Materials_09-29-2025

accessories Approved Products List (APL) Materials for Concrete Repair (SS 930) Post-Te nsioning, (APL). • Strands for Prestressing (Post-Te n sioning). • Steel Bars for Prestressing (Post-Te n, Listing (APL) for Approach Te r m inal Assemblies, Delineators, and Composite Offset Blocks, List (APL) Curing Compound (SS 925) Epoxy Bonding Compound (SS 926) Materials for Concrete, ) APL Tra c k i n g Create a MAC entry fo r e a c h P roduct Used • Record APL Product

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2025-fall-construction-academy/structural-materials_09-29-2025.pdf?sfvrsn=ef9100ff_1

9621001FHWA

APL requirements. Please review and transmit your comments, if any, within two weeks (10 business, shall be one of the products listed on the Department’s Approved Product List (APL). Manufacturers, is specified, provide galvanizing in accordance with the contract documents. Table 962-16 APL, compliance with the material requirements of this Section. Product Sample (for APL listing) A sample, of the products listed on the Department’s Approved Product List (APL). Manufacturers seeking

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/fhwa/9621001fhwa.pdf?sfvrsn=1261d140_1

SPI-536-001

Approach Terminal products listed on the APL. c. Length of End Treatment, Custom Design Lengths: Where, - specific 'Design Length' as shown on the manufacturer's APL drawings. The Standard Plans Instructions, requirement per manufacturer's APL Drawing (e.g. "Device requires a Design Length ≤ 25 Ft. per the manufacturer's APL Drawing"). d. Grading and Clear Area: Provide for the extended grading and front slope, , verify availability of applicable options on the APL (MASH generally required). 3. Crash Cushions

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/spi/spi-536-001.pdf?sfvrsn=586b4e8_1

2026FDM110InitialEngineering

the Approved Product List (APL) number, and/or invite the manufacturer to apply for listing on the APL. Upon approval of Sole Sourced Product, update the Contract Documents, including approved, installation. Exceptions exist for temporary products and manufactured products, as identified on the APL, . (2) Proprietary products not on the APL. (3) Sole sourced products not on the APL. (4) Special, included on the APL that are domestically sourced. (5) Items covered in the Standard Plans including

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm110initialengineering.pdf?sfvrsn=8e44dc8_15

2026FDM110InitialEngineering

. The State Product Evaluation Administrator will verify the Approved Product List (APL) number, and/or invite the manufacturer to apply for listing on the APL. Upon approval of Sole Sourced Product, products, as identified on the APL. While Specification 6-5.2 applies to contractors, designers, grade steel components and shapes. (2) Proprietary products not on the APL. (3) Sole sourced products not on the APL. (4) Special machinery with steel or iron components. (5) Heavy sections

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm110initialengineering.pdf?sfvrsn=14fa439d_3

DEV416-937PIAS (8-20-24)

* . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Section 937 *Use products listed on the Department’s Approved Product List (APL, List (APL) Submittal Requirements: Manufacturers seeking evaluation of products for inclusion on the APL shall submit an application in accordance with Section 6 and include the documentation, conduit(s) unless specifically called for in the Plans. 937-3.2 Approved Product List (APL) Submittal Requirements: Manufacturers seeking evaluation of products for inclusion on the APL shall submit

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/special-case/developmental/dev416-937pias-(8-20-24).pdf?sfvrsn=e2037466_2

v1-section54-clean

throughout the project duration, including a final report. (M) APL Project Tracking Summary report in MAC with appropriate APL tracking samples. 5.4.7 MATERIAL ACCEPTANCE (A) For Contractor Quality, . ______  All APL items have been entered into MAC. ______ Additionally, the total quantities

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/administration/resources/library/publications/materialsmanual/documents/v1-section54-clean.pdf?sfvrsn=8553b5a3_3

CH 20_redline_2025-02

on SHS and NHS in the State of Florida need to comply with the Department’s APL. If the device is not part of the APL, then the applicant must use the New Product Application Submittal. (316.0745, F.S., , Specifications and Estimates Plans, Specifications and Estimates Chapter 20-7 APL or the FDOT Approved

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/lap/manual/review/fy-2024-25/ch-20_redline_2025-02.pdf?sfvrsn=e65dd8c4_1

6650000-722FHWA

and components listed on the Department’s Approved Product List (APL). Pedestrian detection systems, of Section 995 and are listed on the Department’s Approved Product List (APL). 665-2.1.1 Housing, that meet the requirements of Section 995 and are listed on the Department’s Approved Product List (APL

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/fhwa/6650000-722fhwa.pdf?sfvrsn=aa34f2e9_2

6460000-722origind

on the Department’s Approved Products List (APL) 646-2.1 Poles and Posts: Use nominal 4 inch diameter, Transformer Base: Use transformer bases listed on the Department’s Approved Product List (APL). Manufacturers seeking APL approval of proprietary transformer bases must submit an application in accordance

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/6460000-722origind.pdf?sfvrsn=c07c6683_2

5480000.comm

Standards, Index 286. Response: 4. For Subarticle 548-5.3, should the APL number also be added to the marking? This is generally a requirement for other APL products. Response, or stone from natural sources” Response: 8. 548-3 Approved Product List (APL) a. Opening Paragraph

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/january-2017/review/comments-responses/5480000.comm.pdf?sfvrsn=38e9bb73_0

3530000.comm

they need to use products from the APL. Nowhere else in the Specification is this requirement identified, requires a Type ID curing compound. The APL has a Type 1 and a Type 2. 353-9 requires, to be on the APL? Response: 353-9.2.3 Dowel Bar Installation requires, “Use epoxy compounds

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/comments-responses/3530000.comm.pdf?sfvrsn=d9b37dc7_0

5210000.origind

? Yes No Structures staff contact ed ( name ) : Will the proposed revision involve APL changes, (APL). (1) Mount delineators on the barriers in accordance with the details shown in the Plans, barrier wall listed on the APL from a manufacturing plant that is currently on the Department’s list

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/internal/5210000.origind.pdf?sfvrsn=2ea72056_0

3000000.origind

? Yes No Structures staff contact ed ( name ) : Will the proposed revision involve APL changes, Approved Product List (APL), meeting the requirements of 916-23, or other types and grades of bituminous, , heated to a temperature offrom 250 to 300ºF or use an undiluted emulsion listed on the APL, meeting

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/internal/3000000.origind.pdf?sfvrsn=41e4c598_0

1020302.impl

on the Department’s Qualified Products List (QPL) or the Department’s Approved Products List (APL). Erect, the work area. Use only those devices that are on the QPL or the APL. Immediately remove or cover, or APL must comply with the requirements of Section 990 and include detailed vendor drawings

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/implemented/1020302.impl.pdf?sfvrsn=47ae6751_0

9951400-723impl

) retrofit kits must be listed on the APL. 995-14.2 Housing: The sign housing must be constructed, and be listed on the APL. If a door opens upward, it must have a bracket on each side to secure the door, , the cabinet must be currently listed on the APL or meet the requirements of Section 676. 995-15.4, on the APL. DMS LED retrofit kits must be listed on the APL. 995-16.1.1 Front Access DMS: Front, be accordance with Section 965. Signs included on the APL will be designated with a size and type

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/implemented/9951400-723impl.pdf?sfvrsn=360a34c4_1
20 of 2708 results