3001 search results for ENGINEERING - REQUEST

20240425_450640-1_SR 436_75120

EVALUATION AND CONDITION DATA SHEET 450640-1 Elipsis Engineering and Consulting 4/24 & 4/25/2024, AND CONDITION DATA SHEET 450640-1 Elipsis Engineering and Consulting 4/24 & 4/25/2024 SR 436 0.202, Engineering and Consulting 4/24 & 4/25/2024 SR 436 0.202 // 0.000 2.128 // 0.348 Core No. MP

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/coringdata/d5/75/20240425_450640-1_sr-436_75120.pdf?sfvrsn=f87ca6e2_1

20240417_450991-1_SR 15-600 (US 17-92)_79040

SHEET 450991-1 Elipsis Engineering and Consulting 4/15, 4/16, 4/17/24 Project No.: Cored By: Date, 450991-1 Elipsis Engineering and Consulting 4/15, 4/16, 4/17/24 Project No.: Cored By: Date, AND CONDITION DATA SHEET 450991-1 Elipsis Engineering and Consulting 4/15, 4/16, 4/17/24

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/coringdata/d5/79/20240417_450991-1_sr-15-600-(us-17-92)_79040.pdf?sfvrsn=f25bd2f3_1

5140100int

No Traffic Engineering Manual No Are changes in line with promoting and making progress on improving, the engineering requirements to perform as designed. What financial impact does the change have; project costs, ensures drainage geotextiles are the correct type and have the required engineering properties to perform

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/internal/5140100int.pdf?sfvrsn=555cc5d6_1

5140100ind

No Traffic Engineering Manual No Are changes in line with promoting and making progress on improving, the engineering requirements to perform as designed. What financial impact does the change have; project costs, ensures drainage geotextiles are the correct type and have the required engineering properties to perform

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/5140100ind.pdf?sfvrsn=33781545_1

2026FDM250HydraulicData

, the recommendations developed from FHWA’s Hydraulic Engineering Circular (HEC) should be followed, as well, and construction procedures. These three engineering disciplines have specific responsibilities, engineering judgment in comparing results obtained from scour computations with available hydrological

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm250hydraulicdata.pdf?sfvrsn=df46a1c7_2

E4Y06 BidTabs

% Responsive Non-Winning Bid 3 FLORIDA ENGINEERING & DEVELOPMENT CORP $3,158,467.42 119.72, ) FLORIDA ENGINEERING & DEVELOPMENT CORP Units ( ) indicates item is bid as Lump Sum 0001 Roadway, ASPHALT PAVING, INC. (2) GENERAL ASPHALT COMPANY, LLC (3) FLORIDA ENGINEERING & DEVELOPMENT CORP, ) GENERAL ASPHALT COMPANY, LLC (3) FLORIDA ENGINEERING & DEVELOPMENT CORP Units ( ) indicates item, ASPHALT PAVING, INC. (2) GENERAL ASPHALT COMPANY, LLC (3) FLORIDA ENGINEERING & DEVELOPMENT CORP

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/bidtabs/2025/sep05/e4y06-bidtabs.pdf?sfvrsn=df5f9a50_1

20231127_450946-1_SR A1A_79080

of Transportation PAVEMENT EVALUATION AND CONDITION DATA SHEET 450946-1 Elipsis Engineering, of Transportation PAVEMENT EVALUATION AND CONDITION DATA SHEET 450946-1 Elipsis Engineering, PAVEMENT EVALUATION AND CONDITION DATA SHEET 450946-1 Elipsis Engineering and Consulting 9/13 & 11/27/23

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/coringdata/d5/79/20231127_450946-1_sr-a1a_79080.pdf?sfvrsn=2090d408_1

2026FDM250HydraulicData

, the recommendations developed from FHWA’s Hydraulic Engineering Circular (HEC) should be followed, as well, and construction procedures. These three engineering disciplines have specific responsibilities, engineering judgment in comparing results obtained from scour computations with available hydrological

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm250hydraulicdata.pdf?sfvrsn=8866500b_1

E8W61BidTabs

HIGHWAY IMPROVEMENT IN $129,300.00 127.80% Responsive Non-Winning Bid 6 YOROCA ENGINEERING CONTRACTORS, IMPROVEMENT IN (6) YOROCA ENGINEERING CONTRACTORS, Units ( ) indicates item is bid as Lump Sum, ) COMPLETE HIGHWAY IMPROVEMENT IN (6) YOROCA ENGINEERING CONTRACTORS, Units ( ) indicates item

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/bid-tabs/2025/oct21/e8w61bidtabs.pdf?sfvrsn=b67747b9_1

E6P94-R0BidTabs

C &T PRESSURE CLEANING $385,675.00 115.39% Non Responsive Non-Winning Bid 6 HIGHSTYLE ENGINEERING, ) ENVIROWASTE SERVICES GROUP, INC. (5) C &T PRESSURE CLEANING (6) HIGHSTYLE ENGINEERING, ) HIGHSTYLE ENGINEERING & CONSTRUCTION SERVICES LLC Units ( ) indicates item is bid as Lump Sum 0001

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/bid-tabs/2025/oct30/e6p94-r0bidtabs.pdf?sfvrsn=c414baef_1

2025 WP Project Summary_D7_v5

Preliminary Engineering 32 ROW Right of Way 4B, 41, 42, 43 RRU Railroad and Utilities 36, 56 CST, Engineering (PE), and/or Right of Way (ROW) Projects The table below provides a summary, ), Preliminary Engineering (PE – Phase 32), and/or Right of Way (ROW – Phase 43

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/turnpike-work-program-summaries/2025-wp-project-summary_d7_v5.pdf?sfvrsn=86c5f135_1

FDOT Approved Specialty Engineers (List for Contractor use on Projects with Structures)

below, FDOT pre-qualified Engineering Consultants that are authorized by Type of Work (4.1 thru 4.4, Engineer. See PRE-QUALIFIED ENGINEERING CONSULTANTS for a list.To find out what type, are evaluated consistent with engineering consultant prequalification, refer to FDOT Procurement’s

https://www.fdot.gov/construction/engineers/specialty/specialtymain.shtm

45136215202-PLANS-01-VERIFIEDUTILITIES

: 3 0 : 2 3 A M b b e a r d AIM ENGINEERING & SURVEYING, INC. HENRY G. FICHTER, PSM, OF AUTHORIZATION NO. 3114 FORT MYERS, FLORIDA 33901 2161 FOWLER ST., SUITE 100 AIM ENGINEERING AND SURVEYING, H R D 0 2 . D G N 9 : 2 4 : 4 7 A M b b e a r d AIM ENGINEERING

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy26-27/ad--27112/45136215202-plans-01-verifiedutilities.pdf?sfvrsn=f016638e_1

FastFacts-442891-1

Construction Engineering Inspection: Pinnacle Consulting Enterprises, Inc. Project Contact: Engineer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/structures/innovation/frp/fastfacts-442891-1.pdf?sfvrsn=ca9035e_1

SunTrail_AWP-Amended_AtAGlance_FY2024_2023-11-02_ADA

: Project Development and Environment Study • PE: Preliminary Engineering • ENV: Environmental / Mitigation • ROW: Right-of-Way • CON+CEI: Construction and Construction Engineering Inspections, : Feasibility Study • PDE: Project Development and Environment Study • PE: Preliminary Engineering, Engineering Inspections ID# Tier FM # District County Trail Name Segment Cost Phase 28 SJR2C

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/systems/suntrail/work-program/suntrail_awp-amended_ataglance_fy2024_2023-11-02_ada.pdf?sfvrsn=53c4dfac_1
20 of 3001 results
Top