3001 search results for ENGINEERING - REQUEST
20240425_450640-1_SR 436_75120
EVALUATION AND CONDITION DATA SHEET 450640-1 Elipsis Engineering and Consulting 4/24 & 4/25/2024, AND CONDITION DATA SHEET 450640-1 Elipsis Engineering and Consulting 4/24 & 4/25/2024 SR 436 0.202, Engineering and Consulting 4/24 & 4/25/2024 SR 436 0.202 // 0.000 2.128 // 0.348 Core No. MP
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/coringdata/d5/75/20240425_450640-1_sr-436_75120.pdf?sfvrsn=f87ca6e2_120240417_450991-1_SR 15-600 (US 17-92)_79040
SHEET 450991-1 Elipsis Engineering and Consulting 4/15, 4/16, 4/17/24 Project No.: Cored By: Date, 450991-1 Elipsis Engineering and Consulting 4/15, 4/16, 4/17/24 Project No.: Cored By: Date, AND CONDITION DATA SHEET 450991-1 Elipsis Engineering and Consulting 4/15, 4/16, 4/17/24
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/coringdata/d5/79/20240417_450991-1_sr-15-600-(us-17-92)_79040.pdf?sfvrsn=f25bd2f3_15140100int
No Traffic Engineering Manual No Are changes in line with promoting and making progress on improving, the engineering requirements to perform as designed. What financial impact does the change have; project costs, ensures drainage geotextiles are the correct type and have the required engineering properties to perform
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/internal/5140100int.pdf?sfvrsn=555cc5d6_15140100ind
No Traffic Engineering Manual No Are changes in line with promoting and making progress on improving, the engineering requirements to perform as designed. What financial impact does the change have; project costs, ensures drainage geotextiles are the correct type and have the required engineering properties to perform
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/5140100ind.pdf?sfvrsn=33781545_12026FDM250HydraulicData
, the recommendations developed from FHWA’s Hydraulic Engineering Circular (HEC) should be followed, as well, and construction procedures. These three engineering disciplines have specific responsibilities, engineering judgment in comparing results obtained from scour computations with available hydrological
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm250hydraulicdata.pdf?sfvrsn=df46a1c7_2E4Y06 BidTabs
% Responsive Non-Winning Bid 3 FLORIDA ENGINEERING & DEVELOPMENT CORP $3,158,467.42 119.72, ) FLORIDA ENGINEERING & DEVELOPMENT CORP Units ( ) indicates item is bid as Lump Sum 0001 Roadway, ASPHALT PAVING, INC. (2) GENERAL ASPHALT COMPANY, LLC (3) FLORIDA ENGINEERING & DEVELOPMENT CORP, ) GENERAL ASPHALT COMPANY, LLC (3) FLORIDA ENGINEERING & DEVELOPMENT CORP Units ( ) indicates item, ASPHALT PAVING, INC. (2) GENERAL ASPHALT COMPANY, LLC (3) FLORIDA ENGINEERING & DEVELOPMENT CORP
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/bidtabs/2025/sep05/e4y06-bidtabs.pdf?sfvrsn=df5f9a50_120231127_450946-1_SR A1A_79080
of Transportation PAVEMENT EVALUATION AND CONDITION DATA SHEET 450946-1 Elipsis Engineering, of Transportation PAVEMENT EVALUATION AND CONDITION DATA SHEET 450946-1 Elipsis Engineering, PAVEMENT EVALUATION AND CONDITION DATA SHEET 450946-1 Elipsis Engineering and Consulting 9/13 & 11/27/23
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/coringdata/d5/79/20231127_450946-1_sr-a1a_79080.pdf?sfvrsn=2090d408_12026FDM250HydraulicData
, the recommendations developed from FHWA’s Hydraulic Engineering Circular (HEC) should be followed, as well, and construction procedures. These three engineering disciplines have specific responsibilities, engineering judgment in comparing results obtained from scour computations with available hydrological
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm250hydraulicdata.pdf?sfvrsn=8866500b_1E8W61BidTabs
HIGHWAY IMPROVEMENT IN $129,300.00 127.80% Responsive Non-Winning Bid 6 YOROCA ENGINEERING CONTRACTORS, IMPROVEMENT IN (6) YOROCA ENGINEERING CONTRACTORS, Units ( ) indicates item is bid as Lump Sum, ) COMPLETE HIGHWAY IMPROVEMENT IN (6) YOROCA ENGINEERING CONTRACTORS, Units ( ) indicates item
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/bid-tabs/2025/oct21/e8w61bidtabs.pdf?sfvrsn=b67747b9_1E6P94-R0BidTabs
C &T PRESSURE CLEANING $385,675.00 115.39% Non Responsive Non-Winning Bid 6 HIGHSTYLE ENGINEERING, ) ENVIROWASTE SERVICES GROUP, INC. (5) C &T PRESSURE CLEANING (6) HIGHSTYLE ENGINEERING, ) HIGHSTYLE ENGINEERING & CONSTRUCTION SERVICES LLC Units ( ) indicates item is bid as Lump Sum 0001
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/bid-tabs/2025/oct30/e6p94-r0bidtabs.pdf?sfvrsn=c414baef_12025 WP Project Summary_D7_v5
Preliminary Engineering 32 ROW Right of Way 4B, 41, 42, 43 RRU Railroad and Utilities 36, 56 CST, Engineering (PE), and/or Right of Way (ROW) Projects The table below provides a summary, ), Preliminary Engineering (PE – Phase 32), and/or Right of Way (ROW – Phase 43
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/turnpike-work-program-summaries/2025-wp-project-summary_d7_v5.pdf?sfvrsn=86c5f135_1FDOT Approved Specialty Engineers (List for Contractor use on Projects with Structures)
below, FDOT pre-qualified Engineering Consultants that are authorized by Type of Work (4.1 thru 4.4, Engineer. See PRE-QUALIFIED ENGINEERING CONSULTANTS for a list.To find out what type, are evaluated consistent with engineering consultant prequalification, refer to FDOT Procurement’s
https://www.fdot.gov/construction/engineers/specialty/specialtymain.shtm45136215202-PLANS-01-VERIFIEDUTILITIES
: 3 0 : 2 3 A M b b e a r d AIM ENGINEERING & SURVEYING, INC. HENRY G. FICHTER, PSM, OF AUTHORIZATION NO. 3114 FORT MYERS, FLORIDA 33901 2161 FOWLER ST., SUITE 100 AIM ENGINEERING AND SURVEYING, H R D 0 2 . D G N 9 : 2 4 : 4 7 A M b b e a r d AIM ENGINEERING
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy26-27/ad--27112/45136215202-plans-01-verifiedutilities.pdf?sfvrsn=f016638e_1E8U57Addenda001
+ engineering data (CADD-Rev1.zip file
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2023/aug29/e8u57addenda001.pdf?sfvrsn=c5f68adb_1FastFacts-442891-1
Construction Engineering Inspection: Pinnacle Consulting Enterprises, Inc. Project Contact: Engineer
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/structures/innovation/frp/fastfacts-442891-1.pdf?sfvrsn=ca9035e_1GILCHRIST_Draft Tentative Work Program Public Hearing_By Project_10-11-2023
Preliminary Engineering State $188,000 Construction State $2,345,000 Total for Project 438209-2 $188,000
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/gilchrist_draft-tentative-work-program-public-hearing_by-project_10-11-2023.pdf?sfvrsn=e11d52df_1GILCHRIST_Draft Tentative Work Program Public Hearing_D2 By Description_10-11-2023
: NEW ROAD CONSTRUCTION Phase Funding Source 2025 2026 2027 2028 2029 Preliminary Engineering State
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/gilchrist_draft-tentative-work-program-public-hearing_d2-by-description_10-11-2023.pdf?sfvrsn=ef9d788a_1fdot-be694-sum
for civil engineering construction, which is best for use by the Florida Department
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-be694-sum.pdf?sfvrsn=94e2b7da_320231024_436337-1_CR229_27590
& Associates Engineering, PLLC Date: 10/24/2023 Page: 1 1 Typical Section No.: Roadway Section: 27590000
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/coringdata/d2/27/20231024_436337-1_cr229_27590.pdf?sfvrsn=b8d9dc5d_1SunTrail_AWP-Amended_AtAGlance_FY2024_2023-11-02_ADA
: Project Development and Environment Study • PE: Preliminary Engineering • ENV: Environmental / Mitigation • ROW: Right-of-Way • CON+CEI: Construction and Construction Engineering Inspections, : Feasibility Study • PDE: Project Development and Environment Study • PE: Preliminary Engineering, Engineering Inspections ID# Tier FM # District County Trail Name Segment Cost Phase 28 SJR2C
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/systems/suntrail/work-program/suntrail_awp-amended_ataglance_fy2024_2023-11-02_ada.pdf?sfvrsn=53c4dfac_1