3009 search results for intersection

Exhibit 212-4

Passenger Vehicle SU Vehicle Combination Vehicle INTERSECTION SIGHT DISTANCE: 2-LANE UNDIVIDED (mph

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/exhibit-212-4.pdf?sfvrsn=86274d76_1

639-002

. in the conduit with the Electrical Service with Specification 620. Run the bond wire Intersection

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/idx/639-002.pdf?sfvrsn=772cbad8_1

Historical Item Averages Market Area 14

$38,232.00 3,600.000 ED N TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 0102107 1 1 $10.62 $38,232.00 3,600.000 ED N TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION 0102115 2 $.56, SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL 0632 7 6 1 $2,950.00 $32,450.00 11.000 PI N SIGNAL CABLE, REMOVE- INTERSECTION 10/27/2025 Page: 5 Florida Department

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/market-area/pdf/historical-item-averages-market-area-14.pdf?sfvrsn=798f3e42_3

Exhibit 914-1

 Exhibit 914-1 General Notes Date: 1/1/2026 GENERAL NOTES PHASE II NOTES FOR REVIEWERS 5. DDI DESIGN FOLLOWS CRITERIA SET BY FDM D217 DATED JANUARY 2022. 4. MAINTENANCE AGREEMENT FOR ARCHITECTURAL LIGHTING IS BEING PROCESSED. THESE VARIATIONS WILL BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO PHASE III SUBMITTAL. • CLEAR ZONE FOR DRAINAGE FEATURES • MAXIMUM DEFLECTION THROUGH AN INTERSECTION • DEFLECTION IN ALIGNMENT • 10-FT-WIDE MAINTENANCE AREA FOR RETAINING WALL • MAXIMUM CHANGE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/exhibit-914-1.pdf?sfvrsn=c66124cf_2

PublicHearing_ORANGE COUNTY_Summary_2024-2028

435527-1 - POWERS DRIVE AT NORTH LANE Type of Work: INTERSECTION IMPROVEMENT Phase Funding Source, of Work: INTERSECTION IMPROVEMENT Phase Funding Source 2024 2025 2026 2027 2028 Construction State, 444315-1 $2,000,000 $279,312 444788-1 - TINY ROAD INTERSECTION IMPROVEMENTS @ TILDEN RD Type of Work, - SR 438 INTERSECTION IMPROVEMENTS AT KINGSLAND AVE Type of Work: SAFETY PROJECT Phase Funding, $577,196 $1,843,975 447607-1 - SR 50 AT THE INTERSECTION OF HIGHLAND AVE Type of Work: TRAFFIC

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_orange-county_summary1c52474df1b64730b8d180ee67c84cba.pdf?sfvrsn=6de400c7_4

102-661

signage at intersections as required for 24 hours or less. be omitted when the work operation

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/idx/102-661.pdf?sfvrsn=3ca4a7e4_1

546-020

rumble strips at the radius return. 2. At intersections and major driveways: longitudinal direction

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/idx/546-020.pdf?sfvrsn=9e7a63e4_1

E51F0

, to upgrade existing intersections to ATSPM standards, including advanced detection at all lanes

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2023/nov07/e51f0.pdf?sfvrsn=e3452b2f_1

DSPI-D520-030

at intersections. The raised crosswalk portion should use the same type of friction course (FC) mix (FC- 9.5

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/dev/dspi-d520-030.pdf?sfvrsn=e930e2a3_3

Bicycle Safety

driving a car. Using hand signals make crossing intersections safer for bicyclists

https://www.fdot.gov/agencyresources/bicyclesafety

Landscape Architecture

Installation, Index 546-Sight Distance at Intersections, and Index 700-Roadside Offsets to be helpful when

https://www.fdot.gov/designsupport/highwaybeautification/usefullinks.shtm

plugfest

and traffic performance at intersections. The key component of this new algorithm is the use of novel

https://www.fdot.gov/emergingtechnology/articles/plugfest
20 of 3009 results