3009 search results for intersection

20240814_441220-2_SR5_78020

: St. Johns Intersection Improvement 2' paved Section No: 78020 15.707 End MP:16.041 Length, e e l P a t h Pavement Layer County: Intersection Improvement 2' paved Section No: 0.000, Layer County: Duval Intersection Improvement 3' paved Section No: 72000307 0.000 End MP:0.352, Intersection Improvement CURB AND GUTTER Section No: 78502 8.000 End MP:9.159 Length: Project

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/coringdata/d2/78/20240814_441220-2_sr5_78020.pdf?sfvrsn=6c6f201c_1

Exhibit 212-4

Passenger Vehicle SU Vehicle Combination Vehicle INTERSECTION SIGHT DISTANCE: 2-LANE UNDIVIDED (mph

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/exhibit-212-4.pdf?sfvrsn=d345bc4f_1

Exhibit 914-1

 Exhibit 914-1 General Notes Date: 1/1/2025 GENERAL NOTES PHASE II NOTES FOR REVIEWERS 5. DDI DESIGN FOLLOWS CRITERIA SET BY FDM D217 DATED JANUARY 2022. 4. MAINTENANCE AGREEMENT FOR ARCHITECTURAL LIGHTING IS BEING PROCESSED. THESE VARIATIONS WILL BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO PHASE III SUBMITTAL. • CLEAR ZONE FOR DRAINAGE FEATURES • MAXIMUM DEFLECTION THROUGH AN INTERSECTION • DEFLECTION IN ALIGNMENT • 10-FT-WIDE MAINTENANCE AREA FOR RETAINING WALL • MAXIMUM CHANGE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/exhibit-914-1.pdf?sfvrsn=c52b3f60_1

About the Study

intersection improvements are also being evaluated at Hallandale Beach Boulevard, Pembroke Road

https://www.fdot.gov/projects/i95-858-820/about-the-study.html

1020200.FHWA

intersection per day. Item No. 102-107- Temporary Traffic Detection and Maintenance - per intersection per day. Item No. 102-120- Temporary Signal for Lane Closures on Two-Lane, Two- Way Roadways, and Maintenance - per intersection per day. Item No. 102-107- Temporary Traffic Detection and Maintenance - per intersection per day. 1020200.D01 All Jobs Item No. 102-120- Temporary Signal for Lane Closures

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/fhwa/1020200.fhwa.pdf?sfvrsn=b06e0d20_0

CR 510 PD&E Study from 58th Avenue to East of US-1

. Intersection improvements at 58th Avenue and at SR 5/US 1 will also be evaluated. The study

https://www.fdot.gov/projects/cr510-58ave-us1/home

FDOTCADDWebinars

Description Presentations Q&As Posted FDOT Intersection Island Modeling This webinar will Walk through the process of developing a Proposed 3D Corridor model of a Traffic Island at an intersection, :Evaluate a Proposed Design 3D Model Intersection(MODLRD##.dwg), Create new FDOT MODLRD##.dwg using, intersection, Surfaces, Alignments, and External Reference drawings for 2D linework

https://www.fdot.gov/cadd/main/webinars/fdotcaddwebinars

Standard Plans - FY 2024-25 Errata

. 102-615 1 and 3 of 5 03/04/2024 Multilane Roadway, Intersection Work Sheet 1: Corrected the W4-2

https://www.fdot.gov/design/standardplans/2025/standard-plans---fy-2024-25-errata

E4X90

SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 350.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 350.000 0102-115- TYPE III BARRICADE ED 30.000 0104- 10- 3 SEDIMENT BARRIER LF, - 7- 1 SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL PI 2.000 0632- 7- 6 SIGNAL CABLE, REMOVE- INTERSECTION PI 2.000 0635- 2- 11 PULL & SPLICE BOX, F&I, 13" x 24" COVER SIZE EA

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2025/sep05/e4x90.pdf?sfvrsn=a99576c7_1

19-08-LewisMUTCDUpdates

(Manual on Uniform Traffic Studies) 43 References to the MUTCD ICE (Manual on Intersection Control, Changes to Yield Makings at Bicycle Lane Intersection Approaches Section 3D.01 Roundabout Fishhook, for Intersection Lane Control Sign, Bridge Signs, Move Vehicles from Travel Lane Sign, Rest Area, (Manual on Intersection Control Evaluation) MUTS (Manual on Uniform Traffic Studies) SZM (Speed

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2025-june/19-08-lewismutcdupdates.pdf?sfvrsn=c6ebfdf8_1

E6P60

SIGN, TEMPORARY ED 1,018.000 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 810.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 810.000 0102-115, 990.000 0632- 7- 1 SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL PI 3.000 0632- 7- 6 SIGNAL CABLE, REMOVE- INTERSECTION PI 3.000 0635- 2- 11 PULL & SPLICE BOX, F&I, 13" x 24

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/lettings/2025/sep25/e6p60.pdf?sfvrsn=f2c03a6f_1

Exhibit 914-1 Redlines

 Exhibit 914-1 General Notes Date: 1/1/2025 GENERAL NOTES PHASE II NOTES FOR REVIEWERS 5. DDI DESIGN FOLLOWS CRITERIA SET BY FDM D217 DATED JANUARY 2022. 4. MAINTENANCE AGREEMENT FOR ARCHITECTURAL LIGHTING IS BEING PROCESSED. THESE VARIATIONS WILL BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO PHASE III SUBMITTAL. • CLEAR ZONE FOR DRAINAGE FEATURES • MAXIMUM DEFLECTION THROUGH AN INTERSECTION • DEFLECTION IN ALIGNMENT • 10-FT-WIDE MAINTENANCE AREA FOR RETAINING WALL • MAXIMUM CHANGE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/exhibit-914-1-redlines.pdf?sfvrsn=3800e693_1
20 of 3009 results