shall be tested. Perform Magnetic Particle Testing at the following frequencies: A minimum o f 2 5, by the following. UnlessotherwiseshowninthePlans,perform ultrasonic testing (UT) or radiographic testing, of the welds on the members shall be tested. 460-6.4.2TubularBridgeorOverhead Sign Structures: Comply, : UnlessotherwiseshowninthePlans,perform ultrasonic testing (UT) or radiographic testing (RT) on full, or shear. If discontinuities are found in the joint, the remainder of the joint shall be tested

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/implemented/4600604.impl.pdf?sfvrsn=213956d4_0

4600604-724IMPL

shown in the Plans, perform ultrasonic testing (UT) or radiographic testing (RT) on complete joint, . If discontinuities are found in the joint, the remainder of the joint shall be tested. Perform Magnetic Particle Testing at the following frequencies: A minimum of 25% of all fillet or partial, ). If discontinuities are found, the remainder of the welds on the members shall be tested. SUBARTICLE 460-6.4.2, in the Plans, perform ultrasonic testing (UT) or radiographic testing (RT) on complete joint penetration

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/implemented/4600604-724impl.pdf?sfvrsn=9ae1dcd3_1

psb20-01

by the end of 2019 and conduct testing the beginning of January 2020. This schedule has been met, concluding with a very successful testing phase. The testing of the new module included testers from, completed final testing and is fully deployed as of the date of this memorandum. A recorded webinar

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/project-management/bulletins/psb20-01.pdf?sfvrsn=88d450dd_1

9210000-723FHWA

days, as applicable. j. The approved laboratory that performed all tests. An acceptable mill test, for Department work. 921-3.2 Sampling and Testing: An approved laboratory shall perform one QC test, tests. Acceptable test reports are available in the appendices of AASHTO M 85 for portland cement, Sampling and Testing: An approved laboratory shall perform one QC test per day. Test reports, Specification. The changes are proposed by Thomas Frank to change "Mill Test Report" to "Test

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/fhwa/9210000-723fhwa.pdf?sfvrsn=fe569b54_1

Section92VII-051414

for approval. The strength test data shall represent either a group of at least 30 consecutive tests or a statistical average for two groups totaling 30 or more tests. The strength test data from, such tests. Perform slump loss testing of the drilled shaft mix using qualified personnel as defined, uniformity test data, based on ASTM C94 testing. The metal rating plates must be attached to each, criteria. Methods of sampling and testing materials shall be in accordance with the Specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/materials-manual/section92vii-051414.pdf?sfvrsn=abe3a5e9_1

9930202.FHWA

be tested and evaluated according to the National Testing Product Evaluation Program (NTPEP) Project Work, 10 vehicle impacts when tested according to National Testing Product Evaluation Program (NTPEP, . 993-2.2.2 Color: The post shall be opaque white. The yellowness index shall not exceed 12 when tested, reflectance shall be a minimum of 70 when tested in accordance with ASTM E 1347. 993- 2.2.3, . The test on each post shall be completed within two minutes of removal from the oven. 993-2.2.5 Cold

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan11/files/9930202.fhwa.pdf?sfvrsn=12ec9b5a_0

5230200.comm

in the initial QPL application, section 523-2.1? The DFT test would allow the manufacturer to test, test results until the product is placed on the Department test deck. By only allowing the DFT as an alternative in the field test, the Department has knowledge of a passing Skid test installatin and has the option of conducting a Skid test on the field test installation. Response: ******************************************************************************

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan11/files/5230200.comm.pdf?sfvrsn=8027b4c0_0

6330201-724IMPL

to the Engineer for approval prior to commencement of testing. Perform all tests at 1,310 and 1,550, is proof-tested by the fiber manufacturer at a minimum of 100 kilo pounds per square inch. Ensure, decibel at 1,550 nanometers when tested according to the requirements as detailed in the TIA-455-25D, . Ensure each reel has a minimum of 6 feet on each end of the cable available for testing. 4. Ensure, greater than 0.1 decibel per reel. 6. Submit the transmission loss test results as required

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/implemented/6330201-724impl.pdf?sfvrsn=bddbb6db_1

2000502-724IMPL

. Construct a test section of the length of one full LOT. Perform two sets of QC density tests per source at random locations within the test section. Each set will include five density tests. One set, at the same location where the thick lift test was taken. All QC tests and a Department Verification, the Engineer in writing prior to starting reduced frequency of testing. If the Verification test fails, and QC test data is not upheld by Resolution testing the QC testing will revert to the original

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/implemented/2000502-724impl.pdf?sfvrsn=5c951df0_1

v1-section3.1-clean

(herein referred to as the Producer), testing laboratory. The IV test then represents a safeguard, the original sample has been reduced to the appropriate testing size. Test the samples, . The purpose of these tests is to verify that the Producer’s testing equipment is functioning properly, manner prior to testing. Test results should be compared based on the Between-Laboratory Precision, Construction 3-1-2 verification activities, which include sampling and testing; the monitoring

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/administration/resources/library/publications/materialsmanual/documents/v1-section3-1-clean.pdf?sfvrsn=f5d4a7b_2

CR 12C (FY 17-18)

is required to develop and submit a test plan for field acceptance testing (FAT) to the Engineer, is required to perform local field operational tests at device server field sites according to the test procedures stated herein? [Spec. 684-2.4.2] 3. Is CEI project staff aware that the contractor is required to perform local field operational tests at the device field site and end-to-end video streaming tests as required by the Engineer in order to demonstrate compliance with Department

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/construction/constadm/guidelist/criticalreq/fy1718/cr-12c-(fy-17-18).pdf?sfvrsn=f9e145c0_0

CR-12C (FY 18-19)

is required to develop and submit a test plan for field acceptance testing (FAT) to the Engineer, is required to perform local field operational tests at device server field sites according to the test procedures stated herein? [Spec. 684-2.4.2] 3. Is CEI project staff aware that the contractor is required to perform local field operational tests at the device field site and end-to-end video streaming tests as required by the Engineer in order to demonstrate compliance with Department

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/construction/constadm/guidelist/criticalreq/fy1819/cr-12c-(fy-18-19).pdf?sfvrsn=cfd22194_0

1050404-MM84VII.comm

Field Technician Test. I have concerns about having an ACI certified tech performing tests that are not covered in the training. I believe that these tests are important, but that the data, are with the addition of three new tests to every lot of production (Table II). These include the Relative, that must be poured out in as little as 30 minutes. By adding these test we are taking away valuable time that could be used pouring. I also have concerns with having to buy new testing equipment

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/comments-responses/1050404-mm84vii.comm.pdf?sfvrsn=56bb4cc_0

Research Center

Solutions from Transportation Research and Evaluation of Emerging Technologies) Testbed Summary [210KB, for Testing and Assessing Infrastructure Support of Connected Vehicle and Cooperative Highway Automation, ] Geotechnical January 16, 2024 BDV31-977-124 Phase II: Field Load Testing of Shallow Foundations, 24, 2023 BEB28 Development of a Test to Quantify Organic Content in Silica Sand Summary [237KB

https://www.fdot.gov/research/default.shtm

1250801.impl

envelope then the Contractor must demonstrate with a successful test section that density can be achieved. Notify the Engineer in writing prior to beginning construction of a test section. Construct a test section of the length of one LOT. Perform five quality control (QC) tests at random locations within the test section. All five tests must meet the density required by 125-9.2 and be verified, section. When a QC test fails the requirements of 125-9.2 or when the QC tests cannot be verified

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/implemented/1250801.impl.pdf?sfvrsn=cab58444_0

Polygraph

to a written notice before testing, the right to refuse or discontinue a test, and the right not to have, test, and from discharging, disciplining, or discriminating against an employee or prospective employee for refusing to take a test or for exercising other rights under the Act. EXEMPTIONS Federal, ) tests to be administered in the private sector, s u b j e c t t o restrictions, to certain, ), and of pharmaceutical manufacturers, distributors and dispensers. The Act also permits polygraph testing, subject

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/equalopporunity/contract-compliance/posters/polygraph.pdf?sfvrsn=d8e21dd1_1

Employee Polygraph Protection Act (English)

to a written notice before testing, the right to refuse or discontinue a test, and the right not to have, test, and from discharging, disciplining, or discriminating against an employee or prospective employee for refusing to take a test or for exercising other rights under the Act. EXEMPTIONS Federal, ) tests to be administered in the private sector, s u b j e c t t o restrictions, to certain, ), and of pharmaceutical manufacturers, distributors and dispensers. The Act also permits polygraph testing, subject

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/equalopporunity/contract-compliance/employee-polygraph-protection-act-(english).pdf?sfvrsn=5e5f69c8_1

3460202.impl

KOhm-cm Submit resistivity test specimens at least seven calendar days prior to the scheduled 28 day test to the Engineer for testing by the State Materials Office. TABLE 1 BRIDGE SUPERSTRUCTURES, at 28 days, when tested in accordance with AASHTO T358. Submit three 4 x 8 inch cylindrical test specimens to the Engineer for resistivity testing before mix design approval. Take the resistivity test, meet or exceed the following surface resistivity requirements when tested in accordance with AASHTO

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/january-2017/review/implemented/3460202.impl.pdf?sfvrsn=260b14d4_0

9380000FHWA

an application in accordance with Section 6 and include certified test reports from an independent AASHTO R-18, of materials or material sources requires new testing and certification of the conformance of the grout, manufacture to usage in excess of six months shall be tested and certified by the supplier, with the manufacturer’s recommendations except when additional water is indicated for particular tests. 938-4.2 Grout, components which produce hydrogen, carbon dioxide or oxygen gas. 938-4.2.2 Laboratory Testing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul19/files/9380000fhwa.pdf?sfvrsn=aa2dfa83_2

1050813DB.impl

(DTE):ProvideaDynamic Testing Engineer in responsible charge of the performance of the dynamic load testing of driven piles, evaluation, signal matching and analysis of the dynamic load test data, for the project. Provide qualified and trained personnel to perform foundation testing, inspection, , dynamic testing, load testing and non-destructive testing personnel to be used on the project, of data from the types of load tests (dynamic, static, Osterberg Cell and/or Statnamic load tests

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul13/files/1050813db.impl.pdf?sfvrsn=e0c62d20_0
20 of 9185 results