7241 search results for Pavement

Exhibit 230-13

 R1-1 W1-6 W1-6 W1-7 12' Min. 12' Min. 1 2 ' M i n . OM1-3 OM1-3 OM1-3 Legend Direction of travel TYPICAL SIGNING AND PAVEMENT MARKING FOR RESIDENTIAL AND MINOR STREET TERMINATIONS Figure 1 TRAFFIC CONTROLS FOR MINOR STREET TERMINATION OM4-3 W14-1 OM4-3 OM4-3 8'-0" Center to Center Max. 4'-0" Center to Center Min. . . 4 ' - 0 " Figure 2 TRAFFIC CONTROLS, for pavement markings. 4) accordance with Specification 993. Provide sheeting on signs and object markers

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/exhibit-230-13.pdf?sfvrsn=5ecb2314_1

570-010

" resurfacing build-up is less than 3" · is rural or is urban without curb and gutter · of shoulder pavement, or construction of shoulder pavement · Project___ CRITERIA FOR USING TREATMENT II DETAILS ARE TO BE SHOWN, Than 3" Overlay 1'-4" Transverse Joints Placed With Staggered Sod Blocks Shall Be Edge Of Pavement drop at the edge of pavement.) trenching or borrow under sod to attain the 1" (Depending, Pavement Edge Of Any Existing 3" Or More Overlay ") 2 1 Sod (Avg. Depth 1 Turf (Gap For Drainage

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/570-010.pdf?sfvrsn=d8952c9d_1

Exhibit 230-13

 R1-1 W1-6 W1-6 W1-7 12' Min. 12' Min. 1 2 ' M i n . OM1-3 OM1-3 OM1-3 Legend Direction of travel RESIDENTIAL AND MINOR STREET TERMINATIONS TYPICAL SIGNING AND PAVEMENT MARKING FOR Figure 1 TRAFFIC CONTROLS FOR MINOR STREET TERMINATION OM4-3 W14-1 OM4-3 OM4-3 8'-0" Center to Center Max. 4'-0" Center to Center Min. . . 4 ' - 0 " Figure 2 TRAFFIC CONTROLS, for pavement markings. 4) accordance with Specification 993. Provide sheeting on signs and object

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/exhibit-230-13.pdf?sfvrsn=467d1bae_2

SPI-521-512

for Index 521-510. In Roadway Plans: When using Index 521-512 with asphalt pavement, show shoulder, roadway pavement and Type SP overbuild. Variable thickness Type SP asphalt is paid

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/spi/spi-521-512.pdf?sfvrsn=4dd1d8f7_1

RDB 24-04

FHWA Approved: Drainage Manual:9/24/2024 Flexible Pavement Design Manual: 10/15/2024 FDOT Design, Engineers, District Maintenance Engineers, District Pavement Engineers, District Consultant Project, of the 2025 FDOT Design Manual (FDM), 2025 Drainage Manual, and 2025 Flexible Pavement Design Manual, of changes to the Flexible Pavement Design Manual can be found at the following link: http://fdot.gov/roadway/PM/publications.shtm There were no revisions to the 2022 Rigid Pavement Design Manual

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/bulletin/rdb-24-04.pdf?sfvrsn=b4a7f875_3

SP3270100-i19134

 MILLING OF EXISTING ASPHALT PAVEMENT - STOCKPILING. (REV 8-17-22) (FA 2-14-00) (FY 2025-26) ARTICLE 327-1. The third paragraph is deleted and the following substituted: For this Contract, the Department will retain ownership of _____ of the milled material. Haul and stockpile the material to remain the property of the Department at the location shown in the Plans. The Contractor will take, Pavement - per square yard

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/workbook/sp3270100-i19134.pdf?sfvrsn=99ea9d98_1

SP3270100-i18513

 MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (FY 2023-24) ARTICLE 327-1. The third paragraph is deleted and the following substituted: For this Contract, the Department will retain ownership of _____ of the milled material. Haul and stockpile the material to remain the property of the Department at the location shown in the Plans. The Contractor will take ownership, by the Department. Payment will be made under: Item No. 327- 70- Milling Existing Asphalt Pavement - per

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/workbook/sp3270100-i18513.pdf?sfvrsn=8a1cfc17_2

SP3270100-i19134

 MILLING OF EXISTING ASPHALT PAVEMENT - STOCKPILING. (REV 8-17-22) (FA 2-14-00) (FY 2024-25) ARTICLE 327-1. The third paragraph is deleted and the following substituted: For this Contract, the Department will retain ownership of _____ of the milled material. Haul and stockpile the material to remain the property of the Department at the location shown in the Plans. The Contractor will take, Pavement - per square yard

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/workbook/sp3270100-i19134.pdf?sfvrsn=39c9a1ae_1

SP3270100-i17887

 MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (7-22) ARTICLE 327-1. The third paragraph is deleted and the following substituted: For this Contract, the Department will retain ownership of _____ of the milled material. Haul and stockpile the material to remain the property of the Department at the location shown in the Plans. The Contractor will take ownership of any, by the Department. Payment will be made under: Item No. 327- 70- Milling Existing Asphalt Pavement - per square

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/workbook/sp3270100-i17887.pdf?sfvrsn=6bcf0dcc_4

SP3270100-122

 MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (1-22) ARTICLE 327-1. The third paragraph is deleted and the following substituted: For this Contract, the Department will retain ownership of _____ of the milled material. Haul and stockpile the material to remain the property of the Department at the location shown in the Plans. The Contractor will take ownership of any, by the Department. Payment will be made under: Item No. 327- 70- Milling Existing Asphalt Pavement - per square

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/workbook/sp3270100-122.pdf?sfvrsn=959014f0_2

SP3270100-721

 MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (7-21) ARTICLE 327-1. The third paragraph is deleted and the following substituted: For this Contract, the Department will retain ownership of _____ of the milled material. Haul and stockpile the material to remain the property of the Department at the location shown in the Plans. The Contractor will take ownership of any, by the Department. Payment will be made under: Item No. 327- 70- Milling Existing Asphalt Pavement - per square

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/workbook/sp3270100-721.pdf?sfvrsn=7eb883d_2

SP3270100-i16422

 MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (1-21) ARTICLE 327-1. The third paragraph is deleted and the following substituted: For this Contract, the Department will retain ownership of _____ of the milled material. Haul and stockpile the material to remain the property of the Department at the location shown in the Plans. The Contractor will take ownership of any, by the Department. Payment will be made under: Item No. 327- 70- Milling Existing Asphalt Pavement - per square

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/workbook/sp3270100-i16422.pdf?sfvrsn=3ea0421a_2

SP3270100

 MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (7-20) ARTICLE 327-1. The third paragraph is deleted and the following substituted: For this Contract, the Department will retain ownership of _____ of the milled material. Haul and stockpile the material to remain the property of the Department at the location shown in the Plans. The Contractor will take ownership of any, by the Department. Payment will be made under: Item No. 327- 70- Milling Existing Asphalt Pavement - per square

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/workbook/sp3270100.pdf?sfvrsn=da35652e_2

SP3270100

 MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (1-20) ARTICLE 327-1. The third paragraph is deleted and the following substituted: For this Contract, the Department will retain ownership of _____ of the milled material. Haul and stockpile the material to remain the property of the Department at the location shown in the Plans. The Contractor will take ownership of any, by the Department. Payment will be made under: Item No. 327- 70- Milling Existing Asphalt Pavement - per square

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/january-2020/workbook/sp3270100.pdf?sfvrsn=f2c5a1fd_2

SP3270100

 MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (7-19) ARTICLE 327-1. The third paragraph is deleted and the following substituted: For this Contract, the Department will retain ownership of _____ of the milled material. Haul and stockpile the material to remain the property of the Department at the location shown in the Plans. The Contractor will take ownership of any, by the Department. Payment will be made under: Item No. 327- 70- Milling Existing Asphalt Pavement - per square

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/workbook/sp3270100.pdf?sfvrsn=a7cc0f92_2

SP3270100

 MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (1-19) ARTICLE 327-1. The third paragraph is deleted and the following substituted: For this Contract, the Department will retain ownership of _____ of the milled material. Haul and stockpile the material to remain the property of the Department at the location shown in the Plans. The Contractor will take ownership of any, by the Department. Payment will be made under: Item No. 327- 70- Milling Existing Asphalt Pavement - per square

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/workbook/sp32701003ae6741f2f304170b9e52c5ee35afd0e.pdf?sfvrsn=a82ac687_0

SP3270100

 MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (1-19) ARTICLE 327-1. The third paragraph is deleted and the following substituted: For this Contract, the Department will retain ownership of _____ of the milled material. Haul and stockpile the material to remain the property of the Department at the location shown in the Plans. The Contractor will take ownership of any, by the Department. Payment will be made under: Item No. 327- 70- Milling Existing Asphalt Pavement - per square

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/workbook/sp3270100.pdf?sfvrsn=b083d5b0_2

SP3270100

 MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (7-18) ARTICLE 327-1. The third paragraph is deleted and the following substituted: For this Contract, the Department will retain ownership of _____ of the milled material. Haul and stockpile the material to remain the property of the Department at the location shown in the Plans. The Contractor will take ownership of any, by the Department. Payment will be made under: Item No. 327- 70- Milling Existing Asphalt Pavement - per square

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/workbook/sp3270100.pdf?sfvrsn=808f83a4_0

SP3270100

 MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (1-18) ARTICLE 327-1. The third paragraph is deleted and the following substituted: For this Contract, the Department will retain ownership of _____ of the milled material. Haul and stockpile the material to remain the property of the Department at the location shown in the Plans. The Contractor will take ownership of any, by the Department. Payment will be made under: Item No. 327- 70- Milling Existing Asphalt Pavement - per square

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/workbook/sp3270100.pdf?sfvrsn=d3930520_0

7110402-724IMPL

 711 THERMOPLASTIC PAVEMENT MARKINGS. (REV 5-18-23) (FA 12-5-23) (FY 2024-25) SUBARTICLE 711-4.2.3 is deleted and the following substituted: 711-4.2.3 Preformed Thermoplastic Markings: Apply 0.125 inch or 125 mils of preformed thermoplastic material. Use preformed thermoplastic for bicycle markings, shared use path markings, 24-inch markings on special emphasis crosswalks, route shields, approved form and submit to the Engineer, the thickness of the pavement markings in accordance with FM

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/implemented/7110402-724impl.pdf?sfvrsn=6fac680a_1
20 of 7241 results