1177 search results for Action Request Form

Transit and Affordable Housing Final_Report_TM5_v3

specifically intended for workers; it is a form of affordable housing rather than a subtype in itself, that other forms of affordable housing serve non-working populations, or that non-working populations

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/transit/transit-planning-resources/transit-and-affordable-housing-final_report_tm5_v3_0d707638-6ce2-46a8-bf0d-9b4dc3736da2.pdf?sfvrsn=5240a292_2

SPM5440000-724-i19421

in determining the appropriate course of action required, either to repair or replace the existing, discrepancies require additional pay items be included on a work document, the Contractor shall request, on the Attenuator Inspection Report, Form # 850-055-12 (Attachment X). Ensure the responsible crash cushion inspector properly signs and dates the inspection report form in the appropriate fields

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/maintenance/finalized/spm5440000-724-i19421.pdf?sfvrsn=98906ba2_1

SPM5440000-725-i19899

in determining the appropriate course of action required, either to repair or replace the existing, discrepancies require additional pay items be included on a work document, the Contractor shall request, on the Attenuator Inspection Report, Form # 850-055-12 (Attachment X). Ensure the responsible crash cushion inspector properly signs and dates the inspection report form in the appropriate fields

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/maintenance/finalized/spm5440000-725-i19899.pdf?sfvrsn=8a03bc6d_1

SSM5440000-723-i18618

in determining the appropriate course of action required, either to repair or replace the existing, discrepancies require additional pay items be included on a work document, the Contractor shall request, on the Attenuator Inspection Report, Form # 850-055-12 (Attachment X). Ensure the responsible crash cushion inspector properly signs and dates the inspection report form in the appropriate fields

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/maintenance/finalized/ssm5440000-723-i18618.pdf?sfvrsn=efdecf8_2

0070101.origind

 ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information ‐ incomplete forms will be returned) Contact the State Specifications Office for assistance in completing this form. Daniel Scheer 850‐414‐4130 daniel.scheer@dot.state.fl.us Debbie Toole 850‐414‐4114, that control the action or operation of those engaged or employed in the work or that affect material used, a copy of current certificates to the Engineer upon request, to the Engineer. Ensure t h a t e mployees

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/internal/0070101.origind.pdf?sfvrsn=61ab4bae_0

2024nov-fri08-ProvenSafetyCountermeasures

treatments which are not MUTCD-compliant, an agency may request an experimentation waiver from, be installed. For full information on the experimentation waiver request process, please refer, • Committee and Council involvement NTSB Recommendations NRSS Action Items Stake h o lder input, of conflicts so that appropriate action can be taken. Cost Ranges • Low-cost (L) – up to $5,000 per mile, not have a formal policy for timing traffic signal change intervals. 72% reported minimum yellow timing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2024-november/2024nov-fri08-provensafetycountermeasures.pdf?sfvrsn=1fe8116d_1

2024nov-fri08-ProvenSafetyCountermeasures

treatments which are not MUTCD-compliant, an agency may request an experimentation waiver from, be installed. For full information on the experimentation waiver request process, please refer, • Committee and Council involvement NTSB Recommendations NRSS Action Items Stake h o lder input, of conflicts so that appropriate action can be taken. Cost Ranges • Low-cost (L) – up to $5,000 per mile, not have a formal policy for timing traffic signal change intervals. 72% reported minimum yellow timing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2024-june/2024nov-fri08-provensafetycountermeasures.pdf?sfvrsn=ca0f5744_1

fdot-bed30-977-03-rpt

) . . . . . . . . . . . . . 28 Figure 3-8 Example of management frame (type 0) with subtype known as probe request. ....... 29 Figure 3-9 Example of control frame with subtype Request-to-Send (RTS, ........................................................................................................ 38 Figure 3-21 Omni loop passenger check form, Figure 4-6 Android probe request from multiple MAC addresses, ........................................................................................ 58 Figure 5-11 Frequency profile of probe request and unique MAC during

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bed30-977-03-rpt.pdf?sfvrsn=7dd7ed98_1

ICYMI: Governor Ron DeSantis Issues Updates on Hurricane Ian Recovery

Division of Emergency Management (FDEM) At the request of Governor DeSantis, FDEM worked, to work on lodging and feeding missions across impacted areas. DCF has submitted a request, . Floridians who are not eligible for the automatic replacement can request a replacement, 866-405-2869 or by filling out an online form at: https://myfwc.com/boating/waterway/markers/damaged, or damaged waterway markers by calling 866-405-2869 or by filling out an online form here

https://www.fdot.gov/info/co/news/2022/10082022

SS1200000

investigation by the CAR Contractor will determine the course of action necessary for site security, -siteconstruction activity area that involves excavation such as a borrow pit or local aggregate pit, request in writing, a Cultural Resources Assessment. Send the request to the Division of Historical Resources, in the request the Project Identification Number, the County, a description of the property, other method, as specified in 120-9.2. The Contractor may use baffles or any form of construction he

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2009/january-2009/workbook/ss1200000.pdf?sfvrsn=824d1465_0

1200000.impl

investigation by the CAR Contractor will determine the course of action necessary for site security, that involves excavation such as a borrow pit or local aggregate pit, request in writing, a review for - cultural resources involvement. Send the request to the Division of Historical Resources (DHR, in the request the Project Identification Number, the County, a description of the property, baffles or any form of construction he may select provided the slopes of the embankments

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/implemented/1200000.impl.pdf?sfvrsn=3fc7662b_0

3340000.FHWA

Design Revisions: During production, the Contractor may request a target value revision to a mix, , to the Engineer. In order to expedite the revision process, the request for revision or discussions on the possibility of a revision may be made verbally, but must be followed up by a written request, test results are considered unverified for the material properties in question and no action shall, ). Prepare a Certification of Quantities, using the Department’s current approved form

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/fhwa/3340000.fhwa.pdf?sfvrsn=a1af6039_0

FDOT_1050.2A Assurance_2025 Signed

in connection with all Federal Highway Programs and, in adapted form, in all proposals for negotiated, in the form, or for the acquisition of real property or an interest in real property, the Assurance, assistance is to provide, or is in the form of, personal property, or real property, or interest therein, by the FHWA. You must keep records, reports, and submit the material for review upon request to FHWA, , the Regulations and directives issued pursuant thereto. The contractor will take action with respect to any

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/equalopporunity/titlevi/fdot_1050-2a-assurance_2025-signed.pdf?sfvrsn=8ddb7f16_1

Florida TIM Responder - March 2020

call to action has exceeded the normal expectations of a Road Ranger , a n d F D OT’s Road Rangers, for an unresponsive male in their vehicle. Upon assessment, Scott’s former experience as a firefighter and law, an owner request tow 17 ,703 crashes occurred on Interstates/To l l Roads 1,9 96 of 17 ,703 Interstate

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/cvotim/tim/newletters/florida-tim-responder---march-2020.pdf?sfvrsn=1666d5aa_1

STIP TPM

additional days after the state DOT or provider takes action. Development of the STIP The Florida, links the Work Program and the Legislative Budget Request (LBR) to accomplish the mission, FDOT Districts based on statutory formula to allow the Districts to have more clearly defined funding, environment. The FMTP moves from vision to action by:  Referencing the Florida Transportation, agencies who are direct recipients of Section 5307 Urbanized Area Formula Grants are responsible

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/fto/pdis-documents/stip-tpm.pdf?sfvrsn=ad9b22ad_1

4500203-722FHWA

. Keep the measurement records on file for review upon request by the Engineer. Notify, of action is appropriate. 1. If the QC Manager or designee determines that a deficiency is a cosmetic, Noncomplying Prestressed/Precast Concrete Component Data Sheet (Form No. 700-030-10) to the Engineer within, calendar days prior to shipping. Keep the measurement records on file for review upon request, , to determine the applicable provisions and requirements of this Article and which course of action

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/fhwa/4500203-722fhwa.pdf?sfvrsn=b5c5ff8d_2

44169312202-CE2-D4-ApprovedType2CEDeterminationReport_SR-5_US-1_-2024-1206

 ADMINISTRATIVE ACTION TYPE 2 CATEGORICAL EXCLUSION Florida Department of Transportation SR-5/US-1 AT AVIATION BOULEVARD District: FDOT District 4 County: Indian River County ETDM Number, May 26, 2022, and executed by the Federal Highway Administration and FDOT. This action has been, ) due to the non-residential land uses. Thirty-second (32nd) Street forms the westbound approach, in the form of dust from earthwork and unpaved roads. These impacts will be minimized by adherence

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/sr5aviationblvdpde/44169312202-ce2-d4-approvedtype2cedeterminationreport_sr-5_us-1_-2024-1206.pdf?sfvrsn=77cf4f16_1

1c-c-UAM

, Formerly 14-46.01, Amended 7-5-90, 6-8-93, 10-15-96, 8-30-99, 11- 10-05, 1-24-08, 1-30-11, 7-30-17, to resolve a dispute with an FDOT District or the Turnpike Enterprise, the UAO shall request a review, for protection and safety; and/or take any action required by FDOT’s State Utility Engineer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2024-fall-construction-academy/1c-c-uam.pdf?sfvrsn=82374bd8_1

1c-c-UAM

, Formerly 14-46.01, Amended 7-5-90, 6-8-93, 10-15-96, 8-30-99, 11- 10-05, 1-24-08, 1-30-11, 7-30-17, to resolve a dispute with an FDOT District or the Turnpike Enterprise, the UAO shall request a review, for protection and safety; and/or take any action required by FDOT’s State Utility Engineer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2025-spring-construction-academy/1c-c-uam.pdf?sfvrsn=bde37ec5_1

4500203-722impl

for review upon request by the Engineer. Notify the Engineer immediately when the sweep or camber, the applicable provisions and requirements of this Article and which course of action is appropriate. 1, Prestressed/Precast Concrete Component Data Sheet (Form No. 700-030-10) to the Engineer within 30

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/implemented/4500203-722impl.pdf?sfvrsn=4cdcabf5_2
20 of 1177 results