3761 search results for REPORT NUMBER
20240412_AOR_Study_Webinar_Agenda
Dr. Phillip Stevens, Chairman Christinne Gray, Commissioner Lillian Barrios, Commissioner Renee Knight, Commissioner Dr. Robin Tellez, Commissioner COMMISSION FOR THE TRANSPORTATION DISADVANTAGED Annual Operating Report (AOR) Study Webinar April 12, 2024 1:30 PM until Completion Join the meeting now (Microsoft Teams) Conference Call-In Number: 850-792-2565 Conference Code: 144 668 30# Item # Agenda Item Speaker(s) I. Welcome and Introduction David Darm, Executive Director II
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/workshopdocs/2024/20240412_aor_study_webinar_agenda.pdf?sfvrsn=20d00917_1Exhibit 907-1
https://tinyurl.com/367v2589 PROJECT LOCATION URL: BEGIN MP 1.560 - END MP 7.560 NONE BR#469998 MP 3.422 - MP 3.471 NONE PROJECT LIMITS: EXCEPTIONS: BRIDGE LIMITS: RAILROAD CROSSING: BEN K. UWAIBI, P.E. FDOT PROJECT MANAGER: DEVELOPED BY: RFP CONCEPT PLANS 123 MAIN STREET TALLAHASSEE, FL 32301 CONTRACT NO.: C0000 LUKE S. WALKER, P.E. P.E. LICENSE NUMBER 99991 ROADWAY, MITIGATION PLAN 17 SELECTIVE CLEARING AND GRUBBING 15 - 16 REPORT OF CORE BORINGS 12 - 14 SOIL
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/exhibit-907-1.pdf?sfvrsn=a2e6cb40_120240827_CTD_Public_Workshop-Model_Procedures_Agenda
CTD Public Workshop: Model Procedures for Reporting Adverse Incidents with Paratransit Services Objective: Gather feedback on proposed model procedures for transportation service providers to investigate and report adverse incidents related to paratransit services to persons with disabilities, pursuant to s. 427.021, F.S. Date: Tuesday, August 27, 2024 Time: Webinar/Phone Conference: 2, -in Phone Number 1-850-739-5589,,59304778# Agenda Item I. Welcome and Meeting Rules II
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/meetingpackages/2024meetings/20240827_ctd_public_workshop-model_procedures_agenda.docx?sfvrsn=25934365_1Exhibit 907-1
https://tinyurl.com/367v2589 PROJECT LOCATION URL: BEGIN MP 1.560 - END MP 7.560 NONE BR#469998 MP 3.422 - MP 3.471 NONE PROJECT LIMITS: EXCEPTIONS: BRIDGE LIMITS: RAILROAD CROSSING: BEN K. UWAIBI, P.E. FDOT PROJECT MANAGER: DEVELOPED BY: RFP CONCEPT PLANS 123 MAIN STREET TALLAHASSEE, FL 32301 CONTRACT NO.: C0000 LUKE S. WALKER, P.E. P.E. LICENSE NUMBER 99991 ROADWAY, MITIGATION PLAN 17 SELECTIVE CLEARING AND GRUBBING 15 - 16 REPORT OF CORE BORINGS 12 - 14 SOIL
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/exhibit-907-1.pdf?sfvrsn=493892fc_1SPI-700-010
Cooperative Highway Research Program (NCHRP) Report 350. Design Assumptions and Limitations See, Requirements See the FDM 325. Payment Item number Item Description Unit Measure 700-1-1B Single
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/spi/spi-700-010.pdf?sfvrsn=e744b434_1SPI-700-010
of the National Cooperative Highway Research Program (NCHRP) Report 350 . Design Assumptions, See the FDM 940 . Payment Item number Item Description Unit Measure 700-1-1B Single Post Sign
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/spi/spi-700-010313f6cd0-2db1-4f87-8f5d-d38b0122c96c.pdf?sfvrsn=fdced8f8_120241211_CTD_Business_Meeting_Agenda
COMMISSION FOR THE TRANSPORTATION DISADVANTAGED Business Meeting Agenda December 11, 2024 11:00 AM EST until Completion 3185 S Blair Stone Road, Room 229 Tallahassee, FL 32301 Join the meeting now (Microsoft Teams) Conference Call-In Number: 1-850-739-5589 Conference Code: 453090457 Item # Agenda Item Speaker(s) I. Call to Order Chair Monica Russell II. Pledge of Allegiance Chair, Annual Performance Report Karen Somerset, CTD Interim Executive Director Information Items VIII
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/meetingpackages/2024meetings/20241211_ctd_business_meeting_agenda.pdf?sfvrsn=6f5abd9d_1FHWA-TPM-Updates
Bridge Inspection Training Under Development • High number – mostly D2, D3 • Maintained by Local, , PM3 Complete - Baseline report due • Targets due to be set by FDOT for next 4 years
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2022/fhwa-tpm-updates.pdf?sfvrsn=d1ca6a1d_1Lane Repurposing Inital Meeting Checklist_02.05.25
Lane Repurposing Initial Meeting Checklist The applicant should utilize the following list of items as a starting point for discussion in the initial meeting. This list is intended to provide an understanding of the scope of information required to prepare a Lane Repurposing Concept Report, however, project specific information may be required by the District Review Team Applicant, , stop locations, total number of stops and routes in the area. Impact on school crossing
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/systems/systems-management/document-repository/lane-repurposing/lane-repurposing-inital-meeting-checklist_02-05-25.docx?sfvrsn=c02edba1_1SPM1100200-724-i19198
of restoring the fence will be included in the cost of clearing and grubbing. Report to the Engineer, for will be the number of square yards of flexible pavement removed. Measurements will be rounded
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/maintenance/finalized/spm1100200-724-i19198.pdf?sfvrsn=a72578b4_1SPM1100200-725-i19877
of restoring the fence will be included in the cost of clearing and grubbing. Report to the Engineer, for will be the number of square yards of flexible pavement removed. Measurements will be rounded
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/maintenance/finalized/spm1100200-725-i19877.pdf?sfvrsn=a7bbf827_1SPM1100200-723-i18576
of restoring the fence will be included in the cost of clearing and grubbing. Report to the Engineer, before, for will be the number of square yards of flexible pavement removed. Measurements will be rounded up
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/maintenance/finalized/spm1100200-723-i18576.pdf?sfvrsn=ffe86b11_2SPM1100200-122
the fence will be included in the cost of clearing and grubbing. Report to the Engineer, before, for will be the number of square yards of flexible pavement removed. Measurements will be rounded up
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/maintenance/finalized/spm1100200-122.pdf?sfvrsn=1e746512_2SPM1100200-722
the fence will be included in the cost of clearing and grubbing. Report to the Engineer, before, for will be the number of square yards of flexible pavement removed. Measurements will be rounded up
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/maintenance/finalized/spm1100200-722.pdf?sfvrsn=3a853ef6_2SPM1100200-721
the fence will be included in the cost of clearing and grubbing. Report to the Engineer, before, for will be the number of square yards of flexible pavement removed. Measurements will be rounded up
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/maintenance/finalized/spm1100200-721.pdf?sfvrsn=3b7f3bd_2SP1100200-i16416
of restoring the fence will be included in the cost of clearing and grubbing. Report, pavement, the quantity to be paid for will be the number of square yards of flexible pavement removed
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/maintenance/finalized/sp1100200-i16416.docx?sfvrsn=6babc420_2SP1100200
of restoring the fence will be included in the cost of clearing and grubbing. Report, pavement, the quantity to be paid for will be the number of square yards of flexible pavement removed
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/maintenance/finalized/sp1100200.docx?sfvrsn=aaca12c4_2SS5800000PBcomm&resp
or quarterly inspection report as prescribed in the specification. It does allow for not paying the contractor (580-9.2) until received, but there is no deduction for the number of days it is late, in the report(s) as indicated in the specification. In addition, what if the monthly report is not filled, to be conducted, a report be provided in an excel spreadsheet or access data base of the moisture reading, irrigation system components. Primary recommendation is to remove 580-5.2 number 5. Soil moisture level
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/maintenance/comments-responses/ss5800000pbcomm-resp.pdf?sfvrsn=ffbb6c54_2SP1100200.D01clean
in the cost of clearing and grubbing. Report to the Engineer, before beginning work, all damaged, for will be the number of square yards of flexible pavement removed. Measurements will be rounded up to the nearest
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/maintenance/implemented/sp1100200.d01clean.pdf?sfvrsn=9b08929c_01020917.resp
1020917 Maintenance of Traffic COMMENTS FROM INTERNAL/INDUSTRY REVIEW Karen Byram (850)414-4353 Comments: (Internal, 10-10-17) The NCHRP reference in this spec is a report number and therefore should be NCHRP 350. MASH is a program title. MASH without the year, 2016, is OK because FDOT uses the most recent version when a date is not listed (S1-2 last paragraph). Response: Agree. 350 will be added. Change made
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/comments-responses/1020917.resp.pdf?sfvrsn=ce7d7c0a_0