2219 search results for bridge inspection

2024FDM152ShopDrawings

bridge components (e.g., steel girders, non-standard precast/prestressed beams) typically include, of demolition plans of a bridge with continuous beams or girders where one span within the unit, manuals, and erection plans affecting public safety. This includes demolition plans of a bridge, drainage structures (except bridge items such as poles and bracket arms, or as noted below) in accordance, directed at the project's preconstruction conference. Submittals related to bridge items must

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm152shopdrawings.pdf?sfvrsn=64803fb_2

2025FDM152ShopDrawings

for structural bridge components (e.g., steel girders, non-standard precast/prestressed beams) typically, and erection plans. Figure 152.11.4 also shows the flow of demolition plans of a bridge with continuous, manuals, and erection plans affecting public safety. This includes demolition plans of a bridge, plans such as attenuators and non-standard drainage structures (except bridge items such as poles, . Submittals related to bridge items must be transmitted to the Department as previously described

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm152shopdrawings.pdf?sfvrsn=41ccee65_2

2025FDM152ShopDrawings

for structural bridge components (e.g., steel girders, non-standard precast/prestressed beams) typically, shows the flow of demolition plans of a bridge with continuous beams or girders where one span, , erection manuals, and erection plans affecting public safety. This includes demolition plans of a bridge, to roadway plans such as attenuators and non-standard drainage structures (except bridge items, preconstruction conference. Submittals related to bridge items must be transmitted to the Department

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm152shopdrawings.pdf?sfvrsn=be9eaa0a_1

2026FDM152ShopDrawings

submittal for structural bridge components (e.g., steel girders, non-standard precast/prestressed beams, of a bridge with continuous beams or girders where one span within the unit is over traffic. Use electronic, . This includes demolition plans of a bridge with continuous beams or girders where one span within, structures (except bridge items such as poles and bracket arms, or as noted below) in accordance, at the project's preconstruction conference. Submittals related to bridge items must

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm152shopdrawings.pdf?sfvrsn=7d055215_2

2026FDM152ShopDrawings

submittal for structural bridge components (e.g., steel girders, non-standard precast/prestressed beams, of a bridge with continuous beams or girders where one span within the unit is over traffic. Use electronic, . This includes demolition plans of a bridge with continuous beams or girders where one span within, structures (except bridge items such as poles and bracket arms, or as noted below) in accordance, at the project's preconstruction conference. Submittals related to bridge items must

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm152shopdrawings.pdf?sfvrsn=dbde73d8_1

2024nov-thu02-WorkProgram

include Preliminary Engineering, Right of Way, and Construction, Engineering, Inspection phases. SUMMARY, . Construction Overview Lettings 19 Highway/Bridge Programs only: Resurfacing, Bridge, Roadway, ROADWAY $2,835.78 RESURFACING $1,670.90 BRIDGE $308.69 SAFETY $78.68 SCOP $31.69 TRAFFIC, ) - $ in Millions Fiscal Year Roadway Resurfacing Bridge Safety SCOP Traffic To tal FY 2024/25 $308.69 $2,835.78, 2025/26 FY 2026/27 FY 2027/28 Bridge ($M) Construction Overview FY 2025 - FY 2028 Planned

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2024-november/2024nov-thu02-workprogram.pdf?sfvrsn=9825fb0a_1

2024nov-thu02-WorkProgram

include Preliminary Engineering, Right of Way, and Construction, Engineering, Inspection phases. SUMMARY, . Construction Overview Lettings 19 Highway/Bridge Programs only: Resurfacing, Bridge, Roadway, ROADWAY $2,835.78 RESURFACING $1,670.90 BRIDGE $308.69 SAFETY $78.68 SCOP $31.69 TRAFFIC, ) - $ in Millions Fiscal Year Roadway Resurfacing Bridge Safety SCOP Traffic To tal FY 2024/25 $308.69 $2,835.78, 2025/26 FY 2026/27 FY 2027/28 Bridge ($M) Construction Overview FY 2025 - FY 2028 Planned

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2024-june/2024nov-thu02-workprogram.pdf?sfvrsn=75267ea8_1

section92-051019

– Construction Inspection and Approval, Subpart B – Quality Assurance Procedures for Construction Sections, , 301 and 318. Florida Department of Transportation Standard Specifications for Road and Bridge, . The Plants may request a reduced scheduling frequency for the plant Plant inspections from the District Materials and Research Engineer (DMRE). The reduced inspection scheduling frequency shall, %. (1)(3) Previous Plant inspections, correction of any deficiencies noted, failing samples attributed

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/materials-manual/section92-051019.pdf?sfvrsn=836aefe3_1

section92-051019

– Construction Inspection and Approval, Subpart B – Quality Assurance Procedures for Construction Sections, , 301 and 318. Florida Department of Transportation Standard Specifications for Road and Bridge, . The Plants may request a reduced scheduling frequency for the plant Plant inspections from the District Materials and Research Engineer (DMRE). The reduced inspection scheduling frequency shall, %. (1)(3) Previous Plant inspections, correction of any deficiencies noted, failing samples attributed

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/materials-manual/section92-051019.pdf?sfvrsn=da68ce4_1

Section92V2

Operations, Part 637 – Construction Inspection and Approval, Subpart B – Quality Assurance, Specifications for Road and Bridge Construction. Florida Department of Transportation Approved Products, frequency for the Plant inspections from the District Materials and Research Engineer (DMRE). The reduced inspection scheduling frequency will be based on the following items: (1) When the specified, be equal to or less than 5%. (3) Previous Plant inspections, correction of any deficiencies noted

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/materials-manual/redline/section92v2.pdf?sfvrsn=77694222_1

D4 Public Hearing Report 2026 - Martin

SE BRIDGE ROAD TO HOBE SOUND WILDLIFE REFUGE Type of Work: BIKE PATH/TRAIL Phase Fund Code 2026, $4,551,717 Total for Project 447650-1 $7,366,591 447868-1 - SR-9/I-95 MARTIN WEIGH STATION - INSPECTION, MARTIN COUNTY Highways 448089-1 - CR-708/SE BRIDGE ROAD BASCULE BRIDGE REHABILITATION Type of Work: BRIDGE-REPAIR/REHABILITATION Phase Fund Code 2026 2027 2028 2029 2030 Construction GRSC $285,938, - SR-5/US-1 FROM SE BRIDGE ROAD TO OSPREY STREET Type of Work: BIKE PATH/TRAIL Phase Fund Code 2026 2027

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d4_documents/d4-public-hearing-report-2026---martin.pdf?sfvrsn=d3e26f7e_3

2024FDM128FedAidCert

, contract administration, and project inspections on Federal-aid highway projects except for those, bridge typical sections. (2) Pavement Design Package: The pavement design is developed, of the package in lieu of FHWA review and concurrence. (3) Bridge Hydraulics Report: The hydraulics, the acceptability of the package in lieu of FHWA review and concurrence. (4) Bridge Development Report: The bridge development report is developed and approved by the responsible professional engineer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm128fedaidcert.pdf?sfvrsn=2578fe92_1

2025FDM128FedAidCert

administration, and project inspections on Federal-aid highway projects except for those projects, be required on unusual bridge typical sections. (2) Pavement Design Package: The pavement design, the acceptability of the package in lieu of FHWA review and concurrence. (3) Bridge Hydraulics Report, to document the acceptability of the package in lieu of FHWA review and concurrence. (4) Bridge Development Report: The bridge development report is developed and approved by the responsible

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm128fedaidcert.pdf?sfvrsn=912e803c_1

2025FDM128FedAidCert

, contract administration, and project inspections on Federal-aid highway projects except for those, bridge typical sections. (2) Pavement Design Package: The pavement design is developed, of the package in lieu of FHWA review and concurrence. (3) Bridge Hydraulics Report: The hydraulics, the acceptability of the package in lieu of FHWA review and concurrence. (4) Bridge Development Report: The bridge development report is developed and approved by the responsible professional engineer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm128fedaidcert.pdf?sfvrsn=f586812a_2

2026FDM128FedAidCert

, contract awards, contract administration, and project inspections on Federal-aid highway projects except, . Concurrence from the District Structures Design Engineer may also be r equired on unusual bridge, the acceptability of the package in lieu of FHWA review and concurrence. (3) Bridge Hydraulics Report, to document the acceptability of the package in lieu of FHWA review and concurrence. (4) Bridge Development Report: The bridge development report is developed and approved by the responsible professional

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm128fedaidcert.pdf?sfvrsn=e6512668_4

2026FDM128FedAidCert

, contract awards, contract administration, and project inspections on Federal-aid highway projects except, . Concurrence from the District Structures Design Engineer may also be r equired on unusual bridge, the acceptability of the package in lieu of FHWA review and concurrence. (3) Bridge Hydraulics Report, to document the acceptability of the package in lieu of FHWA review and concurrence. (4) Bridge Development Report: The bridge development report is developed and approved by the responsible professional

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm128fedaidcert.pdf?sfvrsn=97d711d2_2

E1W50RFP

For Hollandtown Road over Lake Dale Branch Bridge Replacement Financial Projects Number(s, Hollandtown Rd. over Lake Dale Branch Bridge Replacement January 22, 2024 Version 2023-01c dated, for Proposal E1W50 Hollandtown Rd. over Lake Dale Branch Bridge Replacement January 22, 2024 Version, Engineering and Inspection: ........................................................... 2 5 U. Testing, : .............................................................................................. 4 3 Request for Proposal E1W50 Hollandtown Rd. over Lake Dale Branch Bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1w50/e1w50rfp.pdf?sfvrsn=4721637_1

Design Build Boilderplate7-21

” is also deemed to include a Design-Build Firm submitting a proposal for the proposed work. Bridge, of end supports. A multiple-span box culvert is considered a bridge, where the length between, structure not classified as a bridge that provides an opening under the roadway. Delay. Any, the project’s design and construction phases, and in some cases construction engineering and inspection, , assigned to make official inspections of the materials furnished and of the work performed

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/design-build/design-build-boilderplate7-21.pdf?sfvrsn=c9a57b1d_2

Design Build 1-22

a Design-Build Firm submitting a proposal for the proposed work. Bridge. A structure, including, -span box culvert is considered a bridge, where the length between the extreme ends of the openings, as a bridge that provides an opening under the roadway. Delay. Any unanticipated event, action, force, and construction phases, and in some cases construction engineering and inspection, into a single Contract, inspections of the materials furnished and of the work performed by the Contractor. Laboratory

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/design-build/design-build-1-22.pdf?sfvrsn=85d1ff96_3

1c-c-UAM

/products/1237425. Posting of this manual for public inspection would violate federal copyright law. A copy is available for public inspection during regular business hours at the Florida Department, of this manual for public inspection would violate federal copyright law. A copy is available for public inspection during regular business hours at the Florida Department of Transportation, Program, inspection would violate federal copyright law. A copy is available for public inspection during

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2024-fall-construction-academy/1c-c-uam.pdf?sfvrsn=82374bd8_1
20 of 2219 results