3596 search results for REPORT NUMBER

FHWA-TPM-Updates

Bridge Inspection Training Under Development • High number – mostly D2, D3 • Maintained by Local, , PM3 Complete - Baseline report due • Targets due to be set by FDOT for next 4 years

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2022/fhwa-tpm-updates.pdf?sfvrsn=d1ca6a1d_1

Lane Repurposing Inital Meeting Checklist_02.05.25

Lane Repurposing Initial Meeting Checklist The applicant should utilize the following list of items as a starting point for discussion in the initial meeting. This list is intended to provide an understanding of the scope of information required to prepare a Lane Repurposing Concept Report, however, project specific information may be required by the District Review Team  Applicant, , stop locations, total number of stops and routes in the area. Impact on school crossing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/systems/systems-management/document-repository/lane-repurposing/lane-repurposing-inital-meeting-checklist_02-05-25.docx?sfvrsn=c02edba1_1

SPM1100200-724-i19198

of restoring the fence will be included in the cost of clearing and grubbing. Report to the Engineer, for will be the number of square yards of flexible pavement removed. Measurements will be rounded

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/maintenance/finalized/spm1100200-724-i19198.pdf?sfvrsn=a72578b4_1

SPM1100200-725-i19877

of restoring the fence will be included in the cost of clearing and grubbing. Report to the Engineer, for will be the number of square yards of flexible pavement removed. Measurements will be rounded

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/maintenance/finalized/spm1100200-725-i19877.pdf?sfvrsn=a7bbf827_1

SPM1100200-723-i18576

of restoring the fence will be included in the cost of clearing and grubbing. Report to the Engineer, before, for will be the number of square yards of flexible pavement removed. Measurements will be rounded up

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/maintenance/finalized/spm1100200-723-i18576.pdf?sfvrsn=ffe86b11_2

SPM1100200-122

the fence will be included in the cost of clearing and grubbing. Report to the Engineer, before, for will be the number of square yards of flexible pavement removed. Measurements will be rounded up

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/maintenance/finalized/spm1100200-122.pdf?sfvrsn=1e746512_2

SPM1100200-722

the fence will be included in the cost of clearing and grubbing. Report to the Engineer, before, for will be the number of square yards of flexible pavement removed. Measurements will be rounded up

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/maintenance/finalized/spm1100200-722.pdf?sfvrsn=3a853ef6_2

SPM1100200-721

the fence will be included in the cost of clearing and grubbing. Report to the Engineer, before, for will be the number of square yards of flexible pavement removed. Measurements will be rounded up

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/maintenance/finalized/spm1100200-721.pdf?sfvrsn=3b7f3bd_2

SP1100200-i16416

of restoring the fence will be included in the cost of clearing and grubbing. Report, pavement, the quantity to be paid for will be the number of square yards of flexible pavement removed

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/maintenance/finalized/sp1100200-i16416.docx?sfvrsn=6babc420_2

SP1100200

of restoring the fence will be included in the cost of clearing and grubbing. Report, pavement, the quantity to be paid for will be the number of square yards of flexible pavement removed

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/maintenance/finalized/sp1100200.docx?sfvrsn=aaca12c4_2

SS5800000PBcomm&resp

or quarterly inspection report as prescribed in the specification. It does allow for not paying the contractor (580-9.2) until received, but there is no deduction for the number of days it is late, in the report(s) as indicated in the specification. In addition, what if the monthly report is not filled, to be conducted, a report be provided in an excel spreadsheet or access data base of the moisture reading, irrigation system components. Primary recommendation is to remove 580-5.2 number 5. Soil moisture level

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/maintenance/comments-responses/ss5800000pbcomm-resp.pdf?sfvrsn=ffbb6c54_2

SP1100200.D01clean

in the cost of clearing and grubbing. Report to the Engineer, before beginning work, all damaged, for will be the number of square yards of flexible pavement removed. Measurements will be rounded up to the nearest

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/maintenance/implemented/sp1100200.d01clean.pdf?sfvrsn=9b08929c_0

1020917.resp

 1020917 Maintenance of Traffic COMMENTS FROM INTERNAL/INDUSTRY REVIEW Karen Byram (850)414-4353 Comments: (Internal, 10-10-17) The NCHRP reference in this spec is a report number and therefore should be NCHRP 350. MASH is a program title. MASH without the year, 2016, is OK because FDOT uses the most recent version when a date is not listed (S1-2 last paragraph). Response: Agree. 350 will be added. Change made

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/comments-responses/1020917.resp.pdf?sfvrsn=ce7d7c0a_0

1080201.FHWA

Specialty Engineer. Prepare two reports documenting the condition of the structures: one report before, construction, and a second report after completing such construction operations. Include in the reports, the Engineer’s approval for the number and location of monitoring points. Survey and monitor, the Engineer’s approval of the number and locations of the monitoring points. Upon e i t h e r d e t e c t, Specialty Engineer. Prepare two reports documenting the condition of the structures: one report before

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/fhwa/1080201.fhwa.pdf?sfvrsn=324ac018_0

6460202.impl

 646 ALUMINUMPOLES,PEDESTALS,ANDPOSTS. (REV10-14-15)(FA12-27-15)(7-16) SUBARTICLE646-2.2isdeletedandthefollowingsubstituted: 646-2.2TransformerBase: Use transformer bases listed on the Department’s Approved Product List (APL). ManufacturersseekingAPLapprovalofproprietarytransformerbasesmust submit an application in accordance with Section 6, independent laboratory test report, i b l y marked with the manufacturer’s name or logo and the model number

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/implemented/6460202.impl.pdf?sfvrsn=96d9d0bf_0

D6_ 2022 Truck Parking Supply & Demand Study

 Master Plan Final Report June 2022 MASTER PLAN FINAL REPORT TRUCK PARKING SUPPLY & DEMAND, FINAL REPORT ii TRUCK PARKING SUPPLY & DEMAND STUDY 5.2.1 Capacity, ................................... 36 MASTER PLAN FINAL REPORT TRUCK PARKING SUPPLY & DEMAND STUDY iii, ..................................................................................... 47 MASTER PLAN FINAL REPORT iv, shortage. This report “laid the foundation” for future studies and launched the initiatives regarding

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/rail/publications/d6/d6_-2022-truck-parking-supply-demand-study.pdf?sfvrsn=61630210_1

LAFAYETTE_Draft Tentative Work Program Public Hearing_By Project_10-11-2023

 Draft Tentative Five-Year Work Program Public Hearing Summary Report - As of October 11, 2023, Hearing Summary Report - As of October 11, 2023 July 1, 2024 through June 30, 2029 Florida, Tentative Five-Year Work Program Public Hearing Summary Report - As of October 11, 2023 July 1, 2024, BRITT CREEK BRIDGE NUMBER 330014 Type of Work: BRIDGE REPLACEMENT Phase Funding Source 2025 2026, Tentative Five-Year Work Program Public Hearing Summary Report - As of October 11, 2023 July 1, 2024

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/lafayette_draft-tentative-work-program-public-hearing_by-project_10-11-2023.pdf?sfvrsn=750832a7_1

LAFAYETTE_Draft Tentative Work Program Public Hearing_D2 By Description_10-11-2023

 Draft Tentative Five-Year Work Program Public Hearing Summary Report - As of October 11, 2023, Public Hearing Summary Report - As of October 11, 2023 July 1, 2024 through June 30, 2029 Florida, Draft Tentative Five-Year Work Program Public Hearing Summary Report - As of October 11, 2023 July, CREEK BRIDGE NUMBER 330014 Type of Work: BRIDGE REPLACEMENT Phase Funding Source 2025 2026 2027 2028, $4,156,552 Draft Tentative Five-Year Work Program Public Hearing Summary Report - As of October 11

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/lafayette_draft-tentative-work-program-public-hearing_d2-by-description_10-11-2023.pdf?sfvrsn=26033e95_1

OOM_20240403_FDOT-Guidance-for-Highway-Tunnel Inspection

. Annual Critical Tunnel Deficiency Report to the FHWA – The following procedure shall be used to report critical findings to the FHWA:  At the start of each calendar year, the district will email the FHWA division Bridge Engineer and the Tunnel Inspection Program Manager a summary report, parts of the inspection report. All CTIs shall be approved by FDOT before they can serve, , then a certificate and CTI number will be issued. Guidance will be provided to unsuccessful applicants

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/maintenance/str/ti/oom_20240403_fdot-guidance-for-highway-tunnel-inspection.pdf?sfvrsn=4da6e42f_1

0071400int

 Origination Form Specifications Name: Taylor Carlquist Specification Number: 7-14 Email: taylor.carlquist@dot.state.fl.us Associated Specs: None Date: 2024-06-25T16:01:22Z Verified: VERIFIED, has contacted law enforcement within 14 days of the damage, filed a report, and provided the report to the Department within 14 calendar days of receiving the report from law enforcement. Upon submission of the report to the Department, the Department solely retains the right to pursue recovery

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/review/fy2025-26/internal/0071400int.pdf?sfvrsn=4f86a0b_1
20 of 3596 results