13231 search results for DESIGN

0090201DB.FHWA

Construction Engineer SP0090201DB Design Build Boilerplate MEASUREMENT AND PAYMENT. (REV 11-3-16, Design Build Boilerplate Where ID = Index Difference = [CAPI - 0.95(BAPI)] when the API has decreased, Estimate as required in 9-11. SP0090201DB Design Build Boilerplate Payment on progress estimates, a mix design with 6.25% liquid asphalt weighing 8.58 pounds per gallon. For asphalt treated permeable base, the number of gallons will be determined assuming a mix design with 3% liquid asphalt

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/fhwa/0090201db.fhwa.pdf?sfvrsn=61c0ae8_0

D0040003.do

a substantial change in the nature of the design or in the type of construction or which materially, direction regarding the proper connections in accordance with the Design Standards, initiated changes in the design or construction activities from those in the original Contract Specifications, design plans (including traffic control plans) or other Contract Documents and which effect, of maintenance, aesthetics and necessary standard design features. However, nothing herein prohibits

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2003/january-2003/workbook/d0040003.do.pdf?sfvrsn=d77de1ca_0

Program Management Bulletin 18-05

32399-0450 MIKE DEW SECRETARY www.fdot.gov ROADWAY DESIGN BULLETIN 18-07 PROGRAM MANAGEMENT, of Transportation Operations, District Directors of Transportation Development, District Design Engineers, Engineers, District Roadway Design Engineers, District Traffic Operations Engineers, District, Design Engineer Stefanie D. Maxwell, P.E., Manager, Program Management Office COPIES: Brian, Envelope ID: 6D95E318-E511-4A1B-8698-13BC7DC1D284 Roadway Design Bulletin 18-07 Program Management

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/bulletins/fpo/2018/program-management-bulletin-18-05.pdf?sfvrsn=a652d177_1

programmanagementbulletin18-05

32399-0450 MIKE DEW SECRETARY www.fdot.gov ROADWAY DESIGN BULLETIN 18-07 PROGRAM MANAGEMENT, of Transportation Operations, District Directors of Transportation Development, District Design Engineers, Engineers, District Roadway Design Engineers, District Traffic Operations Engineers, District, Design Engineer Stefanie D. Maxwell, P.E., Manager, Program Management Office COPIES: Brian, Envelope ID: 6D95E318-E511-4A1B-8698-13BC7DC1D284 Roadway Design Bulletin 18-07 Program Management

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/resources/bulletins/2018/programmanagementbulletin18-05.pdf?sfvrsn=1b58be0b_1

Exhibit 904-1

ARCHITECT OF RECORD ORLANDO, FL 32801 345 IVY LANE LAND DESIGN, LLC. LICENSE NUMBER: 99999, WITH DESIGN TEAM TO PRESERVE EXISTING VEGETATION TO GREATEST EXTENT MAINTENANCE. THE RETENTION PONDS, LEVEL I (LOW PROFILE AREA) - PLANTING THAT SUPPORT THE OVERALL DESIGN. LEVEL II (MODERATE IMPACT AREA, INTERCHANGE) MAY AFFECT DESIGN CONSIDERATIONS DELINEATED ON THE LANDSCAPE OPPORTUNITY PLANS. 2, CHANGE TO REFLECT THE FINAL DESIGN. 3. MAINTAIN THE PRESERVATION AND PLANTING AREAS SHOWN

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/exhibit-904-1.pdf?sfvrsn=163eb61d_1

3500000SS

, and that are designed so as to remain straight and true. Use a handle for both types of tool, and Screeding: Use a portable screed of an approved design, constructed either of metal or of other suitable, shown in the Design Standards, Index No. 305 and the Contract Documents. 350-12.2 Longitudinal Joints, filler, and provide them with dowel load transfer, in accordance with the details shown on the Design, the specified period of time has elapsed in accordance with the current edition of the Design Standards

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2005/january-2005/workbook/3500000ss.pdf?sfvrsn=105877e7_0

fdot-bdv30-977-31-rpt

, especially vulnerable populations users. Existing resilience guidelines are mostly designed based, of the transportation system’s resilience in Florida were gathered through a survey designed to understand

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bdv30-977-31-rpt.pdf?sfvrsn=3d592981_3

BDV30 977-31 - Vulnerable Populations_Final Report-August2022-AbdelRazig (1)

, especially vulnerable populations users. Existing resilience guidelines are mostly designed based, of the transportation system’s resilience in Florida were gathered through a survey designed to understand

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/policy/resilience/bdv30-977-31---vulnerable-populations_final-report-august2022-abdelrazig-(1).pdf?sfvrsn=40d1b1f8_1

44912015201-PLANS-01-ROADWAY

/design/standardplans Standard Plans for Road Construction and associated IRs are available, AADT = 11,200 ESTIMATED OPENING YEAR = 2025AADT = 11,600 ESTIMATED DESIGN YEAR = 2045 AADT = 15,600 K =9.0% D = 99.9% T = 7.9% (24 HOUR) DESIGN HOUR T = 3.95% DESIGN SPEED = 60 MPH CONTEXT, ://patelgreene-pw.bentley.com:patelgreene-pw-01/Documents/Design, -pw-01/Documents/Design/FDOT-D1/Projects/44912015201/Survey/CTLSRD02.dgn USER: Saray.Puello 3/8/2024 9

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25127/44912015201-plans-01-roadway.pdf?sfvrsn=a83c0a45_1

44912015201-PLANS-01-ROADWAY (1)

in the Structures Plans following website: http://www.fdot.gov/design/standardplans Standard Plans, = 11,200 ESTIMATED OPENING YEAR = 2025AADT = 11,600 ESTIMATED DESIGN YEAR = 2045 AADT = 15,600 K =9.0% D = 99.9% T = 7.9% (24 HOUR) DESIGN HOUR T = 3.95% DESIGN SPEED = 60 MPH CONTEXT, -pw.bentley.com:patelgreene-pw-01/Documents/Design/FDOT-D1/Projects/44912015201/Survey/CTLSRD01.dgn USER, OF TRANSPORTATION PROJECT CONTROL pw://patelgreene-pw.bentley.com:patelgreene-pw-01/Documents/Design

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25127/44912015201-plans-01-roadway-(1).pdf?sfvrsn=973e7471_1

441700-1_Cove Road PD&E_Final_Location Hydraulics Memo

a summary of data collection efforts and design analysis for Cove Road PD&E Study from SR 76/Kanner, engineering as applied through design standards and criteria set forth by the federal, state, and local, The design team collected and reviewed data from the following sources:  FDOT Drainage Manual, January 2024  FDOT Drainage Design Guide, January 2024  SFWMD Permit No. 43-00642-S, Cove Road,  Martin County Stormwater and Flood Protection Standards  Article 4, Site Design Standards, Division 8

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cove-road-study/441700-1_cove-road-pd-e_final_location-hydraulics-memo.pdf?sfvrsn=e57f43e8_1

FDOT_UHPC_Wshop2-SDOupdate_4-12-23

 UHPC Workshop #2 – SDO Design Updates Presenter: Steve Nolan, P . E . Date: April 12 th , 2023 April 2023 UHPC Workshop #2 – SDO Design Updates 1. Introduction 2. FDOT UHPC Structural, . Design Criteria is still under development 1. Structural Capacity (FHWA /AASHTO) 2. Geotech Pile, Construction Specifications (Section 455- Section B) 4. Need to update Design Criteria & Specifications, 2023 23 FDOT & AASHTO UHPC Design Guidance • FDOT Developmental Spec 349; • Transportation

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/structures/innovation/uhpc/fdot_uhpc_wshop2-sdoupdate_4-12-23.pdf?sfvrsn=821c6de_1

GAP SCAT Help Guide (State Employee Users)

- Select Yes or No in relaƟon to use of the Florida Greenbook/FDOT Design Manual in design and construcƟon. 4. Part 2 - Select Yes or No in relaƟon to design excepƟon and/or variaƟon process, - Return or Accept the agency/organizaƟon meeƟng the minimum design standards as required by Florida Law. 4. Part 2 – Return or Accept the agency's/organizaƟon’s compliance with the design excepƟon

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/lp/gap-scat-help-guide-(state-employee-users).pdf?sfvrsn=40a411b0_1

2024June-Thu03-LoadRatingInFlorida-AASHTOWareBrR

and share) • Competitive for Design and Construction, esp. DB • Opportunities for freight, requirements (many states, many specifications, coupled with BrDr design, legacy interface, e xamples https://www.aashtowarebridge.com/bridge-rating-and-design/training/ Michigan Te ch BrR, Rating came out almost perfectly at 36 tons, the weight of the design truck, which is what we would, • Unnecessary for yes/no pass/fail design, or where RF=1.0. • No effect where ε ~ 0 or RF~1.0; otherwise

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2024-june/2024june-thu03-loadratinginflorida-aashtowarebrr.pdf?sfvrsn=98a430d3_1

ACEC-FL Liaison Meeting Minutes 2024-05-29

adjustments in the work program for design and 3R projects. b) How is resiliency being considered, projects related to students (design, PDE, CEI, structures). ▪ Visual cues resonate more, correctly. ▪ CDAF: Inconsistent application across districts. Discuss District 6 policy – Post design is not included to consider CDAF. Only consider design – most projects take 2 years. In the case, and selection policy – no too subjective to include it in PD&E or design – only need to know for CEI 8

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd6/acec-fl-meeting-minutes/acec-fl-liaison-meeting-minutes-2024-05-29.pdf?sfvrsn=677704c8_1

TAYLOR COUNTY_TWOP2026-2030 WPPH_BY DESCRIPTION_11-13-2024_SUBJECT TO CHANGE

440057-1 - PERRY FOLEY APT DESIGN & CONSTRUCT HANGAR PFL11544 Type of Work: AVIATION REVENUE, for Project 440057-1 $950,000 $250,000 443552-3 - PERRY-FOLEY AIRPORT DESIGN & CONST TAXIWAY REALIGNMENT, - PERRY-FOLEY AIRPORT DESIGN & REHAB RW 18-36 CONCRETE ENDS Type of Work: AVIATION PRESERVATION, for Project 446363-1 $500,000 440057-2 - PERRY-FOLEY AIRPORT DESIGN AND CONST HANGARS PFL0014361, State $500,000 $500,000 Total for Project 440057-2 $500,000 $500,000 446364-1 - PERRY-FOLEY APT DESIGN

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/documents-by-description/taylor-county_twop2026-2030-wpph_by-description_11-13-2024_subject-to-change.pdf?sfvrsn=ad9aaf9a_1

TAYLOR COUNTY_TWP2026-2030 WPPH_BY ITEM_11-13-2024_SUBJECT TO CHANGE

- PERRY FOLEY APT DESIGN & CONSTRUCT HANGAR PFL11544 Type of Work: AVIATION REVENUE/OPERATIONAL Phase, $950,000 $250,000 440057-2 - PERRY-FOLEY AIRPORT DESIGN AND CONST HANGARS PFL0014361 Type of Work, $500,000 Total for Project 440057-2 $500,000 $500,000 443552-3 - PERRY-FOLEY AIRPORT DESIGN, $5,000,000 446363-1 - PERRY-FOLEY AIRPORT DESIGN & REHAB RW 18-36 CONCRETE ENDS Type of Work, State $50,000 Total for Project 446363-1 $500,000 446364-1 - PERRY-FOLEY APT DESIGN & CONSTRUCT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/documents-by-type/taylor-county_twp2026-2030-wpph_by-item_11-13-2024_subject-to-change.pdf?sfvrsn=55fb2f9e_1

100318-STIC-Meeting-Notes Nov2018

and requirements contained in Chapter 126, Lane Elimination Projects, of the FDOT Design Manual. Projects, the Department’s multi‐disciplinary offices including Planning, Roadway Design and Traffic Engineering, through Roadway Design Intersection Lighting Initiative. FDOT is in the process of inventorying, models. Based on the initial results, the modeled 2‐D design stages closely resembled those that were, characteristics and bridge design. Over the next few months, we will be conducting teleconference

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2018/100318-stic-meeting-notes-nov2018.pdf?sfvrsn=2a916ecc_1

SP4570000

in the Contract Documents. 457-2.3.1PortlandCementGrout:Useamix design of portland cement, fine aggregate, psi at 28 days and a slump of 7 inches to 9 inches. Submit the design mix to the Engineer, for cathodic protection jackets. Submit the design mix to the Engineer for approval, . Testmaterials for portland cement grout and Class IV concrete as required in Section 346 for approved design, as required for the Department approved design mixes. Test the materials at a frequency of one set

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/workbook/sp4570000.pdf?sfvrsn=4d6b3526_2

SP4570000

in the Contract Documents. 457-2.3.1 Portland Cement Grout: Use a mix design of portland cement, fine, inches to 9 inches. Submit the design mix to the Engineer for approval by the Department before placing, jackets. Submit the design mix to the Engineer for approval by the Department before placing any, cement grout and Class IV concrete as required in Section 346 for approved design mixes. Perform, for the Department approved design mixes. Test the materials at a frequency of one set of tests per

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/january-2020/workbook/sp4570000.pdf?sfvrsn=e0250b2_2
20 of 13231 results