13230 search results for DESIGN

9900500.origind

to the PPM, Design Standards, SDG, CPAM or other manual? Yes, Design Standard 600, Sheet 13 Is a Design, specification change. This change was proposed by Chester Henson of the Roadway Design Office to remove

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/internal/9900500.origind.pdf?sfvrsn=5d48043b_0

5340500.origind

 ORIGINATION FORM Date: June 20, 2013 Originator: Cheryl Hudson Contact Information: Structures Design (CO) 850-414-5332 Specification Title: Concrete Noise Wall Specification Section, Article, by these changes? Construction Are changes needed to the PPM, Design Standards, SDG, CPAM or other manual? No Is a Design Bulletin, Construction Memo, or Estimates Bulletin needed? No. Contact the State, Design Office to revise field construction erection tolerances

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/internal/5340500.origind.pdf?sfvrsn=ddfb7440_0

SP7140000

 MOTORIST AID CALL BOX RELOCATION. (REV 8/24/10) (1-14) PAGE 933. The following new Section is added after Section 713: SECTION 714 MOTORIST AID CALL BOX RELOCATION 714-1 Description. Relocate existing Motorist Aid Call Boxes and construct new Motorist Aid Call Box Concrete Pads in accordance with Design Standards, Index 17600 and the details and notes shown in the Contract Documents. 714-2 Materials. Use the existing call box assemblies and any additional new materials required

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/workbook/sp7140000.pdf?sfvrsn=f068eca4_0

3500902-723resp

 3500902 All Jobs 3500902 CEMENT CONCRETE PAVEMENT COMMENTS FROM INTERNAL/INDUSTRY REVIEW Deborah Ihsan Deborah.Ihsan@dot.state.fl.us 954-777-4387 Comments: (8-31-22 Industry) Cement Concrete Pavement- The Standard spec section 350-2 requires a concrete strength of 3000 psi as “ Submit a mix design to the Engineer for approval prior to use. Provide concrete with a minimum 28-day compressive strength of 3,000 psi and maximum water to cementitious materials ratio of 0.50

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/comments-responses/3500902-723resp.pdf?sfvrsn=6c79eb3d_1

3502000-723comm

be eligible for design build lump sum projects as well? Response: ******************************************************************************

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/comments-responses/3502000-723comm.pdf?sfvrsn=71a41959_1

Previous Year's DME Memorandums

(DBE) Requirements 07-03 Design for Scour and Load Rating for Local Government Bridges 07-02

https://www.fdot.gov/maintenance/dme/dmepreviousmemos.shtm

Push-Button Specifications

INDEX A-Z Search Push Button Specifications Guidelines for Usage of the Push Button Specifications Push Button Specifications are to be included in all Construction and Traffic Operations Push Button Contracts. Do not use for Maintenance Contracts. Do not use for Design-Build Push Button Contracts. Push Button

https://www.fdot.gov/programmanagement/otherfdotlinks/pushbutton/default.shtm

Errors and Omissions

Search Errors and Omissions The Department’s Procedure Number 375-020-010 (updated May 2025) prescribes the process to identify and investigate Errors and Omissions by Design consultants and CEI consultants. A companion Errors & Omissions Guidelines and Forms document (Redline Dated 4/14/2025) contains additional details to assist with using

https://www.fdot.gov/designsupport/pm/EandO

LAP Manual

and Delivery (State and Federal Programs) Chapter 17 - Preliminary Engineering and Design Chapter 18

https://www.fdot.gov/programmanagement/lap/lap-toc.shtm

Invitation to Innovation

for every transportation dollar invested. Office Initiatives Design Innovation Submit

https://www.fdot.gov/agencyresources/innovation/default.shtm

F3Y87Addendum001

 Florida Department of Transportation RON DESANTIS GOVERNOR 1074 Hwy 90 Chipley, Florida 32428 JARED W. PERDUE, P.E. SECRETARY www.fdot.gov June 19, 2025 ADDENDUM NO. 1 To: ALL PLANS AND/OR PROPOSAL HOLDERS FINANCIAL ITEM NUMBER: 44995145201 CONTRACT NUMBER: F3Y87 DESCRIPTION: Licensed Roofing Contractor to make repairs to our Chipley Design Building roof. If you are a PLANS and/or PROPOSAL HOLDER, this is your authorization to make the following changes to the plans package

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/fco-contracts/f3y87/f3y87addendum001.pdf?sfvrsn=83611fdd_1

LAPCOP Members

Office Terry Watson (850) 414-4763 FDOT Construction Lazaro Mesa (305) 640-7427 FDOT Design Derwood

https://www.fdot.gov/programmanagement/lap/lapcop/LAPCoPmembers

LRG_Contacts_District_2_v4

 1/9/2023 KEY DISTRICT CONTACTS D I S T R I C T2 Please refer to Partnering with FDOT: A Resource Guide for Local Governments to learn more about how to partner with FDOT. Additional information for this District can be found here Position/Office Contact Contact Information Community Planning Coordinator Brian Austin E: brian.austin@dot.state.fl.us P: 904-360-5664 Construction Office Scott Lent E: scott.lent@dot.state.fl.us P: 386-961-7730 Design Office Kathy Thomas E

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/policy/local-resource-guide/lrg_contacts_district_2_v4.pdf?sfvrsn=5cc38edc_10

District Five Contracts Office

Links Letting & Project Information Letting Results Online Ordering New Bidders Orientation Design

https://www.fdot.gov/contracts/district-offices/d5/default.shtm

Construction, Engineering & Inspections

administration, daily inspection, project documentation, submittal review, design support

https://www.fdot.gov/traffic/itsfm/construction-engineering-inspection

Context-Based Solutions Contacts

Search Context-Driven Network Design Coordinators SW Statewide Allie Cladwell 605 Suwannee Street, MS 32Tallahassee, Florida 32399-0450 Phone: (850) 414-4330 D1 District One Erica McCaughey Counties: Charlotte, Collier, De Soto, Glades, Hardee, Hendry, Highlands, Lee, Manatee, Okeechobee, Polk

https://www.fdot.gov/roadway/context-based-solutions/context-based-solutions-contacts

Complete Streets Webinars

Search Videos and Webinars Please use the links below to download or stream video presentations related to Context-Based Solutions and Context Classification. Videos Description District 5 Context Classification Overview video of the context classification process and it's role in determining design criteria and project planning. Produced by FDOT

https://www.fdot.gov/roadway/csi/csiwebinars.shtm

19-14-Hill-TDMM

and applications ​ • Through the lens of engineering and design ​ • Why it matters​ • Project impacts, & Environmental (PD&E) studies bridge the planning and design phases, using models to estimate the future, r i o u s design configurations are placed into the model network to test the effectiveness of each design schematic. Modeling in Engineering SR 9 / I-95 PD&E Study 14 The TDMM provides

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2025-june/19-14-hill-tdmm.pdf?sfvrsn=890b96d5_1

Engineering Resources

Projects August 2021 FDOT Context Classification Guide FDOT Design Manual Drainage Design Guide, Project)Planning and PD&E (CE2) and Design (Primavera) (PDF) (MS Project)Planning and PD&E (EA, Statewide Stormwater Management Plan EPA Region 4 Sole Source Aquifer Project Review Drainage Design Guide

https://www.fdot.gov/environment/oem-divisions/eng/engineering-resources
20 of 13230 results