700-020

2024-T4 b. Hex Nuts: ASTM F467, 2024-T4 a. Flat Head and Button Head Bolts: ASTM F 468, Alloy, and one flat turn at the bottom in accordance with replaced by D10 Spiral Wire @ 6” pitch, with three flat turns At the Contractor's option, the #4 tie bars at 12” o.c. may be Reinforcing bars, ). Assemble Post to Stub with Base Bolts and three flat 3. loosening. Treat damaged galvanizing. D. Burr, n d B e a m s - 1 5 % H T w o W i n d B e a m s - 2 1 % H (Flange Width

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/idx/700-020.pdf?sfvrsn=37c5582e_3

700-020

2024-T4 b. Hex Nuts: ASTM F467, 2024-T4 a. Flat Head and Button Head Bolts: ASTM F 468, Alloy 2024-T4, , the circular cross section shown Specification 415. at the top and one flat turn at the bottom in accordance with replaced by D10 Spiral Wire @ 6” pitch, with three flat turns At the Contractor's, Bolts and three flat 3. loosening. Treat damaged galvanizing. D. Burr threads at junction with nut, % H T w o W i n d B e a m s - 2 1 % H (Flange Width in inches) x (lb/ft

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/700-020.pdf?sfvrsn=4c581ad6_1

700-020

2024-T4 b. Hex Nuts: ASTM F467, 2024-T4 a. Flat Head and Button Head Bolts: ASTM F 468, Alloy 2024-T4, For precast foundations, the circular cross section shown Specification 415. at the top and one flat turn at the bottom in accordance with replaced by D10 Spiral Wire @ 6” pitch, with three flat turns, to Stub with Base Bolts and three flat 3. loosening. Treat damaged galvanizing. D. Burr threads, e a m s - 1 5 % H T w o W i n d B e a m s - 2 1 % H (Flange Width

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/idx/700-020.pdf?sfvrsn=f60d26ed_2

4500000.origind

. For all beam members, use side forms designed to be removed without damaging the top flange, of the form with the top flange after release of the form. Do not subject the top flange to any vertical

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/internal/4500000.origind.pdf?sfvrsn=919064ed_0

SampleResumes

, P.E. Fla. License No. 0123 (06/1995) BSCE from UF in 1990 John has worked in the area of CEI, – 01/2003-12/2006 This structure is a 600’ CIP flat slab structure with 30’ spans. John served as a Project, length of 250’ and a main unit of 1040’. The main span is 400’ long with 320’ flanking spans

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procurement/pdf/sampleresumes.pdf?sfvrsn=3d385b6a_10

2026FDM220RR

signal within the project is connected to the crossing’s flashing light signal and gate. The FAC, A flagger must be present while any work within railroad R/W is being performed. Topic, and pedestrians are vulnerable to challenges with flangeway gaps at skewed crossings. The Diagnostic Team must, line of sight to the flashing signals.] 8B.10 2 Option Standard Replace paragraph with “STOP HERE, , flashing light signals, and automatic gates. Consider the following when designing these devices: (1

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm220rr.pdf?sfvrsn=36ef25e4_16

9950201FHWA - Revised

to be reduced to 2.5 inches or less, when influenced by high wind conditions, and return to a flat, to give confirmation that the RRFB is in operation. The flash rate of the confirmation light shall not be between 5 and 30 flashes per second. SUBARTICLE 995-6.5 is deleted and the following, be supplied with hardware for attaching the top and bottom half of the cabinet onto a flat or round surface, anchor bolts, nuts, lock washers, and flat washers in accordance with ASTM A153. The anchor bolts must

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/fhwa/9950201fhwa---revised.pdf?sfvrsn=87a96ceb_1

4500000.impl

designed to be removed without damaging the top flange of the beam. Remove the forms horizontally away from the beam by a method that prevents any contact of the form with the top flange after release of the form. Do not subject the top flange to any vertical force at any time. Include the form, of the flange. 450-10.3.2.2 AASHTO Type III, Type IV and Florida I-Beams 45 and 54 and Voided Units, layer will be such that the top of the concrete is just above the top of the bottom flange. In voided

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/implemented/4500000.impl.pdf?sfvrsn=652c13ac_0

536-001

timber posts. Washers are not required at steel post flanges and panel lap splices. Do not place 4, may 6. MATERIALS: Use timber and steel posts and offset blocks in head contacts the flange. nail through the unused flange Bolt Hole and bend the nail so its with ASTM A153 hot-dip galvanization, W-Beam Block (Steel Post Similar) Timber Post (Shown) (See Sheet 9) Flared End Unit Panel W, . Edge of 2" Misc. Asphalt Pavt. Edge of 2" Misc. Guardrail Face of (1:10 Slope or Flatter Reqd

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/idx/536-001.pdf?sfvrsn=8ee2b6f5_1

536-001

timber posts. Washers are not required at steel post flanges and panel lap splices. Do not place 4, may 6. MATERIALS: Use timber and steel posts and offset blocks in head contacts the flange. nail through the unused flange Bolt Hole and bend the nail so its with ASTM A153 hot-dip galvanization, W-Beam Block (Steel Post Similar) Timber Post (Shown) (See Sheet 9) Flared End Unit Panel W, . Edge of 2" Misc. Asphalt Pavt. Edge of 2" Misc. Guardrail Face of (1:10 Slope or Flatter Reqd

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/536-001.pdf?sfvrsn=3dfd8309_1

536-001

flanges and panel lap splices. Do not place 4. BUTTON-HEAD BOLTS: Install Button-Head Bolts where, in head contacts the flange. nail through the unused flange Bolt Hole and bend the nail so its, Sheet 9) Flared End Unit Panel W-Beam ") 2 1 (9'-4 Panel W-Beam 9 / 2 6 / 2 0 2 5 2, . Asphalt Pavt. Edge of 2" Misc. Guardrail Face of (1:10 Slope or Flatter Reqd.) 'DOUBLE FACED, (Only) (See Note 6) Rounded) (Flat or Impact Head Double Faced Max. B B 2 ' - 6 " N

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/idx/536-001.pdf?sfvrsn=2ffd1340_1

E53F8

 Florida Department of Transportation Bid Solicitation Notice and Approximate Quantities Letting:Call Order:010Proposal:E53F8District:05 Counties: 05240604 DIST/ST-WIDE,FLAGLER,VOLUSIA Road Name:SR 9 Limits:73001000 Project(s):45022745201(*) Federal Aid No: N/A Total Roadway Length:1.830MilesContract Days:160 Total Bridge Length:0.000MilesLetting Date:06/04/24 Total Proposal Length, ) at Old Dixie Highway in Flagler County and State Road 9 (I-95) at State Road 421 in Volusia County

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2024/jun04/e53f8.pdf?sfvrsn=6abeeb6e_1

TMA MPO areas

. Hernando/Citrus MPO non-TMA MPO 9. Lake-Sumter MPO non-TMA MPO 10.Volusia-Flagler TPO*** Daytona Beach, Lauderdale TMAs are within multiple MPOs Volusia-Flagler TPO, MetroPlan Orlando, and Polk TPO contain

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/policy/metrosupport/florida-tma-mpo-areas.pdf?sfvrsn=8548ff45_11

09292022-2

: Search and Rescue Efforts Underway Following Hurricane Ian TALLAHASSEE, Fla. — This afternoon, at SR-70 – All lanes closed Flagler CountySR-100 Eastbound at N. Central Avenue – All lanes closed, , plywood, batteries, flashlights, and other materials. Additionally, 30 fuel trucks are staged at Lowe, Flagler Volusia CareerSource Central Florida CareerSource Brevard CareerSource Pinellas Careersource, , Dixie, Duval, Flagler, Gilchrist, Glades, Hardee, Highlands, Hendry, Hernando

https://www.fdot.gov/info/co/news/2022/09292022-2

Modal Mover Newsletter March 2023_FINAL

Bulletin Winter 2023 Issue - SPOTLIGHT—Pia Thomas, Flagler County Board of County Commissioners, Gold, credit and debit cards, digital wallets, as well as the Flamingo Fa res smartcard or mobile app

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/communications/archive/modal-mover-newsletter-march-2023_final.pdf?sfvrsn=9d4b72b7_1

2024FDM915PlanProfile

the following labeling and dimensions: • Flag and station the begin and end project limits, centerline or baseline of construction. • Flag and station the begin and end of project exceptions (e.g., Culverts Bridge-sized culverts (a.k.a., bridge culverts) are defined in FDM 265.1 . Flag, bridges and approach slabs by simple outline. Flag and station the begin station and end station, . Provide the following labeling and dimensions: • Flag and station the begin and end project

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm915planprofile.pdf?sfvrsn=69390881_1

2024FDM915PlanProfile

. Provide the following labeling and dimensions: • Flag and station the begin and end project limits, centerline or baseline of construction. • Flag and station the begin and end of project, Culverts Bridge-sized culverts (a.k.a., bridge culverts) are defined in FDM 265.1 . Flag and station, and approach slabs by simple outline. Flag and station the begin station and end station for the bridge, the design intent of the improvements. Provide the following labeling and dimensions: • Flag

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm915planprofile.pdf?sfvrsn=42e28c68_1

2025FDM915PlanProfile

the following labeling and dimensions: • Flag and station the begin and end project limits and construction, . • Display station equations along the centerline or baseline of construction. • Flag and station, Culverts Bridge-sized culverts (a.k.a., bridge culverts) are defined in FDM 265.1. Flag and station, and approach slabs by simple outline. Flag and station the begin station and end station for the bridge, the following labeling and dimensions: • Flag and station the begin and end project and construction limits

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm915planprofile.pdf?sfvrsn=86850325_1